What type of work termite tretment.
For Pre Construction Anti Termite Treatment. The surface of the ground should be dry and clean. The chemical should be injected three times in a certain order into the ground. Firstly, the earth’s surface shall be drilled in 12mm diameter and 300mm deep at 150mm intervals below the PPC. Post construction. plinth area dril in home 45 degree angel 10" hole and gave 8/10" distance & wood area .
Spray continues inside the room. Drain area spray for anti larva treatment. Garden and out site for big fogger.
Wash bedding, clothes, and blankets in hot water . and one chemical ( propoxure20%) best work for bed bugs and cockroach and household insecticide.
I applied via Walk-in and was interviewed before Sep 2023. There was 1 interview round.
I have 5 years of experience working as a Site Supervisor in construction projects.
5 years of experience as a Site Supervisor
Managed multiple construction projects simultaneously
Ensured adherence to safety regulations and project timelines
Coordinated with subcontractors and communicated with clients
Implemented cost-saving measures without compromising quality
Yes, I am always open to change and adapt to new situations in order to improve efficiency and effectiveness.
I believe in continuous improvement and am willing to change my approach if it leads to better results
I am open to feedback and suggestions from team members and stakeholders
I have successfully implemented new processes and procedures in the past to enhance productivity
Top trending discussions
I applied via Approached by Company and was interviewed before Apr 2021. There were 2 interview rounds.
Group discussion
Coding test
I applied via Referral and was interviewed in Feb 2021. There was 1 interview round.
M-25 Grade concrete is a type of concrete with a compressive strength of 25 megapascals (MPa).
M-25 Grade concrete is commonly used in construction projects.
The ratio of M-25 Grade concrete is 1:1:2, which means 1 part cement, 1 part fine aggregate (sand), and 2 parts coarse aggregate (stone).
The mix proportion of M-25 Grade concrete is designed to achieve a desired strength and durability for the specific application.
F...
The number of bricks required in 1 cubic meter depends on the size of the bricks and the thickness of the mortar joints.
The size of the bricks and the thickness of the mortar joints determine the number of bricks needed.
Standard brick sizes are commonly used in construction.
For example, if the size of the brick is 200mm x 100mm x 75mm and the thickness of the mortar joint is 10mm, the calculation would be as follows:
- ...
I applied via Referral and was interviewed before Oct 2020. There were 4 interview rounds.
Power factor is the ratio of real power to apparent power in an AC circuit.
It is a measure of how efficiently electrical power is being used.
It ranges from 0 to 1, with 1 being the most efficient.
A low power factor can result in higher energy costs and equipment damage.
Capacitors can be used to improve power factor.
Example: A motor with a power factor of 0.8 requires 1.25 times more current than a motor with a power fa
I applied via Walk-in
I applied via Naukri.com and was interviewed in Mar 2023. There were 5 interview rounds.
LOTO (Lockout/Tagout) and LOTOTO (Lockout/Tagout of Tagout) procedures are important safety measures to prevent accidental start-up of machinery or equipment during maintenance or servicing.
LOTO procedure involves locking and tagging out energy sources to prevent accidental start-up.
LOTOTO procedure adds an extra layer of safety by requiring a second person to verify that all energy sources are properly locked out.
To e...
Incident investigation procedure involves identifying, analyzing, and documenting incidents to prevent future occurrences.
Gather information about the incident including date, time, location, and individuals involved.
Interview witnesses and those directly affected by the incident.
Review any relevant documentation or records related to the incident.
Analyze the root causes of the incident to determine contributing factor...
How to control your site,
How to convene safety is important
How to implement about safety culture
I appeared for an interview in Jan 2025.
based on 2 interviews
Interview experience
based on 2 reviews
Rating in categories
Operations Executive
210
salaries
| ₹2 L/yr - ₹5 L/yr |
Sales Executive
187
salaries
| ₹2.3 L/yr - ₹5 L/yr |
Customer Service Executive
67
salaries
| ₹1.9 L/yr - ₹5 L/yr |
Branch Manager
44
salaries
| ₹6 L/yr - ₹12.5 L/yr |
Service Planner
40
salaries
| ₹2.3 L/yr - ₹3.9 L/yr |
Sodexo
ISS Facility Services
BVG India
Leadec India