Upload Button Icon Add office photos

Psp Projects

Compare button icon Compare button icon Compare

Filter interviews by

Psp Projects Interview Questions and Answers

Updated 19 Mar 2025

Psp Projects Interview Experiences

Popular Designations

51 interviews found

QA QC Engineer Interview Questions & Answers

user image Pedini Prafula

posted on 21 Jun 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in May 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Sop for the basic activities carried out at site
  • Ans. 

    SOP for basic activities at site includes inspection, testing, documentation, and reporting.

    • Inspection of materials and equipment

    • Testing of materials for quality control

    • Documentation of test results and findings

    • Reporting any deviations or non-conformities

    • Ensuring compliance with project specifications and standards

  • Answered by AI
  • Q2. QAP regarding questions
Round 2 - HR 

(2 Questions)

  • Q1. How about my previous work experience
  • Q2. Why I am interested in this firm

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep a good knowledge of technical side

QA QC Engineer Interview Questions asked at other Companies

Q1. wha is your response ?, if material will purchase from any factory then what will u do that ? , how many hours can u do work in a day?, do u know all plant calibration?, how the borrow area will select ?, how u manage your junior in work pe... read more
View answer (4)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. Finishing work details
  • Q2. Tiles work, plaster work,MEP WORK
  • Q3. Falscilingwork,paint work
  • Q4. Layout works,coloumn,slab,beam, footing
  • Q5. RCC work, structural drawing knowledge

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical skill, finishing work details

Assistant Engineer - Civil Interview Questions asked at other Companies

Q1. If the cubes are failed then what will you do ?
View answer (7)
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(4 Questions)

  • Q1. What is the Steel margin
  • Ans. 

    Steel margin refers to the difference between the cost of producing steel and the selling price.

    • Steel margin is calculated by subtracting the cost of production (including raw materials, labor, and overhead) from the selling price of steel products.

    • It is important for companies to maintain a healthy steel margin to ensure profitability and sustainability.

    • Factors that can impact the steel margin include fluctuations in ...

  • Answered by AI
  • Q2. What is the persentage of Aggregate in Gradiation test
  • Ans. 

    The percentage of aggregate in gradation test varies depending on the specific requirements of the project.

    • The percentage of aggregate in gradation test is typically determined by the specifications provided for the project

    • It can range from 0% to 100% depending on the type of aggregate being used and the desired characteristics of the final mix

    • For example, in a concrete mix design, the percentage of coarse aggregate ma...

  • Answered by AI
  • Q3. Project manager role at site
  • Ans. 

    The project manager plays a crucial role in overseeing and coordinating all aspects of a project at the site.

    • Responsible for planning, organizing, and directing project activities

    • Ensuring project goals are met within budget and timeline

    • Managing resources and stakeholders effectively

    • Problem-solving and decision-making skills are essential

    • Strong communication and leadership skills are necessary

  • Answered by AI
  • Q4. What is the overall cost in project in role of RCC
  • Ans. 

    The overall cost in a project in the role of RCC refers to the total expenses incurred for the Reinforced Cement Concrete work.

    • Calculate the cost of materials such as cement, aggregates, and reinforcement bars.

    • Consider the cost of labor for construction and installation of RCC components.

    • Include any additional costs such as equipment rental, transportation, and overhead expenses.

    • Factor in the cost of quality control me...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Mot Satisfaction job

Assistant Project Manager Interview Questions asked at other Companies

Q1. What are the different phases in new product development?
View answer (1)
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I appeared for an interview in Feb 2025.

Round 1 - HR 

(2 Questions)

  • Q1. What is safety and Hazard
  • Ans. 

    Safety refers to the condition of being protected from harm, while a hazard is a potential source of danger.

    • Safety involves practices and measures to prevent accidents and injuries.

    • Hazards can be physical (like machinery), chemical (like toxic substances), or biological (like viruses).

    • For example, a wet floor is a physical hazard that can lead to slips and falls.

    • In the workplace, safety protocols like wearing PPE (Pers...

