Upload Button Icon Add office photos

Ramky Infrastructure

Compare button icon Compare button icon Compare

Filter interviews by

Ramky Infrastructure Sr.Engineer-Projects Interview Questions and Answers for Experienced

Updated 14 Jun 2022

Ramky Infrastructure Sr.Engineer-Projects Interview Experiences for Experienced

1 interview found

Round 1 - HR 

(1 Question)

  • Q1. Your current location Your current CTC Your expected CTC
Round 2 - Technical 

(1 Question)

  • Q1. How to manage site Safety management
  • Ans. 

    Site safety management involves identifying and mitigating potential hazards to ensure a safe work environment.

    • Conduct regular safety audits and inspections

    • Provide safety training to all workers

    • Implement safety protocols and procedures

    • Ensure proper use of personal protective equipment

    • Encourage reporting of safety concerns and incidents

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and you must have knowledge of work which you have been completed or in process

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Apr 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Infrastructure development and its techniques.
  • Ans. 

    Infrastructure development involves planning, designing, constructing, and maintaining physical structures and facilities.

    • Infrastructure development includes transportation systems, buildings, water supply networks, and communication networks.

    • Techniques used in infrastructure development include project management, cost estimation, risk assessment, and environmental impact assessment.

    • Examples of infrastructure developm...

  • Answered by AI
  • Q2. Questions related to my work previous experience .

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepare what's shown on resume and having sufficient technical knowledge.
Round 1 - Technical 

(2 Questions)

  • Q1. Introduce yourself in breif?
  • Q2. Just prepare a good introduction where you'll be speaking about yourself for 4-5 min and that's it.

Interview Preparation Tips

Interview preparation tips for other job seekers - The rest they just ask basics about the technology you mentioned in your resume
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. System implementation process
  • Ans. 

    System implementation process involves planning, designing, testing, and deploying new software or hardware systems.

    • Planning phase involves defining project scope, setting goals, and creating a timeline.

    • Design phase includes creating system architecture, database design, and user interface.

    • Testing phase involves conducting various tests to ensure system functionality and performance.

    • Deployment phase includes installing...

  • Answered by AI
  • Q2. Role and responsibilities to monitor performance.
  • Ans. 

    Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.

    • Set clear performance expectations for team members

    • Provide regular feedback on performance

    • Track progress towards goals and objectives

    • Address any performance issues promptly and constructively

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Civil engineering
  • Q2. Civil engineering responsibility timely site work .
Round 3 - Technical 

(2 Questions)

  • Q1. Civil engineering
  • Q2. Site relative question
Round 4 - Technical 

(2 Questions)

  • Q1. Site Execution qution
  • Q2. Highway Road Project qution

Interview Preparation Tips

Interview preparation tips for other job seekers - Bridges ,Highway Road Project and Railway Project flyovers

I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. NEUTRAL AXIS IN RCC STRUCTURE
  • Ans. 

    The neutral axis is the line where the stress is zero in a reinforced concrete structure.

    • The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.

    • The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.

    • The position of the neutral axis affects the amount of reinforcement required in the tension zone.

    • The n...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - GRT TO WORK WITH THIS COMPANY
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Nov 2022.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Earth moving Equipment, crusher plant,hotmix plant concrete plant, operation and maintenance
  • Q2. Plant and equipment related

I applied via LinkedIn and was interviewed in May 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Details about your self.
Round 3 - Technical 

(1 Question)

  • Q1. Question from subject.

Interview Preparation Tips

Interview preparation tips for other job seekers - Face interview with confidence. Interview process is very simple.
Interview experience
3
Average
Difficulty level
Easy
Process Duration
-
Result
Selected Selected

I applied via Job Portal

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. How many year experience ?
  • Q2. How to use bentonite use before pulsing
  • Ans. 

    Bentonite is used as a drilling fluid to stabilize boreholes before pulsing.

    • Bentonite is mixed with water to form a slurry and pumped into the borehole.

    • The slurry fills the borehole and stabilizes the walls, preventing collapse.

    • After the bentonite has set, pulsing can be done without the risk of borehole collapse.

    • Pulsing is a technique used in geophysical exploration to measure the properties of the subsurface.

  • Answered by AI
  • Q3. 1.03 mgl to 1.10 mgl

Interview Preparation Tips

Interview preparation tips for other job seekers - Piling work(550mm,600mm,750mm and 1000mm dia pile),survey,Client bills

I applied via Referral and was interviewed in Nov 2021. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. What is the roles and responsibilities of safety person as per the BOCW act
  • Ans. 

    The safety person's roles and responsibilities as per the BOCW act include ensuring safety measures are in place, conducting safety inspections, and providing safety training.

    • Ensuring safety measures are in place at the worksite

    • Conducting safety inspections to identify potential hazards

    • Providing safety training to workers and management

    • Maintaining records of safety inspections and incidents

    • Ensuring compliance with safe...

  • Answered by AI
  • Q2. What are the roles and responsibilities of you in your current organization
Round 2 - HR 

(1 Question)

  • Q1. Salary expectation and other facilities required.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good organization feeling positive toward the company

Ramky Infrastructure Interview FAQs

How many rounds are there in Ramky Infrastructure Sr.Engineer-Projects interview for experienced candidates?
Ramky Infrastructure interview process for experienced candidates usually has 2 rounds. The most common rounds in the Ramky Infrastructure interview process for experienced candidates are HR and Technical.

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 740 Interviews
AtkinsRealis Interview Questions
4.0
 • 85 Interviews
GMR Group Interview Questions
4.1
 • 80 Interviews
Ashoka Buildcon Interview Questions
4.0
 • 64 Interviews
View all
Assistant Manager
111 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Engineer
95 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
72 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy Manager
57 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Assistant Manager
52 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Ramky Infrastructure with

Larsen & Toubro Limited

4.0
Compare

GMR Group

4.0
Compare

Hindustan Construction Company

4.2
Compare

Nagarjuna Construction Company

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview