Filter interviews by
I applied via LinkedIn and was interviewed before Oct 2023. There was 1 interview round.
HVAC stands for Heating, Ventilation, and Air Conditioning.
HVAC stands for Heating, Ventilation, and Air Conditioning
HVAC is responsible for maintaining indoor air quality and comfort
HVAC systems include components like furnaces, air conditioners, and ventilation ducts
The fan coil unit (FCU) is full of water or condensate.
Check for clogged drain lines or condensate pump failure.
Inspect the drain pan for any leaks or cracks.
Ensure the unit is properly leveled to allow for proper drainage.
Check the air filter for any blockages that may be causing the unit to overflow.
Chillers and ahu use in comrhical buldling
lp hp switch , anit frzeer switch ,Lp,hp trandsuer , flow flow switch, sensor errr. under voltage alarm , high viltage alarm, low amp alarm, comp high temp etc. pressure hold 180PSI. micron 500hurnaderd is required for gas chagre ,...
airhandling unit , fan coil unit . ahu . coil fan filer , motor , water criculation in coil blower air supply through duct in room FCU insatailltion in the room justblike water cool unit with blower , cooling tower use chiller dischagre temp condcation , ser pump perimary pump use in chiler and ahu
I applied via Newspaper Ad and was interviewed before Feb 2023. There were 2 interview rounds.
Energy Efficiency Ratio (EER) and Integrated Part Load Value (IPLV) are important metrics used to measure the efficiency of chillers.
EER is the ratio of cooling output to the electrical power input of a chiller at a specific operating condition.
IPLV is an average efficiency value calculated at various part load conditions, representing the chiller's performance over a typical operating cycle.
Both EER and IPLV help in c...
I was interviewed in Jan 2023.
Universal Voltas LLC interview questions for popular designations
I applied via Referral and was interviewed before Sep 2023. There was 1 interview round.
I applied via Walk-in and was interviewed before Oct 2022. There were 2 interview rounds.
I applied via Company Website and was interviewed before Jun 2022. There were 3 interview rounds.
Merits and demerits of fresher on the job site training vs class room training and delegation of responsibilities vs mentoring
Small size mining equipment offers flexibility and lower initial cost, but may have lower productivity compared to big size equipment. Optimization of utilization can help reduce cost per ton.
Small size equipment offers flexibility to access narrow or difficult areas, reducing the need for additional equipment or manual labor.
Big size equipment may have higher productivity and efficiency, leading to lower cost per ton ...
I applied via LinkedIn and was interviewed before Apr 2022. There were 3 interview rounds.
GD by video call with HR, Procurement team & client
I applied via Walk-in and was interviewed before Aug 2022. There were 2 interview rounds.
33/11 kv pss refers to a 33kV/11kV primary substation working.
33/11 kv pss stands for a primary substation with a voltage level of 33kV/11kV.
It is responsible for stepping down the high voltage from the transmission line to a lower voltage suitable for distribution to consumers.
The substation includes equipment such as transformers, circuit breakers, and protection devices.
It plays a crucial role in ensuring reliable p...
I applied via Company Website and was interviewed before Oct 2020. There was 1 interview round.
Top trending discussions
Interview experience
based on 74 reviews
Rating in categories
Hvac Technician
31
salaries
| ₹0.6 L/yr - ₹8.5 L/yr |
Hvac Supervisor
12
salaries
| ₹5.9 L/yr - ₹13.8 L/yr |
Service Engineer
7
salaries
| ₹2.4 L/yr - ₹7 L/yr |
Hvac Engineer
6
salaries
| ₹10 L/yr - ₹12 L/yr |
Site Engineer
6
salaries
| ₹3 L/yr - ₹6 L/yr |
Blue Star
Voltas
Daikin
Carrier