NATM stands for New Austrian Tunneling Method, a construction method for tunnels and underground spaces.
Construction method for tunnels and underground spaces
Involves excavation, support, and monitoring
Developed in Austria in the 1960s
Uses a combination of rock bolts, shotcrete, and steel ribs for support
Powder factor is the amount of explosive required to break a unit volume of rock in blasting operations.
Powder factor is calculated by dividing the total amount of explosive used by the volume of rock being blasted.
The formula for powder factor is: Powder Factor = Total mass of explosives / Volume of rock being blasted.
Powder factor is typically measured in units of kg/m3 or lb/yd3.
A higher powder factor indicates a mo...
Details about TMT and concrete grade
I applied via Company Website and was interviewed in Dec 2021. There was 1 interview round.
NATM experience refers to experience in the New Austrian Tunneling Method.
Experience in designing and constructing tunnels using NATM
Knowledge of the principles and techniques of NATM
Experience in managing NATM projects
Experience in working with NATM equipment and materials
Experience in ensuring safety and quality standards are met in NATM projects
Rate analysis for additional items involves considering various factors and using appropriate methods to determine the cost.
Identify the additional item and its specifications
Determine the quantity required
Research market rates for similar items
Consider factors like labor, materials, equipment, and overhead costs
Calculate the total cost using appropriate rate analysis methods
Example: Rate analysis for installing additi
Material reconciliation is the process of comparing the actual materials used in a project with the planned quantities to identify any discrepancies.
Material reconciliation involves comparing the actual quantities of materials used in a project with the quantities that were planned or estimated.
It helps in identifying any discrepancies or variations between the planned and actual materials, which can be useful for cost...
To raise an Escalation Bill as a Project Engineer, you need to follow certain parameters.
Identify the need for escalation based on project issues or delays
Gather all relevant information and documentation related to the escalation
Prepare a detailed report outlining the problem, its impact, and potential solutions
Present the escalation bill to the appropriate stakeholders or management
Follow up on the escalation and ens
Rate analysis for concrete and underground excavation involves determining the cost of materials, labor, and equipment required for the project.
Rate analysis is a process of calculating the rates of various items involved in a construction project.
For concrete, rate analysis includes determining the cost of cement, sand, aggregates, water, and additives.
The rates are calculated based on the quantities required for a sp...
Patel Engineering interview questions for designations
I applied via Company Website and was interviewed in Oct 2020. There were 4 interview rounds.
Cutting 150 hill in 60 degree slope requires careful planning and execution.
Conduct a thorough survey of the area to determine the best approach
Use heavy machinery such as excavators and bulldozers to remove the hill
Ensure safety measures are in place to prevent accidents
Consider environmental impact and take necessary precautions
Consult with experts in the field for advice and guidance
Protection in 150m height can be achieved through various means.
Use of safety harness and fall protection equipment
Installation of guardrails and safety nets
Implementation of a comprehensive safety plan
Regular inspection and maintenance of equipment
Training and education of workers on safety procedures
The grade of bitumen used in hill areas depends on the temperature and altitude of the region.
The higher the altitude, the harder the bitumen used.
The temperature also plays a crucial role in determining the grade of bitumen.
For example, in colder regions, a harder grade of bitumen is used to prevent cracking and deformation.
In contrast, in warmer regions, a softer grade of bitumen is used to prevent rutting and deform
Concrete in minimum temperature requires proper mix design, curing, and protection from freezing.
Use a mix design with low water-cement ratio and proper amount of cement and admixtures.
Ensure proper curing by covering the concrete with blankets or insulating materials.
Protect the concrete from freezing by using heaters or insulating blankets.
Monitor the temperature of the concrete and the environment during and after p...
Cavity in tunnels can be protected by using various methods.
Waterproofing the tunnel lining
Using grouting techniques to fill the cavity
Installing drainage systems to prevent water accumulation
Regular inspections and maintenance
Using shotcrete to reinforce the tunnel lining
Applying rock bolts to stabilize the surrounding rock
Using steel ribs to support the tunnel lining
Cycle time in tunnel refers to the time taken to complete one cycle of a process or operation within the tunnel.
Cycle time can vary depending on the type of tunnel and the process being carried out.
For example, in a transportation tunnel, cycle time may refer to the time taken for a vehicle to enter and exit the tunnel.
In a manufacturing tunnel, cycle time may refer to the time taken to complete one production cycle.
Ef...
NATM stands for New Austrian Tunneling Method, a technique used in underground construction.
NATM is a tunneling method that involves excavating the tunnel while providing support to the surrounding rock mass.
It was developed in Austria in the 1950s and has since been used in various tunneling projects worldwide.
NATM involves the use of shotcrete, rock bolts, and steel ribs to support the tunnel walls and roof.
Examples ...
The frequency of drilling holes in the face depends on the specific project requirements and geological conditions.
The number of holes drilled in the face will vary depending on the project's needs and the geological conditions of the site.
Factors such as the type of rock, the size of the excavation, and the equipment being used will all influence the frequency of drilling.
It is important to carefully plan and execute ...
Proholes is not a known term in engineering. No data available.
Drain holes are necessary to prevent water accumulation and damage to structures or equipment.
Drain holes allow water to escape from areas where it can cause damage or corrosion.
They are commonly used in outdoor furniture, boats, and buildings to prevent water accumulation.
Drain holes can also be used in machinery to prevent damage from water or other liquids.
Proper placement and size of drain holes is important to ens
The amount of accelerator used in shotcrete depends on various factors.
The type of accelerator used affects the amount required.
The desired strength and setting time also play a role.
The ambient temperature and humidity can affect the amount needed.
Typically, 1-5% of the cement weight is used as accelerator.
The manufacturer's recommendations should be followed for best results.
posted on 10 Nov 2021
posted on 29 Apr 2021
Accidents can be caused by various factors such as human error, equipment failure, environmental conditions, and lack of safety measures.
Human error: Mistakes or negligence by individuals involved in the project.
Equipment failure: Malfunction or breakdown of machinery or tools.
Environmental conditions: Adverse weather, natural disasters, or other external factors.
Lack of safety measures: Insufficient safety protocols o...
Insufficient maintenance of machinery can lead to breakdowns and production delays.
Regular maintenance schedules should be established and followed.
Proper training should be provided to operators and maintenance personnel.
Use of predictive maintenance techniques can help identify potential issues before they become major problems.
Examples: oil changes, lubrication, cleaning, calibration, inspections.
Failure to maintain...
I applied via Naukri.com and was interviewed in May 2024. There were 2 interview rounds.
Code in python for class definition
Case study on business ethics
posted on 10 Jun 2024
posted on 15 Nov 2023
I applied via Naukri.com and was interviewed in Oct 2023. There were 2 interview rounds.
Some of the top questions asked at the Patel Engineering Project Engineer interview for experienced candidates -
based on 2 interviews
Interview experience
based on 28 reviews
Rating in categories
Project Engineer
133
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
73
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Engineer
63
salaries
| ₹0 L/yr - ₹0 L/yr |
Mechanical Engineer
37
salaries
| ₹0 L/yr - ₹0 L/yr |
Surveyor
34
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
Hindustan Construction Company
GAMMON INDIA