Upload Button Icon Add office photos

Filter interviews by

Universal Voltas LLC Site Engineer Interview Questions and Answers

Updated 15 Aug 2023

Universal Voltas LLC Site Engineer Interview Experiences

1 interview found

Site Engineer Interview Questions & Answers

user image praveen dubey

posted on 15 Aug 2023

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Aug 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. 33/11 kv pss working
  • Ans. 

    33/11 kv pss refers to a 33kV/11kV primary substation working.

    • 33/11 kv pss stands for a primary substation with a voltage level of 33kV/11kV.

    • It is responsible for stepping down the high voltage from the transmission line to a lower voltage suitable for distribution to consumers.

    • The substation includes equipment such as transformers, circuit breakers, and protection devices.

    • It plays a crucial role in ensuring reliable p...

  • Answered by AI
  • Q2. Ht line devlopment and planning
  • Q3. About youself and projects

Interview questions from similar companies

I applied via Walk-in

Round 1 - HR 

(1 Question)

  • Q1. About your self and salary discussion
Round 2 - Technical 

(1 Question)

  • Q1. Plant maintainace for instrumentation related

Interview Preparation Tips

Interview preparation tips for other job seekers - Family back ground and relationship back ground

I applied via Referral and was interviewed in Feb 2021. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. What is M-25 Grade concrete and what are its ratio
  • Ans. 

    M-25 Grade concrete is a type of concrete with a compressive strength of 25 megapascals (MPa).

    • M-25 Grade concrete is commonly used in construction projects.

    • The ratio of M-25 Grade concrete is 1:1:2, which means 1 part cement, 1 part fine aggregate (sand), and 2 parts coarse aggregate (stone).

    • The mix proportion of M-25 Grade concrete is designed to achieve a desired strength and durability for the specific application.

    • F...

  • Answered by AI
  • Q2. How many bricks required in 1 cum.
  • Ans. 

    The number of bricks required in 1 cubic meter depends on the size of the bricks and the thickness of the mortar joints.

    • The size of the bricks and the thickness of the mortar joints determine the number of bricks needed.

    • Standard brick sizes are commonly used in construction.

    • For example, if the size of the brick is 200mm x 100mm x 75mm and the thickness of the mortar joint is 10mm, the calculation would be as follows:

    • - ...

  • Answered by AI
  • Q3. 480 bricks required

Interview Preparation Tips

Interview preparation tips for other job seekers - Good communication skill
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Nov 2024. There were 2 interview rounds.

Round 1 - Group Discussion 

What type of work termite tretment.

Round 2 - HR 

(5 Questions)

  • Q1. New work and new site visit.
  • Q2. What type work ?
  • Q3. How to work termite treatment ?
  • Q4. How to control mosqutio ?
  • Q5. How to control bedbugs etc...

Interview Preparation Tips

Interview preparation tips for other job seekers - Strength your mindset.
Be prepared for anything.
Learn new school.
Act kindly to everyone.
Anytime active.
Interview experience
4
Good
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Sep 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. How many Experience your work
  • Ans. 

    I have 5 years of experience working as a Site Supervisor in construction projects.

    • 5 years of experience as a Site Supervisor

    • Managed multiple construction projects simultaneously

    • Ensured adherence to safety regulations and project timelines

    • Coordinated with subcontractors and communicated with clients

    • Implemented cost-saving measures without compromising quality

  • Answered by AI
  • Q2. You Interest Change your company
  • Q3. Do you change your change
  • Ans. 

    Yes, I am always open to change and adapt to new situations in order to improve efficiency and effectiveness.

    • I believe in continuous improvement and am willing to change my approach if it leads to better results

    • I am open to feedback and suggestions from team members and stakeholders

    • I have successfully implemented new processes and procedures in the past to enhance productivity

  • Answered by AI
  • Q4. Sarary Expectations
  • Q5. Ok sir call again

Interview Preparation Tips

Interview preparation tips for other job seekers - I am trained Residential, Commercial good knowledge form pest control services.

Site Manager Interview Questions & Answers

Sodexo user image singh.mritunjay786@gmail.com

posted on 9 Nov 2023

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Related to profile and previous experience
Round 3 - Technical 

(1 Question)

  • Q1. Related to machinary maintenance and team management.
Round 4 - HR 

(1 Question)

  • Q1. Discussion related to joining and finance

I applied via Walk-in

Round 1 - HR 

(1 Question)

  • Q1. About your self and salary discussion
Round 2 - Technical 

(1 Question)

  • Q1. Plant maintainace for instrumentation related

Interview Preparation Tips

Interview preparation tips for other job seekers - Family back ground and relationship back ground

Interview Questionnaire 

4 Questions

  • Q1. Very basic Questions related to QA & Estimation
  • Q2.  Method of Estimation
  • Ans. 