  • Answered by AI
  • Q2. What is confined space
  • Ans. 

    A confined space is an area not designed for continuous occupancy, with limited entry and exit, and potential hazards.

    • Defined by OSHA as a space with limited openings for entry and exit.

    • Examples include tanks, silos, and underground vaults.

    • May contain hazardous atmospheres, such as toxic gases or low oxygen levels.

    • Requires specific safety protocols for entry, including monitoring and ventilation.

  • Answered by AI
Round 2 - HR 

(3 Questions)

  • Q1. What is unsafe act and conditions
  • Ans. 

    Unsafe acts are behaviors that can lead to accidents, while unsafe conditions are environmental factors that increase risk.

    • Unsafe acts include ignoring safety protocols, such as not wearing personal protective equipment (PPE).

    • Examples of unsafe conditions are wet floors that can cause slips or poorly maintained equipment that may fail.

    • Unsafe acts can also involve rushing through tasks, leading to mistakes and accidents...

  • Answered by AI
  • Q2. TBT full form and what is TBT
  • Ans. 

    TBT stands for Toolbox Talk, a safety meeting focused on specific topics to enhance workplace safety awareness.

    • TBTs are brief, informal safety meetings held on-site.

    • They focus on specific safety issues relevant to the work being done.

    • Example: A TBT might cover proper lifting techniques to prevent injuries.

    • TBTs encourage worker participation and sharing of experiences.

    • They are often conducted before starting a job or ta

  • Answered by AI
  • Q3. What is your qualification

Safety Officer Interview Questions asked at other Companies

Q1. If you don't have any safety equipment and documents how to complete the work ?
View answer (18)

Psp Projects interview questions for popular designations

 Senior Engineer

 (5)

 Senior Billing Engineer

 (4)

 Assistant Engineer

 (3)

 Assistant Project Manager

 (2)

 Billing Engineer

 (2)

 Deputy Manager

 (2)

 Project Manager

 (1)

 HR Executive

 (1)

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Mar 2024, where I was asked the following questions.

  • Q1. Roles and responsibilities
  • Q2. Do and Don't
  • Q3. Preparation of QAP and MSW
  • Ans. 

    Quality Assurance Plan (QAP) and Master Software Work (MSW) are essential for ensuring product quality and compliance.

    • QAP outlines the quality objectives, processes, and responsibilities for a project.

    • MSW details the software development lifecycle, including phases like requirements, design, implementation, and testing.

    • Example of QAP: A plan for a new medical device that includes risk management and validation protocol...

  • Answered by AI

Quality Engineer Interview Questions asked at other Companies

Q1. What is MSA and addition of msa version, type of msa ,what different between variable data and attibute data .why difine flase and miss rate calculate by msa .
View answer (9)
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Oct 2024. There was 1 interview round.

Round 1 - Aptitude Test 

RMC PLANT DISHPECHAR

Interview Preparation Tips

Interview preparation tips for other job seekers - Data Entry
DISHPECHAR

Office Assistant Interview Questions asked at other Companies

Q1. Market share of motorcycle in North Zone viz Delhi, Haryana, Rajasthan, Punjab, Chandigarh, Jammu and Kashmir
View answer (5)

Jobs at Psp Projects

View all
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Sep 2024, where I was asked the following questions.

  • Q1. What a IS Code of Design Mix ?
  • Ans. 

    IS Code of Design Mix refers to Indian Standards for concrete mix design, ensuring quality and performance in construction.

    • IS 456:2000 provides guidelines for plain and reinforced concrete design.

    • IS 10262:2019 outlines the procedure for concrete mix design.

    • Mix design considers factors like workability, strength, and durability.

    • Example: A mix design for M25 concrete specifies a ratio of 1:1:2 (Cement:Sand:Aggregate).

    • The...

  • Answered by AI
  • Q2. What are the Welding method of steel?
  • Ans. 

    Welding methods for steel include various techniques like MIG, TIG, and Stick welding, each suited for different applications.

