i
Chaitanya Projects Consultancy
Filter interviews by
I applied via Naukri.com and was interviewed in Nov 2023. There were 2 interview rounds.
Kis co. Me kya kya kaam kiya
Top trending discussions
I applied via Walk-in and was interviewed before Nov 2023. There were 2 interview rounds.
25 Civil Engineering related Questions
posted on 22 Nov 2023
I applied via Naukri.com and was interviewed before Nov 2022. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Jun 2022. There were 2 interview rounds.
To conduct a slump test, fill a metal cone with concrete, compact it, remove the cone, and measure the slump.
Clean the cone and moisten it with water.
Fill the cone with concrete in three layers, compacting each layer with a rod.
Remove the cone and place it next to the slump.
Measure the difference in height between the top of the cone and the highest point of the slump.
Repeat the test at least twice and take the average
Minimum cement content for M25 Grade is 300 kg/m³.
M25 grade concrete has a minimum compressive strength of 25 MPa.
The water-cement ratio should not exceed 0.50.
The cement content can vary based on factors such as aggregate size, shape, and grading.
The cement content should be adjusted based on the results of trial mixes.
I expect a competitive salary based on industry standards and my experience.
I have researched the industry standards for QA QC Engineer salaries
I have taken into account my experience and skills
I am open to negotiation based on the specific job responsibilities and benefits package
I am looking for a fair and competitive salary that reflects my value to the company
I applied via Approached by Company and was interviewed in Mar 2022. There were 2 interview rounds.
posted on 14 Oct 2023
I applied via Naukri.com and was interviewed in Apr 2023. There were 3 interview rounds.
Process of variation involves documenting and analyzing changes in project scope, cost, or schedule.
Variations are changes to the original scope, cost, or schedule of a project
Variations must be documented and approved by the relevant parties
The impact of variations on project budget and timeline must be analyzed
Examples of variations include design changes, unforeseen site conditions, and client requests
I applied via Naukri.com and was interviewed before Dec 2020. There were 3 interview rounds.
I applied via Company Website and was interviewed in Nov 2019. There were 3 interview rounds.
As project head, I would execute the site by overseeing the planning, budgeting, and scheduling of the project.
Develop a comprehensive project plan that includes timelines, budgets, and resources
Assign tasks and responsibilities to team members
Monitor progress and make adjustments as necessary
Ensure compliance with safety regulations and quality standards
Communicate regularly with stakeholders to keep them informed of ...
Development length is the length of reinforcement required to transfer the stress from steel to concrete.
It is the minimum length of reinforcement bar required to be embedded in concrete to develop the desired bond strength between steel and concrete.
It is dependent on the diameter of the bar, the grade of the steel, and the compressive strength of the concrete.
It is calculated using empirical formulas or tables provid...
No, as a Site Engineer, my expertise is in construction and project management, not in manufacturing ammunition.
As a Site Engineer, my focus is on managing construction projects and ensuring they are completed on time and within budget.
I do not have any experience or knowledge in the manufacturing of ammunition or BBs.
My skills and expertise lie in areas such as project planning, site management, and quality control.
I applied via Referral and was interviewed before Jun 2020. There was 1 interview round.
The outer diameter of a 12 inch line is approximately 304.8 mm.
The conversion factor from inches to millimeters is 25.4.
To convert inches to millimeters, multiply the value by 25.4.
Therefore, the outer diameter of a 12 inch line is 12 * 25.4 = 304.8 mm.
based on 4 interviews
Interview experience
based on 6 reviews
Rating in categories
Assistant Highway Engineer
37
salaries
| ₹3 L/yr - ₹6 L/yr |
Site Engineer
21
salaries
| ₹3 L/yr - ₹6 L/yr |
Project Engineer
17
salaries
| ₹2 L/yr - ₹5.2 L/yr |
Assistant Bridge Engineer
15
salaries
| ₹3.8 L/yr - ₹6 L/yr |
Business Development Executive
12
salaries
| ₹3 L/yr - ₹7 L/yr |
McNally Bharat Engineering
ABCI Infrastructures
Military Engineer Services
VIKRAN Engineering & Exim