PVR PROJECTS Civil Site Engineer Interview Questions and Answers

Updated 5 Apr 2022

PVR PROJECTS Civil Site Engineer Interview Experiences

1 interview found

Round 1 - Technical 

(3 Questions)

  • Q1. Calculate qty of slrb ,canal earthworks qty etc
  • Ans. 

    The question asks to calculate the quantity of slrb and canal earthworks.

    • To calculate the quantity of slrb, you need to know the dimensions and specifications of the slrb.

    • To calculate the quantity of canal earthworks, you need to know the length, width, and depth of the canal.

    • You may also need to consider any slopes, embankments, or other factors that could affect the earthworks quantity.

  • Answered by AI
  • Q2. Previous company work
  • Ans. 

    I worked as a Civil Site Engineer at XYZ Construction Company.

    • Managed and supervised construction projects

    • Ensured compliance with building codes and regulations

    • Prepared and reviewed project plans and specifications

    • Coordinated with architects, contractors, and subcontractors

    • Performed site inspections and quality control checks

    • Resolved any issues or conflicts that arose during construction

    • Maintained project documentation

  • Answered by AI
  • Q3. Calculate bed and top width of canal
  • Ans. 

    Bed and top width of canal can be calculated using Manning's formula and cross-sectional area of the canal.

    • Calculate the cross-sectional area of the canal using Manning's formula

    • Determine the depth of water in the canal

    • Calculate the bed width by dividing the cross-sectional area by the depth of water

    • Calculate the top width by adding twice the depth of water to the bed width

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Naukri .com and reference of project manager

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Mivan formwork process?
  • Ans. 

    Mivan formwork is a construction technique that uses aluminum formwork system for casting concrete structures.

    • Mivan formwork involves setting up aluminum formwork panels, fixing reinforcement bars, pouring concrete, and removing the formwork after the concrete has set.

    • It is a fast and efficient construction method commonly used for high-rise buildings and large residential projects.

    • The system allows for smooth finishes...

  • Answered by AI
  • Q2. Finishing process
  • Q3. Reinforcement related
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Not Selected

I applied via Newspaper Ad and was interviewed in Feb 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About Carriageways, Service Roads and patchwork i.e pot Holes, slippage cracks i.e alligator crack, horizontal or vertical crack, Undulating surface,rain cut, Metals beam crash barrier,Gaurd Rail or Mild s...
Round 3 - Technical 

(3 Questions)

  • Q1. Checking level of the layer
  • Q2. Testing the field dry density of the bed like Sub Grade ,GSB,WMM, DBM or BC
  • Q3. Checking the road width

Interview Preparation Tips

Interview preparation tips for other job seekers - Sir I m very hardworker employee .
I m very panchtual for my job duty and going to site daily and prepare daily progress report and also prepare monthly progress report.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be truthful in your resume. It is very easy to catch false or lies during the interview by asking basic questions.
View all tips
Round 2 - Group Discussion 

In these round we just screening the students for next round GD is the process in which we just see the attitude, discipline and how they expressed there idea towards the topic that we give to them.

Round 3 - Technical 

(2 Questions)

  • Q1. Just ask the technical questions regard what you learn till now through your studies.
  • Q2. In which subject you have more knowledge?
  • Ans. 

    I have more knowledge in structural engineering.

    • Specialization in structural analysis and design

    • Extensive experience in designing buildings, bridges, and other structures

    • Knowledge of various materials and construction techniques

    • Familiarity with relevant codes and standards

    • Ability to perform structural calculations and simulations

  • Answered by AI
Round 4 - HR 

(3 Questions)

  • Q1. What's your strength?
  • Q2. If you are selected then what's your responsibility for your company?
  • Q3. Your able to work in a flexible time .

Interview Preparation Tips

Interview preparation tips for other job seekers - First your know about the company and post in which you apply.
You should have knowledge in which post you apply.
For example if you are applying for site engineer then you should have knowledge of building materials, test of materials. IS code knowledge. Ms Excel, ms word, etc . Knowledge you should have. There are some software that also used in construction.

I applied via Naukri.com and was interviewed in Oct 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Asked My previous projects details
  • Q2. I'm telling all answers

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical it lasted for about 30 minute's. Most of questions asked to me were related to my previous projects

I applied via Naukri.com and was interviewed before May 2017. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. What is the density of soil in embankment layer.
  • Ans. 

    The density of soil in the embankment layer varies depending on the type of soil and compaction methods used.

    • The density of soil in the embankment layer is typically measured in terms of dry density or wet density.

    • Dry density refers to the mass of solid soil particles per unit volume of soil, while wet density includes the mass of water as well.

    • The density of soil in the embankment layer is influenced by factors such a...

  • Answered by AI

Interview Preparation Tips

General Tips: This interview was a technical one.The interview eanted to test both my knowledge and communications skills.Most of questions are related with Transportation.
Skills: Technical Knowledge(ML, Technical Knowledge(ML
Duration: <1 week

I appeared for an interview before Jul 2016.

Interview Questionnaire 

1 Question

  • Q1. Temperature of Prime coat, Tack Coat, Penetration Grade, various tests on Bitumen, asphalt works, Rolling pattern, Rolling temperature as well as Asphalt Laying temperature, densities of various compacted ...

Interview Preparation Tips

Skills: Knowledge Of Construction Practices, Construction Technology
Round 1 - Technical 

(1 Question)

  • Q1. Introduction,goals,Explain your final year project

Interview Preparation Tips

Interview preparation tips for other job seekers - Do preperation on communication skill development,focus on technical area,have a goal
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. What is the Density of cement?
  • Ans. 

    The density of cement is around 1440 kg/m³.

    • The density of cement varies depending on the type of cement.

    • The density of Portland cement is around 1440 kg/m³.

    • The density of lightweight cement is around 1000 kg/m³.

    • The density of high-density cement is around 3000 kg/m³.

  • Answered by AI
  • Q2. What is clear cover in column?
  • Ans. 

    Clear cover in column refers to the distance between the surface of the reinforcement and the outer surface of the concrete.

    • Clear cover is important to protect the reinforcement from corrosion and to ensure proper bonding between the reinforcement and concrete.

    • The required clear cover for columns depends on factors such as the type of structure, exposure conditions, and size of the reinforcement.

    • For example, in a coast...

  • Answered by AI
  • Q3. What is bending moment formula?
  • Ans. 

    Bending moment formula calculates the internal bending moment in a beam or structure.

    • Bending moment formula is M = F * d

    • M is the bending moment, F is the force applied, and d is the distance from the force to the point of interest

    • Bending moment can be positive or negative depending on the direction of the force and the orientation of the beam

    • Bending moment is an important factor in designing and analyzing structures

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Construction Group Site Engineer interview:
  • Bis 456
Interview preparation tips for other job seekers - Conduct interview on phone by using video call so that u can find good engineer easily.

Interview Questionnaire 

5 Questions

  • Q1. What the thickness of compreg ply and it's size
  • Ans. 

    The thickness of compreg ply varies depending on its intended use and application. Its size can also vary depending on the manufacturer and customer requirements.

    • The thickness of compreg ply can range from 3mm to 25mm or more

    • The size of compreg ply can vary from 4ft x 8ft to 5ft x 10ft or more

    • The thickness and size of compreg ply can be customized based on the specific requirements of the project

    • Compreg ply is commonly...

  • Answered by AI
  • Q2. Maximum reapetation of ply shuttering
  • Ans. 

    The maximum repetition of ply shuttering depends on various factors such as quality of ply, weather conditions, and type of concrete.

    • The maximum repetition of ply shuttering can range from 5 to 20 times depending on the above factors.

    • If the quality of ply is good and weather conditions are favorable, the ply shuttering can be reused more number of times.

    • However, if the concrete mix is harsh or the weather conditions ar...

  • Answered by AI
  • Q3. Consumption of shuttering oil per ltr how much area covered
  • Ans. 

    The consumption of shuttering oil per liter depends on the area covered.

    • The consumption of shuttering oil per liter can vary depending on factors such as the type of shuttering material, surface texture, and weather conditions.

    • On average, 1 liter of shuttering oil can cover approximately 10-15 square meters of surface area.

    • However, this can vary significantly based on the absorbency of the surface and the thickness of ...

  • Answered by AI
  • Q4. How much elongation % of fe550 steel
  • Ans. 

    The elongation % of fe550 steel varies depending on the specific grade and manufacturing process.

    • The elongation % of fe550 steel can range from 14% to 20%.

    • It is important to refer to the specifications provided by the manufacturer for accurate information.

    • The elongation % indicates the ability of the steel to deform before breaking under tension.

    • Fe550 steel is commonly used in construction and reinforcement application

  • Answered by AI
  • Q5. What the mean of rolling margin of the steel
  • Ans. 

    Rolling margin of steel is the difference between the target thickness and the actual thickness after rolling.

    • Rolling margin is a measure of the accuracy of the rolling process.

    • It is calculated by subtracting the actual thickness of the steel after rolling from the target thickness.

    • A positive rolling margin means the steel is thicker than intended, while a negative rolling margin means it is thinner.

    • Rolling margin is i...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident and deeply knowledge of each material and it's properties

PVR PROJECTS Interview FAQs

How many rounds are there in PVR PROJECTS Civil Site Engineer interview?
PVR PROJECTS interview process usually has 1 rounds. The most common rounds in the PVR PROJECTS interview process are Technical.
How to prepare for PVR PROJECTS Civil Site Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at PVR PROJECTS. The most common topics and skills that interviewers at PVR PROJECTS expect are Civil Construction, Site Engineering, Billing, Civil Engineering and Civil Project Management.
What are the top questions asked in PVR PROJECTS Civil Site Engineer interview?

Some of the top questions asked at the PVR PROJECTS Civil Site Engineer interview -

  1. Calculate qty of slrb ,canal earthworks qty ...read more
  2. Calculate bed and top width of ca...read more

Tell us how to improve this page.

PVR PROJECTS Civil Site Engineer Salary
based on 10 salaries
₹1.1 L/yr - ₹3.8 L/yr
26% less than the average Civil Site Engineer Salary in India
View more details

PVR PROJECTS Civil Site Engineer Reviews and Ratings

based on 3 reviews

3.1/5

Rating in categories

3.1

Skill development

2.5

Work-life balance

3.3

Salary

2.0

Job security

3.1

Company culture

2.7

Promotions

3.1

Work satisfaction

Explore 3 Reviews and Ratings
Accountant
22 salaries
unlock blur

₹2.4 L/yr - ₹4.8 L/yr

Senior Engineer
15 salaries
unlock blur

₹4.2 L/yr - ₹7.2 L/yr

Civil Site Engineer
10 salaries
unlock blur

₹1.1 L/yr - ₹3.8 L/yr

Senior Site Engineer
7 salaries
unlock blur

₹6 L/yr - ₹6.4 L/yr

Junior Engineer Civil
7 salaries
unlock blur

₹1.5 L/yr - ₹3.5 L/yr

Explore more salaries
Compare PVR PROJECTS with

Lea Associates South Asia

4.3
Compare

McNally Bharat Engineering

4.1
Compare

R.V.R. PROJECTS

4.0
Compare

ABCI Infrastructures

3.4
Compare
Did you find this page helpful?
Yes No
write
Share an Interview