Filter interviews by
Clear (1)
Key aspects of turbine protection include overspeed protection, vibration monitoring, temperature monitoring, and lube oil system protection.
Overspeed protection is crucial to prevent catastrophic failure in case of excessive turbine speed.
Vibration monitoring helps detect any abnormal vibrations that could indicate potential issues with the turbine.
Temperature monitoring ensures that the turbine operates within safe t...
Top trending discussions
I applied via Walk-in and was interviewed in May 2023. There were 2 interview rounds.
NHPC offers a challenging work environment, opportunities for growth, and a chance to contribute to the development of the nation's power sector.
NHPC is a leading hydropower company in India with a strong focus on sustainable energy generation.
The company provides a platform for employees to work on cutting-edge projects and technologies.
NHPC offers competitive salaries, benefits, and opportunities for career advanceme...
I plan to leave my current position after ensuring a smooth transition and completing all pending tasks.
I will provide ample notice to my current employer before leaving.
I will ensure all projects and tasks are completed or handed over to a successor.
I will assist in training and transitioning my replacement to ensure a smooth handover.
I will tie up any loose ends and ensure all necessary documentation is in place befo
I applied via Company Website
Boiler tubes are color coded for easy identification and maintenance purposes.
Boiler tubes are typically color coded based on their function or material composition.
Common color codes include blue for feedwater tubes, red for steam tubes, and green for superheater tubes.
Color coding helps maintenance personnel quickly identify and troubleshoot issues with specific tubes.
Color coding also aids in proper installation and...
NTPC expects employees to demonstrate strong leadership, technical skills, commitment to safety, and dedication to achieving company goals.
Demonstrate strong leadership skills in managing teams and projects
Possess technical expertise relevant to the role
Prioritize safety in all operations and decision-making
Show dedication to achieving NTPC's goals and objectives
I applied via Naukri.com and was interviewed in Jun 2023. There were 4 interview rounds.
I applied via Naukri.com and was interviewed before Nov 2023. There were 2 interview rounds.
Normality test in Six Sigma is used to check if data follows a normal distribution, which is important for statistical analysis.
Normality tests help ensure that the data meets the assumptions of the statistical tests being used in Six Sigma.
Common normality tests include Shapiro-Wilk test, Kolmogorov-Smirnov test, and Anderson-Darling test.
If data is not normally distributed, transformations or non-parametric tests may
Hypothesis testing is a statistical method used to make inferences about a population based on sample data.
Hypothesis testing involves formulating a null hypothesis and an alternative hypothesis.
The null hypothesis is assumed to be true until there is enough evidence to reject it.
A significance level is chosen to determine the threshold for rejecting the null hypothesis.
Common hypothesis tests include t-tests, chi-squa...
based on 3 interviews
Interview experience
based on 9 reviews
Rating in categories
Assistant Manager
100
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
51
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
43
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
38
salaries
| ₹0 L/yr - ₹0 L/yr |
Weigh Bridge Operator
25
salaries
| ₹0 L/yr - ₹0 L/yr |
Adani Power
NTPC
Tata Power
Reliance Power