Upload Button Icon Add office photos

Filter interviews by

PPN Power Generating Company Software Developer Interview Questions and Answers

Updated 10 May 2024

PPN Power Generating Company Software Developer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Nov 2023. There were 2 interview rounds.

Round 1 - Aptitude Test 

Easy apptitude for fresher and experienced.

Round 2 - Coding Test 

Pattern print of stars is needed

Interview Preparation Tips

Interview preparation tips for other job seekers - easy job to grab in this time.

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed before Jun 2023. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. What is your job role
  • Q2. Are you seeking for a new job role if yes why
Round 2 - Technical 

(3 Questions)

  • Q1. What is a critical path
  • Ans. 

    The critical path is the longest sequence of tasks in a project that must be completed on time in order for the project to finish on schedule.

    • Identifying the critical path helps in determining the minimum time needed to complete a project.

    • It consists of tasks that have zero slack or float, meaning any delay in these tasks will delay the entire project.

    • Activities on the critical path are often marked with a double line ...

  • Answered by AI
  • Q2. How will you plan a 50 Mwp project
  • Ans. 

    I will plan a 50 Mwp project by conducting feasibility studies, creating a detailed project timeline, securing necessary permits, sourcing materials and contractors, and implementing a quality control plan.

    • Conduct feasibility studies to assess site suitability and potential challenges

    • Create a detailed project timeline outlining key milestones and deadlines

    • Secure necessary permits and approvals from local authorities

    • Sou...

  • Answered by AI
  • Q3. What is the difference between msp and primavera
  • Ans. 

    MSP (Microsoft Project) is a project management software developed by Microsoft, while Primavera is a project management software developed by Oracle.

    • MSP is developed by Microsoft, while Primavera is developed by Oracle.

    • MSP is more commonly used for smaller projects, while Primavera is preferred for larger and more complex projects.

    • MSP is known for its user-friendly interface and ease of use, while Primavera is known f...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Feb 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Grp protection, motor, transformer protection and maintenance.
Round 3 - HR 

(1 Question)

  • Q1. Question about previous employers,documents submissions
Round 4 - HR 

(1 Question)

  • Q1. Negotiations for offered packages and designation

Interview Preparation Tips

Interview preparation tips for other job seekers - Asking about ctc breakup and accommodation also they give you option for site visit for immediate joiner.
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Not Selected

I applied via LinkedIn and was interviewed in Jul 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Tell more about yourself
  • Q2. What do you learn about your role

Interview Preparation Tips

Interview preparation tips for other job seekers - ALL GOOD
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Strss vs strain curve of mild steel
  • Ans. 

    Stress vs strain curve of mild steel shows linear elastic region, yield point, ultimate tensile strength, and fracture point.

    • Mild steel exhibits linear elastic behavior up to the yield point.

    • After the yield point, plastic deformation occurs until the ultimate tensile strength is reached.

    • Fracture of mild steel typically occurs after the ultimate tensile strength.

    • The curve shows the relationship between stress (force app...

  • Answered by AI
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

What is more important product quality and marketing

Round 2 - Technical 

(1 Question)

  • Q1. Tell me about self
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Boiler MFT, furnace purge Permissive, APH pa, sa and flue gas ratio, boiler losses etc.
  • Q2. Working drum elements system
  • Ans. 

    A working drum elements system is a mechanism that allows for the efficient and effective movement of drums.

    • The system should be designed to handle drums of various sizes and weights

    • It should include components such as rollers, conveyors, and lifters

    • The system should be automated to reduce manual labor and increase productivity

    • Regular maintenance and inspections are necessary to ensure the system is functioning properl

  • Answered by AI

Interview Questionnaire 

1 Question

  • Q1. As I joined as efficiency engineer ,I asked most of the question related to thermal power plant performance.

I applied via Referral and was interviewed in Jan 2022. There were 4 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Expected CTC,Based on Experience
  • Ans. 

    Expected CTC should be based on the candidate's experience, skills, and the industry standards.

    • Consider the candidate's years of experience in the field

    • Take into account the candidate's technical skills and expertise

    • Research industry standards for Senior Engineer salaries

    • Discuss with the candidate their salary expectations and negotiate if needed

  • Answered by AI
Round 2 - Technical 

(1 Question)

  • Q1. Technical Round
Round 3 - Technical 

(1 Question)

  • Q1. Technical Round
Round 4 - HR 

(1 Question)

  • Q1. CTC discussions and others
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(5 Questions)

  • Q1. About work experience and education details.
  • Q2. Preparedness for joining.
  • Q3. Sallary details.
  • Q4. Your expectations
  • Q5. Reason for joining

Interview Preparation Tips

Interview preparation tips for other job seekers - Join this company only if you are ready to learn new things and ready to take responsibility.

PPN Power Generating Company Interview FAQs

How many rounds are there in PPN Power Generating Company Software Developer interview?
PPN Power Generating Company interview process usually has 2 rounds. The most common rounds in the PPN Power Generating Company interview process are Aptitude Test and Coding Test.

Tell us how to improve this page.

PPN Power Generating Company Software Developer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more
Senior Engineer
7 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy Manager
6 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Operations Engineer
6 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Manager
5 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
5 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare PPN Power Generating Company with

Dhoot Transmission

3.7
Compare

R.K.M Powergen

4.0
Compare

SHV Energy

3.8
Compare

New Allenberry Works

3.4
Compare
Did you find this page helpful?
Yes No
write
Share an Interview