Upload Button Icon Add office photos

Filter interviews by

PVR PROJECTS Interview Questions, Process, and Tips

Updated 14 Mar 2024

Top PVR PROJECTS Interview Questions and Answers

PVR PROJECTS Interview Experiences

Popular Designations

10 interviews found

Sr.MANAGER P Interview Questions & Answers

user image Anonymous

posted on 14 Mar 2024

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Feb 2024. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Personal and professional briefings
Round 2 - One-on-one 

(1 Question)

  • Q1. Experience level questions

Store Manager Interview Questions & Answers

user image Anonymous

posted on 15 Mar 2023

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. Work experience and skills
  • Q2. Material record and skills dovlopment
  • Q3. Work experience and skills dovlopment
  • Q4. Technology and skills dovlopment

Interview Preparation Tips

Interview preparation tips for other job seekers - Good working quality work skills dovlopment technology and skills dovlopment

Store Manager Interview Questions asked at other Companies

Q1. If ebita is down, what is basic plans, stores conversion is down, IPCm, ATS, DOWN. ---MY ANSWER IS TO GET BASIC RIGHT, REST ALL THE KPI WILL BE FULL FILLED AUTOMATICALLY. Staff to staff marking is very much important and understand your tea... read more
View answer (29)
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. About store material questions
  • Q2. What is the high amount of material
  • Ans. 

    The high amount of material refers to the maximum quantity of inventory that can be stored in a particular location.

    • The high amount of material is determined by the storage capacity of the location.

    • It is important to ensure that the high amount of material is not exceeded to prevent overstocking and potential damage to the inventory.

    • Factors such as demand, lead time, and storage costs should be considered when determin...

  • Answered by AI

Senior Executive - Stores Interview Questions asked at other Companies

Q1. Procedure and methods of inventory management, Preservation of goods, materials replacement procedure, documentory of stores, materials handling systems, handling of outsourcing manpower crews..etc
View answer (1)

I applied via Naukri.com and was interviewed in May 2022. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. How many years exp in the construction field.
  • Q2. What is Gravel, Bitumin
  • Ans. 

    Gravel is a mixture of small stones and sand, while bitumin is a black viscous mixture of hydrocarbons obtained naturally or as a residue from petroleum distillation.

    • Gravel is commonly used in construction for roadways and landscaping.

    • Bitumin is used in the production of asphalt for road construction.

    • Bitumin can also be used as a waterproofing agent for roofs and foundations.

    • Gravel and bitumin are often used together i

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - The interview is very smooth, Head of the Dept and Directors are very good.

Accounts Officer Interview Questions asked at other Companies

Q1. How can you handle entire accounts section give me some examples?
View answer (9)

PVR PROJECTS interview questions for popular designations

 Accounts Officer

 (1)

 Civil Site Engineer

 (1)

 Junior Engineer Civil

 (1)

 Manager Mech

 (1)

 Purchase Manager

 (1)

 Senior Engineer Mechanical

 (1)

 Senior Executive - Stores

 (1)

 Senior Project Manager

 (1)

Round 1 - Technical 

(3 Questions)

  • Q1. Calculate qty of slrb ,canal earthworks qty etc
  • Ans. 

    The question asks to calculate the quantity of slrb and canal earthworks.

    • To calculate the quantity of slrb, you need to know the dimensions and specifications of the slrb.

    • To calculate the quantity of canal earthworks, you need to know the length, width, and depth of the canal.

    • You may also need to consider any slopes, embankments, or other factors that could affect the earthworks quantity.

  • Answered by AI
  • Q2. Previous company work
  • Ans. 

    I worked as a Civil Site Engineer at XYZ Construction Company.

    • Managed and supervised construction projects

    • Ensured compliance with building codes and regulations

    • Prepared and reviewed project plans and specifications

    • Coordinated with architects, contractors, and subcontractors

    • Performed site inspections and quality control checks

    • Resolved any issues or conflicts that arose during construction

    • Maintained project documentation

  • Answered by AI
  • Q3. Calculate bed and top width of canal
  • Ans. 

    Bed and top width of canal can be calculated using Manning's formula and cross-sectional area of the canal.

    • Calculate the cross-sectional area of the canal using Manning's formula

    • Determine the depth of water in the canal

    • Calculate the bed width by dividing the cross-sectional area by the depth of water

    • Calculate the top width by adding twice the depth of water to the bed width

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Naukri .com and reference of project manager

Civil Site Engineer Interview Questions asked at other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
View answer (64)

I applied via Walk-in and was interviewed in Dec 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Why do you change the job.?
  • Ans. Good opportunity and similarities to relevant experience
  • Answered Anonymously

Interview Preparation Tips

Interview preparation tips for other job seekers - Be cool and confident,Be careful with inspection team

Purchase Manager Interview Questions asked at other Companies

Q1. Again if you are coming with reference then high probability of getting selected irrespective of what you have done in Interview. Some basic technical questions related to Job description. Not much technical as they dont have strong technic... read more
View answer (3)

Jobs at PVR PROJECTS

View all

Manager Mech Interview Questions & Answers

user image Anonymous

posted on 27 Jun 2022

I applied via Naukri.com and was interviewed before Jun 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. How much manpower and machinery you handle
  • Q2. What is your job profile

Interview Preparation Tips

Interview preparation tips for other job seekers - Deep knowledge what you work what you do new things

Manager Mech Interview Questions asked at other Companies

Q1. What's explosive vent for air cooled transformer
View answer (1)

I applied via Approached by Company and was interviewed before Apr 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Asking Past and present Project details and Experience
Round 3 - Technical 

(1 Question)

  • Q1. Knowledge about QC and IS codes Related.

Interview Preparation Tips

Interview preparation tips for other job seekers - My advice is very is to facing interview and very is to getting job also. But not Permanent job keep it Mind. Every 3 months Change the Site.

Senior Project Manager Interview Questions asked at other Companies

Q1. DESIGIN PROCEDURE :- DLC thickness 150mm. 1:- use M15 grade concrete,max aggregate cement ratio 12:1 2:-The minimum cement content 150kg per cum. If flayash is more than >20% the mini.mum cement content. 120kg pet cum 3:- The 5 no sample... read more
View answer (3)

I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Share details of your previous job.
Round 2 - Technical 

(1 Question)

  • Q1. Civil engineer jouner engineer

Interview Preparation Tips

Interview preparation tips for other job seekers - Civil engineer jouner engineer

Junior Engineer Civil Interview Questions asked at other Companies

Q1. What is your name Where are you from Ratio of M 20 grade concrete. How to find the weight of steel bar used in reinforcement ? How to measurements the concrete volume? Standard size of brick. What is volume of cement bag 50 kg? How to calcu... read more
View answer (2)

Interview Questionnaire 

1 Question

  • Q1. Irrigation related

Senior Engineer Mechanical Interview Questions asked at other Companies

Q1. Few manufacturing process for sheet metal operations and when to use when in accordance to volume,lead time and cost balancing.
View answer (1)

PVR PROJECTS Interview FAQs

How many rounds are there in PVR PROJECTS interview?
PVR PROJECTS interview process usually has 1-2 rounds. The most common rounds in the PVR PROJECTS interview process are One-on-one Round, Resume Shortlist and Technical.
How to prepare for PVR PROJECTS interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at PVR PROJECTS. The most common topics and skills that interviewers at PVR PROJECTS expect are Civil Engineering, Irrigation, Construction, Pipeline and Purchase.
What are the top questions asked in PVR PROJECTS interview?

Some of the top questions asked at the PVR PROJECTS interview -

  1. Calculate qty of slrb ,canal earthworks qty ...read more
  2. What is the high amount of mater...read more
  3. Calculate bed and top width of ca...read more

Tell us how to improve this page.

PVR PROJECTS Interview Process

based on 6 interviews

Interview experience

4.2
  
Good
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 422 Interviews
GMR Group Interview Questions
4.1
 • 80 Interviews
GAMMON INDIA Interview Questions
3.9
 • 29 Interviews
View all

PVR PROJECTS Reviews and Ratings

based on 81 reviews

3.7/5

Rating in categories

3.4

Skill development

3.6

Work-life balance

3.8

Salary

3.1

Job security

3.5

Company culture

3.4

Promotions

3.4

Work satisfaction

Explore 81 Reviews and Ratings
Administration Manager

Mumbai,

Pune

4-9 Yrs

₹ 4-6.5 LPA

Walkin For Surveyor

Hyderabad / Secunderabad

1-6 Yrs

₹ 2-5 LPA

Walk IN For HR Admin For Construction Company

Hyderabad / Secunderabad

1-4 Yrs

₹ 2-4.5 LPA

Explore more jobs
Accountant
20 salaries
unlock blur

₹2.5 L/yr - ₹4.8 L/yr

Senior Engineer
12 salaries
unlock blur

₹4.2 L/yr - ₹7.2 L/yr

Civil Site Engineer
10 salaries
unlock blur

₹1.1 L/yr - ₹3.8 L/yr

Senior Site Engineer
7 salaries
unlock blur

₹6 L/yr - ₹6.4 L/yr

Junior Engineer Civil
7 salaries
unlock blur

₹1.5 L/yr - ₹3.5 L/yr

Explore more salaries
Compare PVR PROJECTS with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview