IS CODE ensures standardization, safety, and quality in erection and fabrication processes across various engineering sectors.
Standardization: IS CODE provides uniform guidelines for materials and processes, ensuring consistency in quality.
Safety: Compliance with IS CODE helps in minimizing risks associated with structural failures during erection.
Quality Assurance: Adhering to IS CODE ensures that the fabricated ...
A comprehensive checklist ensures quality and efficiency in constructing Pre-Engineered Buildings (PEBs).
Site Assessment: Evaluate soil conditions and topography to determine foundation requirements.
Design Review: Ensure all architectural and structural designs meet local codes and client specifications.
Material Selection: Choose appropriate materials (e.g., steel grades) based on load requirements and environment...
Unit weight of circular bar can be calculated using a specific formula.
The formula to find the unit weight of a circular bar is: Unit weight = (π * D^2 * L * ρ) / 4
Where D is the diameter of the circular bar, L is the length of the bar, and ρ is the density of the material.
Make sure to use consistent units for diameter, length, and density in the formula.
For example, if the diameter of the circular bar is 10 mm, t...
Calculate the bbs of a 4x3m footing with d=300mm and 12mm dia steel.
Calculate the total length of steel required
Determine the spacing between the bars
Prepare a detailed bar bending schedule
Plywood, steel, aluminum, and plastic are commonly used materials for shuttering.
Plywood is the most commonly used material for shuttering due to its durability and affordability.
Steel is used for heavy-duty construction projects as it can withstand high pressure and weight.
Aluminum is lightweight and easy to handle, making it ideal for small-scale projects.
Plastic is a cost-effective option for simple constructio...
To calculate the quantity of concrete for trapezoidal footing, we need to use the formula for volume of a trapezoidal prism.
Measure the length, width, and height of the trapezoidal footing
Calculate the area of the trapezoidal base using the formula (a+b)/2 * h
Calculate the volume of the trapezoidal prism using the formula area of base * height
Multiply the volume by the number of trapezoidal footings needed
Add an a...
Salary is the amount of money paid to an employee for their work.
Salary is usually paid on a monthly or bi-weekly basis.
It can be negotiated during the hiring process or during performance reviews.
The amount of salary depends on factors such as experience, education, and job responsibilities.
In some cases, bonuses or incentives may be included in the salary package.
Salary is subject to taxes and other deductions s...
Diaphragm walls are used to create a barrier while retaining walls are used to hold back soil.
Diaphragm walls are underground walls that are used to create a barrier to prevent water from entering a construction site.
Retaining walls are used to hold back soil and prevent it from sliding or eroding.
Diaphragm walls are typically made of reinforced concrete and are used in deep excavations.
Retaining walls can be made...
I appeared for an interview before Jul 2024, where I was asked the following questions.
Experienced Senior Engineer with a proven track record in innovative solutions and team leadership, ready to drive success in your organization.
Over 10 years of experience in software development, leading projects from conception to deployment.
Successfully managed a team of 5 engineers, improving project delivery time by 30% through agile methodologies.
Developed a scalable application that increased user engagement by ...
IS CODE ensures standardization, safety, and quality in erection and fabrication processes across various engineering sectors.
Standardization: IS CODE provides uniform guidelines for materials and processes, ensuring consistency in quality.
Safety: Compliance with IS CODE helps in minimizing risks associated with structural failures during erection.
Quality Assurance: Adhering to IS CODE ensures that the fabricated compo...
A comprehensive checklist ensures quality and efficiency in constructing Pre-Engineered Buildings (PEBs).
Site Assessment: Evaluate soil conditions and topography to determine foundation requirements.
Design Review: Ensure all architectural and structural designs meet local codes and client specifications.
Material Selection: Choose appropriate materials (e.g., steel grades) based on load requirements and environmental fa...
I applied via Referral and was interviewed in Mar 2024. There was 1 interview round.
I appeared for an interview in Mar 2024.
Unit weight of circular bar can be calculated using a specific formula.
The formula to find the unit weight of a circular bar is: Unit weight = (π * D^2 * L * ρ) / 4
Where D is the diameter of the circular bar, L is the length of the bar, and ρ is the density of the material.
Make sure to use consistent units for diameter, length, and density in the formula.
For example, if the diameter of the circular bar is 10 mm, the le...
I applied via Walk-in and was interviewed in Sep 2022. There were 2 interview rounds.
Diaphragm walls are used to create a barrier while retaining walls are used to hold back soil.
Diaphragm walls are underground walls that are used to create a barrier to prevent water from entering a construction site.
Retaining walls are used to hold back soil and prevent it from sliding or eroding.
Diaphragm walls are typically made of reinforced concrete and are used in deep excavations.
Retaining walls can be made of v...
Plywood, steel, aluminum, and plastic are commonly used materials for shuttering.
Plywood is the most commonly used material for shuttering due to its durability and affordability.
Steel is used for heavy-duty construction projects as it can withstand high pressure and weight.
Aluminum is lightweight and easy to handle, making it ideal for small-scale projects.
Plastic is a cost-effective option for simple construction pro...
Calculate the bbs of a 4x3m footing with d=300mm and 12mm dia steel.
Calculate the total length of steel required
Determine the spacing between the bars
Prepare a detailed bar bending schedule
To calculate the quantity of concrete for trapezoidal footing, we need to use the formula for volume of a trapezoidal prism.
Measure the length, width, and height of the trapezoidal footing
Calculate the area of the trapezoidal base using the formula (a+b)/2 * h
Calculate the volume of the trapezoidal prism using the formula area of base * height
Multiply the volume by the number of trapezoidal footings needed
Add an additi...
I applied via Walk-in and was interviewed before Feb 2023. There were 2 interview rounds.
Yes, I can make bbs.
I have experience in creating project schedules and budgets.
I am skilled in coordinating with team members and stakeholders.
I can effectively manage resources to ensure project success.
Working on a high-profile construction project with tight deadlines and complex requirements.
Coordinating with multiple stakeholders to ensure project milestones were met
Managing a team of subcontractors and ensuring quality control
Problem-solving on the fly to address unexpected challenges
Presenting project updates to senior management and clients
Salary is the amount of money paid to an employee for their work.
Salary is usually paid on a monthly or bi-weekly basis.
It can be negotiated during the hiring process or during performance reviews.
The amount of salary depends on factors such as experience, education, and job responsibilities.
In some cases, bonuses or incentives may be included in the salary package.
Salary is subject to taxes and other deductions such a...
Top trending discussions
posted on 11 Apr 2021
I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.
A man day is a unit of measure representing the amount of work one person can complete in a single day.
Typically used in project management to estimate labor costs and timelines.
One man day usually equals 8 hours of work.
For example, if a task requires 40 man days, it would take one person 40 days or 5 people 8 days to complete.
Helps in resource allocation and planning for projects.
Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.
Identifying the required personnel for a project
Recruiting and hiring personnel
Training and orienting personnel to the project
Assigning roles and responsibilities to personnel
Managing personnel performance and productivity
Ensuring compliance with labor laws and regulations
Examples include mobilizing a construc...
Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.
Create a detailed project budget and stick to it
Track expenses regularly and adjust budget as needed
Identify and eliminate unnecessary expenses
Negotiate with vendors for better pricing
Implement cost-saving measures without compromising quality
Use project management tools to monitor expenses and progress
Reg...
Handling clients requires effective communication, understanding their needs, and providing timely solutions.
Listen actively to their concerns and requirements
Communicate clearly and professionally
Provide timely updates and solutions
Build a strong relationship based on trust and respect
Be proactive in identifying and addressing potential issues
Ensure customer satisfaction by going above and beyond expectations
Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.
Identify the need for manpower
Plan the recruitment process
Source and screen candidates
Conduct interviews and assessments
Select and hire candidates
Provide training and orientation
Deploy manpower to required locations
I applied via Job Portal and was interviewed before Dec 2021. There were 3 interview rounds.
Some of the top questions asked at the Psp Projects interview for freshers -
The duration of Psp Projects interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 6 interview experiences
Difficulty level
Duration
based on 744 reviews
Rating in categories
Senior Engineer
184
salaries
| ₹4.8 L/yr - ₹9.6 L/yr |
Assistant Engineer
176
salaries
| ₹3 L/yr - ₹6.6 L/yr |
Junior Engineer
88
salaries
| ₹1.5 L/yr - ₹4.5 L/yr |
Senior Civil Engineer
59
salaries
| ₹4.6 L/yr - ₹9 L/yr |
Store Executive
54
salaries
| ₹2.4 L/yr - ₹4.5 L/yr |
L&T Energy Hydrocarbon
AECOM
Sterling & Wilson
Apco Infratech