    • MIG Welding (Gas Metal Arc Welding) - Uses a continuous wire feed and is ideal for thin to medium thickness steel.

    • TIG Welding (Gas Tungsten Arc Welding) - Provides high precision and is suitable for thin materials and stainless steel.

    • Stick Welding (Shielded Metal Arc Welding) - Versatile and com...

  • Answered by AI
  • Q3. What are the advantage of steel shuttering?
  • Ans. 

    Steel shuttering offers durability, reusability, and precision in construction, enhancing project efficiency and quality.

    • Durability: Steel shuttering can withstand harsh weather conditions and heavy loads, making it suitable for large-scale projects.

    • Reusability: Unlike timber, steel can be reused multiple times, reducing material costs over time.

    • Precision: Steel shuttering provides a high level of accuracy in dimension...

  • Answered by AI
  • Q4. What are the benefits of using Composite Plate?
  • Ans. 

    Composite plates offer enhanced strength, lightweight properties, and design flexibility for various applications.

    • High strength-to-weight ratio: Composite plates are significantly lighter than metals, making them ideal for aerospace applications.

    • Corrosion resistance: They resist environmental degradation, suitable for marine and chemical industries.

    • Design flexibility: Can be molded into complex shapes, allowing for inn...

  • Answered by AI
  • Q5. How do you lay blocks in block work
  • Ans. 

    Laying blocks involves precise techniques for alignment, mortar application, and ensuring structural integrity.

    • Prepare the foundation: Ensure the base is level and clean before starting.

    • Mix mortar: Use the right ratio of cement, sand, and water for optimal adhesion.

    • Lay the first block: Start at a corner, applying mortar to the bottom and sides.

    • Check alignment: Use a level to ensure blocks are straight and even.

    • Stagger ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - As a job seeker, it's essential to be proactive and persistent in your job search. Don't quit for opportunities to come to you. Create your own. 1- Network and make Connection. 2- Tailor your application materials. 3- Follow up 4- Continuous improve. 5- Stay positive and motivate.

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (60)
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Jan 2024.

Round 1 - Technical 

(3 Questions)

  • Q1. Drawing and structure making plan
  • Q2. Resource for utilities manpower and services as a company costly
  • Ans. 

    Resource allocation for utilities manpower and services can be costly but is essential for ensuring safety and compliance.

    • Allocate resources based on risk assessment and regulatory requirements

    • Consider outsourcing certain services to reduce costs

    • Implement energy efficiency measures to reduce utility expenses

    • Invest in training and development of in-house manpower to improve efficiency

    • Regularly review and optimize resour

  • Answered by AI
  • Q3. Define the multiple work program in your work place.
  • Ans. 

    The multiple work program in my workplace involves managing and coordinating various projects and tasks simultaneously to ensure efficiency and productivity.

    • Assigning priorities to different projects based on deadlines and importance

    • Utilizing project management tools to track progress and allocate resources

    • Communicating effectively with team members to ensure alignment and collaboration

    • Adapting to changing priorities a...

  • Answered by AI
Round 2 - Assignment 

Anyone type of farmwork, structure, designer, progress and process, professional work, achivement goal, safe end of the project

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical knowledge, graphical knowledge, basic knowledge and share your self knowledge as your experience, handling manpower, truthful and honest your job postion during your service.

Senior EHS Officer Interview Questions asked at other Companies

Q1. What would you do, If client will not give permission during a heavy lifting material by crane. But Permit was signed by client. Drying the work client will stop the work. Then what you will do in that case?
View answer (1)
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(6 Questions)

  • Q1. Labour law act and Handling
  • Q2. Mess Handle and hygiene
  • Q3. ABCD register maintain
  • Q4. Attendance via biomatrics machine
  • Q5. SAP Hana version use etc
  • Ans. 

    SAP Hana is an in-memory database management system used for real-time data processing and analytics.

    • SAP Hana is a high-performance database platform developed by SAP.

    • It allows businesses to process large volumes of data in real-time.