    Method of estimation refers to the process of calculating the approximate cost of a project or task.

    • Estimation can be done using various methods such as approximate quantities method, detailed estimate method, and unit rate method.

    • Factors such as labor cost, material cost, equipment cost, and overheads are taken into consideration while estimating.

    • Estimation can be done manually or using software such as AutoCAD, Excel...

  • Answered by AI
  • Q3. Ration of concrete
  • Ans. 

    The ratio of concrete refers to the proportion of cement, sand, and aggregate used in the mixture.

    • The most common ratio of concrete is 1:2:3, which means one part cement, two parts sand, and three parts aggregate.

    • Other ratios include 1:1.5:3 and 1:3:6, depending on the strength and durability required for the project.

    • The ratio of concrete can also be adjusted based on the type of project, climate conditions, and availa...

  • Answered by AI
  • Q4. What is Sub and super Structure
  • Ans. 

    Substructure refers to the part of a building or structure that is below ground level, while superstructure refers to the part above ground level.

    • Substructure includes foundation, basement, and retaining walls

    • Superstructure includes columns, beams, walls, and roof

    • Substructure is responsible for transferring loads to the ground, while superstructure provides support for the building or structure

    • Examples of substructure ...

  • Answered by AI

I applied via Referral and was interviewed in Feb 2021. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. What is M-25 Grade concrete and what are its ratio
  • Ans. 

    M-25 Grade concrete is a type of concrete with a compressive strength of 25 megapascals (MPa).

    • M-25 Grade concrete is commonly used in construction projects.

    • The ratio of M-25 Grade concrete is 1:1:2, which means 1 part cement, 1 part fine aggregate (sand), and 2 parts coarse aggregate (stone).

    • The mix proportion of M-25 Grade concrete is designed to achieve a desired strength and durability for the specific application.

    • F...

  • Answered by AI
  • Q2. How many bricks required in 1 cum.
  • Ans. 

    The number of bricks required in 1 cubic meter depends on the size of the bricks and the thickness of the mortar joints.

    • The size of the bricks and the thickness of the mortar joints determine the number of bricks needed.

    • Standard brick sizes are commonly used in construction.

    • For example, if the size of the brick is 200mm x 100mm x 75mm and the thickness of the mortar joint is 10mm, the calculation would be as follows:

    • - ...

  • Answered by AI
  • Q3. 480 bricks required

Interview Preparation Tips

Interview preparation tips for other job seekers - Good communication skill

Universal Voltas LLC Interview FAQs

How many rounds are there in Universal Voltas LLC Site Engineer interview?
Universal Voltas LLC interview process usually has 2 rounds. The most common rounds in the Universal Voltas LLC interview process are Resume Shortlist and Technical.
What are the top questions asked in Universal Voltas LLC Site Engineer interview?

Some of the top questions asked at the Universal Voltas LLC Site Engineer interview -

  1. 33/11 kv pss work...read more
  2. Ht line devlopment and plann...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 Universal Voltas LLC interview
WalkIn
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Interview Questions from Similar Companies

Siemens Interview Questions
4.1
 • 425 Interviews
Thermax Limited Interview Questions
4.2
 • 235 Interviews
LG Electronics Interview Questions
4.0
 • 187 Interviews
Sodexo Interview Questions
4.1
 • 155 Interviews
Blue Star Interview Questions
4.1
 • 151 Interviews
Daikin Interview Questions
4.2
 • 137 Interviews
Voltas Interview Questions
4.0
 • 123 Interviews
Leadec India Interview Questions
4.1
 • 63 Interviews
View all
Universal Voltas LLC Site Engineer Salary
based on 6 salaries
₹3 L/yr - ₹6 L/yr
16% more than the average Site Engineer Salary in India
View more details

Universal Voltas LLC Site Engineer Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-Life balance

5.0

Salary & Benefits

5.0

Job Security

5.0

Company culture

5.0

Promotions/Appraisal

5.0

Work Satisfaction

Explore 1 Review and Rating
Hvac Technician
31 salaries
unlock blur

₹0.6 L/yr - ₹8.5 L/yr

Hvac Supervisor
12 salaries
unlock blur

₹5.9 L/yr - ₹13.8 L/yr

Service Engineer
7 salaries
unlock blur

₹2.4 L/yr - ₹7 L/yr

Hvac Engineer
6 salaries
unlock blur

₹10 L/yr - ₹12 L/yr

Site Engineer
6 salaries
unlock blur

₹3 L/yr - ₹6 L/yr

Explore more salaries
Compare Universal Voltas LLC with

Blue Star

4.1
Compare

Voltas

4.0
Compare

Daikin

4.2
Compare

Carrier

3.8
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview