Filter interviews by
The question asks to calculate the quantity of slrb and canal earthworks.
To calculate the quantity of slrb, you need to know the dimensions and specifications of the slrb.
To calculate the quantity of canal earthworks, you need to know the length, width, and depth of the canal.
You may also need to consider any slopes, embankments, or other factors that could affect the earthworks quantity.
I worked as a Civil Site Engineer at XYZ Construction Company.
Managed and supervised construction projects
Ensured compliance with building codes and regulations
Prepared and reviewed project plans and specifications
Coordinated with architects, contractors, and subcontractors
Performed site inspections and quality control checks
Resolved any issues or conflicts that arose during construction
Maintained project documentation
Bed and top width of canal can be calculated using Manning's formula and cross-sectional area of the canal.
Calculate the cross-sectional area of the canal using Manning's formula
Determine the depth of water in the canal
Calculate the bed width by dividing the cross-sectional area by the depth of water
Calculate the top width by adding twice the depth of water to the bed width
posted on 12 Jul 2023
I applied via Walk-in
In these round we just screening the students for next round GD is the process in which we just see the attitude, discipline and how they expressed there idea towards the topic that we give to them.
I have more knowledge in structural engineering.
Specialization in structural analysis and design
Extensive experience in designing buildings, bridges, and other structures
Knowledge of various materials and construction techniques
Familiarity with relevant codes and standards
Ability to perform structural calculations and simulations
posted on 25 Mar 2023
I applied via Newspaper Ad and was interviewed in Feb 2023. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Oct 2021. There were 3 interview rounds.
I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
Penetration test is a method of evaluating the security of a computer system or network by simulating an attack from a malicious source.
Penetration test involves identifying vulnerabilities in a system or network.
It includes attempting to exploit these vulnerabilities to determine the potential impact of a real attack.
The goal of a penetration test is to strengthen the security defenses of the system or network.
Common ...
Waterproofing is a process of making a structure or material resistant to the penetration of water.
Waterproofing involves applying materials or coatings to prevent water from seeping through surfaces.
It is commonly used in construction to protect buildings from water damage.
Examples of waterproofing materials include bituminous coatings, cementitious waterproofing, and liquid membrane systems.
Types of foundation include shallow, deep, and pile foundations.
Shallow foundations are used when the soil is strong enough to support the structure's weight, such as spread footings and mat foundations.
Deep foundations are used when the soil is weak and unable to support the structure's weight, such as pile foundations and drilled piers.
Pile foundations are deep foundations that consist of long, slender columns driven...
posted on 10 May 2024
posted on 14 May 2024
I applied via Naukri.com and was interviewed in Nov 2023. There were 2 interview rounds.
Kis co. Me kya kya kaam kiya
posted on 13 Dec 2022
I applied via Walk-in and was interviewed in Jun 2022. There were 2 interview rounds.
The basic concept for construction of a substation involves site selection, design, equipment installation, and commissioning.
Site selection involves identifying a suitable location for the substation based on factors such as proximity to power sources and load centers.
Design involves creating a plan for the substation layout, including the placement of equipment such as transformers, switchgear, and control systems.
Eq...
Single Line Diagram of Substation is a graphical representation of electrical distribution system in a substation.
It shows the electrical components and their connections in a simplified manner
It helps in understanding the flow of power and voltage levels in the system
It is used for planning, designing, and maintenance of the substation
It includes information about transformers, circuit breakers, busbars, and other equ...
I applied via Naukri.com and was interviewed in Jun 2022. There were 2 interview rounds.
To start OFC cable blowing, follow these steps
Ensure that the ducts are clean and free of any obstruction
Attach the cable blowing machine to the duct
Connect the cable to the machine and start the blowing process
Monitor the cable's progress and adjust the machine's speed as needed
Once the cable has been blown through the entire length of the duct, detach the machine and cable
I applied via Approached by Company and was interviewed in Apr 2022. There was 1 interview round.
based on 3 reviews
Rating in categories
Accountant
20
salaries
| ₹2.5 L/yr - ₹4.8 L/yr |
Senior Engineer
12
salaries
| ₹4.2 L/yr - ₹7.2 L/yr |
Civil Site Engineer
10
salaries
| ₹1.1 L/yr - ₹3.8 L/yr |
Senior Site Engineer
7
salaries
| ₹6 L/yr - ₹6.4 L/yr |
Junior Engineer Civil
7
salaries
| ₹1.5 L/yr - ₹3.5 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company