    • SAP Hana uses in-memory computing, which means data is stored in RAM for faster access.

    • It supports advanced analytics, machine learning, and predictive modeling.

    • SAP Hana versions include S...

  • Answered by AI
  • Q6. Attendance and mess posting in SAP

Skills evaluated in this interview

HR and Administration Team Member Interview Questions asked at other Companies

Q1. How u can handle pressure in highly fluctuating market....
View answer (1)

Welder Interview Questions & Answers

user image Anonymous

posted on 10 Sep 2024

Interview experience
1
Bad
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - HR 

(2 Questions)

  • Q1. Good hr but superviser bad
  • Q2. Good hr but superviser bad ji

Interview Preparation Tips

Interview preparation tips for other job seekers - It would be better if no one comes here because here welders are harassed a lot and here the full craftsman also gets the same salary and the helper also gets the same salary and on Sunday the salary is deducted; the salary that the contractor pays to the welder is Rs. 650 for 12 hours and the idiot supervisor named Suresh uses very foul language, this idiot is such that if any person runs away from here then it is because of this, so if anyone comes then they should not work with Suresh.

Welder Interview Questions asked at other Companies

Q1. What is welding position 6G Ans welding position of 6G 45dgree
View answer (3)

Senior Engineer Interview Questions & Answers

user image dilipkumar sharma

posted on 6 Oct 2024

Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Field related building materials
  • Q2. Building materials

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't join in this company,

Senior Engineer Interview Questions asked at other Companies

Q1. what is the meaning of M in M20,M25,M30 grade of concrete?
View answer (60)

Psp Projects Interview FAQs

How many rounds are there in Psp Projects interview?
Psp Projects interview process usually has 2-3 rounds. The most common rounds in the Psp Projects interview process are Technical, Resume Shortlist and HR.
How to prepare for Psp Projects interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Psp Projects. The most common topics and skills that interviewers at Psp Projects expect are Scheduling, Building Construction, Cost Estimation, MSP and Planning.
What are the top questions asked in Psp Projects interview?

Some of the top questions asked at the Psp Projects interview -

  1. Tell me About EPC pattern billing, item wise Billing e...read more
  2. What's the is code for Billing, What's the extra items, what's the deduction ru...read more
  3. Tell me about finishing items bill...read more
How long is the Psp Projects interview process?

The duration of Psp Projects interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

Psp Projects Interview Process

based on 87 interviews

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 116 Interviews
Apco Infratech Interview Questions
3.7
 • 114 Interviews
Bechtel Interview Questions
3.9
 • 68 Interviews
Samsung E&A Interview Questions
4.0
 • 60 Interviews
Wood Group Interview Questions
3.8
 • 59 Interviews
View all

Psp Projects Reviews and Ratings

based on 643 reviews

3.9/5

Rating in categories

3.7

Skill development

3.5

Work-life balance

3.6

Salary

3.6

Job security

3.5

Company culture

3.3

Promotions

3.6

Work satisfaction

Explore 643 Reviews and Ratings
Planning Engineer

Ahmedabad

2-7 Yrs

₹ 3-8 LPA

Executive - Accounts

Ahmedabad

2-5 Yrs

₹ 2.33724-3.96 LPA

Explore more jobs
Assistant Engineer
148 salaries
unlock blur

₹3 L/yr - ₹6 L/yr

Senior Engineer
137 salaries
unlock blur

₹3 L/yr - ₹10 L/yr

Junior Engineer
81 salaries
unlock blur

₹1 L/yr - ₹4.5 L/yr

Assistant Engineer - Civil
50 salaries
unlock blur

₹2.6 L/yr - ₹5.6 L/yr

Senior Civil Engineer
50 salaries
unlock blur

₹4 L/yr - ₹8.5 L/yr

Explore more salaries
Compare Psp Projects with

AECOM

4.2
Compare

L&T Energy Hydrocarbon

3.9
Compare

Apco Infratech

3.7
Compare

Saipem

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview