i
India Power Corporation
Filter interviews by
I applied via Approached by Company and was interviewed in Apr 2024. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Aug 2023. There were 3 interview rounds.
Meter testing as per IS standard involves verifying the accuracy and functionality of meters used for measuring electricity, water, gas, etc.
Meter testing should be conducted in accordance with the relevant IS standard (e.g. IS 13779 for electricity meters).
Testing involves checking the accuracy of the meter readings under various load conditions.
Calibration of the meter should be done periodically to ensure accurate m...
Distance relay configuration involves setting the relay to operate based on the distance of a fault from the relay location.
Distance relay settings include reach, time delay, and pickup values.
Testing involves injecting a fault at a known distance and verifying the relay operates within the set parameters.
Secondary injection testing can be used to simulate fault conditions for testing purposes.
India Power Corporation interview questions for popular designations
I applied via Naukri.com and was interviewed in Aug 2023. There were 3 interview rounds.
Transformer faults can be classified into different types based on the nature of the fault.
Types of transformer faults include short circuit faults, open circuit faults, winding faults, and core faults.
Short circuit faults occur when two or more points in the winding come into contact, causing excessive current flow.
Open circuit faults occur when there is a break in the winding, leading to a loss of continuity and curr...
I applied via Naukri.com and was interviewed before Feb 2023. There were 4 interview rounds.
Past case study and how you slove it
GST has significant implications on the energy sector in India.
GST has replaced multiple indirect taxes like excise duty, service tax, and VAT, resulting in a unified tax system.
The energy sector is impacted by GST as it affects the cost of production and supply of energy products.
GST rates for coal, lignite, and renewable energy equipment have been reduced to 5%, while other energy products are taxed at 18%.
GST has al...
I applied via Recruitment Consulltant and was interviewed in Apr 2022. There were 2 interview rounds.
Confidence level
I was interviewed before Jul 2022.
Top trending discussions
Interview experience
based on 140 reviews
Rating in categories
Assistant Manager
59
salaries
| ₹4.5 L/yr - ₹10 L/yr |
Deputy Manager
37
salaries
| ₹5 L/yr - ₹13.5 L/yr |
Executive
29
salaries
| ₹3.3 L/yr - ₹7.2 L/yr |
Executive Engineer
19
salaries
| ₹3.2 L/yr - ₹7.2 L/yr |
Assistant General Manager
12
salaries
| ₹18 L/yr - ₹27 L/yr |
NTPC
Tata Power
Adani Power
Reliance Power