Upload Button Icon Add office photos

Filter interviews by

Jindal India Thermal Power Assistant Manager Interview Questions and Answers

Updated 2 Feb 2024

Jindal India Thermal Power Assistant Manager Interview Experiences

3 interviews found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Aug 2023. There were 3 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Ask basic questions about your work profile.
Round 2 - Technical 

(1 Question)

  • Q1. Ask basic questions about your work profile.
Round 3 - HR 

(1 Question)

  • Q1. Salary discussion and working profile details.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Oct 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About Boiler DCS operation
Round 3 - HR 

(1 Question)

  • Q1. Family background and salary discussion

Assistant Manager Interview Questions Asked at Other Companies

asked in Axis Bank
Q1. You are Handling cash operations then how you manage operations w ... read more
asked in JSW Steel
Q2. 1. Whats is Cooling tower performance aspects, Vacuume breaker us ... read more
asked in Jio
Q3. What are the different layers of OSI model?
asked in Axis Bank
Q4. How many joint holders we can process in an account in once ?
asked in Adani Group
Q5. What IS Codes do you follow for structural steel fabrication and ... read more
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(5 Questions)

  • Q1. About work experience and education details.
  • Q2. Preparedness for joining.
  • Q3. Sallary details.
  • Q4. Your expectations
  • Q5. Reason for joining

Interview Preparation Tips

Interview preparation tips for other job seekers - Join this company only if you are ready to learn new things and ready to take responsibility.

Interview questions from similar companies

I applied via Recruitment Consulltant and was interviewed before Aug 2021. There was 1 interview round.

Round 1 - Behavioral 

(2 Questions)

  • Q1. What are your 3 strengths and weaknesses
  • Q2. Why Enercon and why are you leaving your current company

Interview Preparation Tips

Interview preparation tips for other job seekers - Show your genuine interest to work here. Show the long term commitment plans
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Jun 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Technical understanding
Round 3 - HR 

(1 Question)

  • Q1. Remuneration package
Round 4 - Behavioral 

(1 Question)

  • Q1. Attitude, personal behavior
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed before Jun 2023. There were 2 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. What is your job role
  • Q2. Are you seeking for a new job role if yes why
Round 2 - Technical 

(3 Questions)

  • Q1. What is a critical path
  • Ans. 

    The critical path is the longest sequence of tasks in a project that must be completed on time in order for the project to finish on schedule.

    • Identifying the critical path helps in determining the minimum time needed to complete a project.

    • It consists of tasks that have zero slack or float, meaning any delay in these tasks will delay the entire project.

    • Activities on the critical path are often marked with a double line ...

  • Answered by AI
  • Q2. How will you plan a 50 Mwp project
  • Ans. 

    I will plan a 50 Mwp project by conducting feasibility studies, creating a detailed project timeline, securing necessary permits, sourcing materials and contractors, and implementing a quality control plan.

    • Conduct feasibility studies to assess site suitability and potential challenges

    • Create a detailed project timeline outlining key milestones and deadlines

    • Secure necessary permits and approvals from local authorities

    • Sou...

  • Answered by AI
  • Q3. What is the difference between msp and primavera
  • Ans. 

    MSP (Microsoft Project) is a project management software developed by Microsoft, while Primavera is a project management software developed by Oracle.

    • MSP is developed by Microsoft, while Primavera is developed by Oracle.

    • MSP is more commonly used for smaller projects, while Primavera is preferred for larger and more complex projects.

    • MSP is known for its user-friendly interface and ease of use, while Primavera is known f...

  • Answered by AI

I applied via Campus Placement and was interviewed before Sep 2021. There were 2 interview rounds.

Round 1 - One-on-one 

(1 Question)

  • Q1. Why this company? Why is this role? What values you bring in this role? Tell me about your self? Where do you want to see your self after 5 years.
Round 2 - One-on-one 

(1 Question)

  • Q1. Na

Interview Preparation Tips

Interview preparation tips for other job seekers - Go though the website
Check there clients and awards
How they generating revenue flows.

I applied via Company Website and was interviewed in Jul 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. They asked questions related to direct tax, indirect tax and Ind AS 115 & 116 recent amendments...

Interview Preparation Tips

Interview preparation tips for other job seekers - Overall interview experience was good and articleship experience related questions

I applied via Walk-in and was interviewed before Dec 2020. There was 1 interview round.

Interview Questionnaire 

4 Questions

  • Q1. Introduce yourself
  • Q2. Why do you want to join the company
  • Q3. How much salary have you expected
  • Q4. Why should we Hire you

Interview Preparation Tips

Interview preparation tips for other job seekers - While giving interview don't hesitate to answer.Be true..Don't try to deceive them. Be confident. Be analytical about yourself.

I applied via Campus Placement and was interviewed before Dec 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. How you are suitable to job

Interview Preparation Tips

Interview preparation tips for other job seekers - Be polite & confident. Explain the things carefully in crispy manner.

Jindal India Thermal Power Interview FAQs

How many rounds are there in Jindal India Thermal Power Assistant Manager interview?
Jindal India Thermal Power interview process usually has 2-3 rounds. The most common rounds in the Jindal India Thermal Power interview process are HR, Technical and Resume Shortlist.
What are the top questions asked in Jindal India Thermal Power Assistant Manager interview?

Some of the top questions asked at the Jindal India Thermal Power Assistant Manager interview -

  1. About Boiler DCS operat...read more
  2. Sallary detai...read more

Tell us how to improve this page.

Jindal India Thermal Power Assistant Manager Interview Process

based on 6 interviews

Interview experience

4.2
  
Good
View more

Interview Questions from Similar Companies

R.K.M Powergen Interview Questions
4.0
 • 19 Interviews
SHV Energy Interview Questions
3.8
 • 14 Interviews
Enercon Interview Questions
3.9
 • 9 Interviews
View all
Jindal India Thermal Power Assistant Manager Salary
based on 106 salaries
₹4.2 L/yr - ₹11.5 L/yr
At par with the average Assistant Manager Salary in India
View more details

Jindal India Thermal Power Assistant Manager Reviews and Ratings

based on 22 reviews

3.4/5

Rating in categories

2.7

Skill development

3.9

Work-life balance

3.7

Salary

3.7

Job security

2.9

Company culture

3.1

Promotions

3.5

Work satisfaction

Explore 22 Reviews and Ratings
Assistant Manager
106 salaries
unlock blur

₹4.2 L/yr - ₹11.5 L/yr

Senior Engineer
53 salaries
unlock blur

₹4 L/yr - ₹8.1 L/yr

Deputy Manager
43 salaries
unlock blur

₹8 L/yr - ₹13.5 L/yr

Manager
38 salaries
unlock blur

₹7.8 L/yr - ₹21 L/yr

Weigh Bridge Operator
25 salaries
unlock blur

₹1.3 L/yr - ₹3.5 L/yr

Explore more salaries
Compare Jindal India Thermal Power with

Dhoot Transmission

3.7
Compare

R.K.M Powergen

4.0
Compare

SHV Energy

3.8
Compare

New Allenberry Works

3.4
Compare
Did you find this page helpful?
Yes No
write
Share an Interview