Patel Engineering Project Engineer Interview Questions, Process, and Tips for Experienced

Updated 12 Jul 2024

Top Patel Engineering Project Engineer Interview Questions and Answers for Experienced

  • Q1. How you do the rate analysis for additional item and what are the things which you need to be considered during rate analysis with an example.
  • Q2. What is material reconciliation, Escalation Bill?
  • Q3. How you raise Escalation Bill and what are the perameter?
View all 7 questions

Patel Engineering Project Engineer Interview Experiences for Experienced

4 interviews found

Project Engineer Interview Questions & Answers

user image nitesh yadav

posted on 12 Jul 2024

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Jun 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. About your work define self.
  • Q2. Pile, Girder and Major bridge related.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jan 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Related to NATM Tunnel process
  • Q2. 1. What's is NATM process?
  • Ans. 

    NATM stands for New Austrian Tunneling Method, a construction method for tunnels and underground spaces.

    • Construction method for tunnels and underground spaces

    • Involves excavation, support, and monitoring

    • Developed in Austria in the 1960s

    • Uses a combination of rock bolts, shotcrete, and steel ribs for support

  • Answered by AI
  • Q3. 2. What is powder factor and how to calculate powder factor
  • Ans. 

    Powder factor is the amount of explosive required to break a unit volume of rock in blasting operations.

    • Powder factor is calculated by dividing the total amount of explosive used by the volume of rock being blasted.

    • The formula for powder factor is: Powder Factor = Total mass of explosives / Volume of rock being blasted.

    • Powder factor is typically measured in units of kg/m3 or lb/yd3.

    • A higher powder factor indicates a mo...

  • Answered by AI
Round 3 - Aptitude Test 

Details about TMT and concrete grade

Round 4 - HR 

(1 Question)

  • Q1. Salary Discussion, and Experience

Project Engineer Interview Questions Asked at Other Companies for undefined

asked in Wipro
Q1. Segregate Odd-Even Problem Statement In a wedding ceremony at Nin ... read more
Q2. 4)what is sag and how to minimize it. 5)if a consumer having dist ... read more
Q3. What is the difference between lap length and Anchorage length ?
Q4. How to solve the Point load, UDL, UVL load problems
Q5. How you do the rate analysis for additional item and what are the ... read more

I applied via Company Website and was interviewed in Dec 2021. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. NATM experience
  • Ans. 

    NATM experience refers to experience in the New Austrian Tunneling Method.

    • Experience in designing and constructing tunnels using NATM

    • Knowledge of the principles and techniques of NATM

    • Experience in managing NATM projects

    • Experience in working with NATM equipment and materials

    • Experience in ensuring safety and quality standards are met in NATM projects

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I have above six year experience I tunnelling specially NATM

Project Engineer Interview Questions & Answers

user image Naveen Singh PMP

posted on 3 May 2019

Interview Questionnaire 

4 Questions

  • Q1. How you do the rate analysis for additional item and what are the things which you need to be considered during rate analysis with an example.
  • Ans. 

    Rate analysis for additional items involves considering various factors and using appropriate methods to determine the cost.

    • Identify the additional item and its specifications

    • Determine the quantity required

    • Research market rates for similar items

    • Consider factors like labor, materials, equipment, and overhead costs

    • Calculate the total cost using appropriate rate analysis methods

    • Example: Rate analysis for installing additi

  • Answered by AI
  • Q2. What is material reconciliation, Escalation Bill?
  • Ans. 

    Material reconciliation is the process of comparing the actual materials used in a project with the planned quantities to identify any discrepancies.

    • Material reconciliation involves comparing the actual quantities of materials used in a project with the quantities that were planned or estimated.

    • It helps in identifying any discrepancies or variations between the planned and actual materials, which can be useful for cost...

  • Answered by AI
  • Q3. How you raise Escalation Bill and what are the perameter?
  • Ans. 

    To raise an Escalation Bill as a Project Engineer, you need to follow certain parameters.

    • Identify the need for escalation based on project issues or delays

    • Gather all relevant information and documentation related to the escalation

    • Prepare a detailed report outlining the problem, its impact, and potential solutions

    • Present the escalation bill to the appropriate stakeholders or management

    • Follow up on the escalation and ens

  • Answered by AI
  • Q4. EXPLAIN Rate analysis for concrete and underground excavation?
  • Ans. 

    Rate analysis for concrete and underground excavation involves determining the cost of materials, labor, and equipment required for the project.

    • Rate analysis is a process of calculating the rates of various items involved in a construction project.

    • For concrete, rate analysis includes determining the cost of cement, sand, aggregates, water, and additives.

    • The rates are calculated based on the quantities required for a sp...

  • Answered by AI

Patel Engineering interview questions for designations

 Project Engineer - Civil

 (2)

 Project Design Engineer

 (1)

 Project Planning Engineer

 (1)

 Engineer

 (1)

 Electrical Engineer

 (1)

 Site Engineer

 (1)

 QS Engineer

 (1)

 Civil Site Engineer

 (1)

Interview questions from similar companies

I applied via Company Website and was interviewed in Oct 2020. There were 4 interview rounds.

Interview Questionnaire 

13 Questions

  • Q1. What your experience
  • Q2. Crust thickness
  • Q3. How to cut 150 hill in 60 degree slope
  • Ans. 

    Cutting 150 hill in 60 degree slope requires careful planning and execution.

    • Conduct a thorough survey of the area to determine the best approach

    • Use heavy machinery such as excavators and bulldozers to remove the hill

    • Ensure safety measures are in place to prevent accidents

    • Consider environmental impact and take necessary precautions

    • Consult with experts in the field for advice and guidance

  • Answered by AI
  • Q4. How we do Protection in 150m height
  • Ans. 

    Protection in 150m height can be achieved through various means.

    • Use of safety harness and fall protection equipment

    • Installation of guardrails and safety nets

    • Implementation of a comprehensive safety plan

    • Regular inspection and maintenance of equipment

    • Training and education of workers on safety procedures

  • Answered by AI
  • Q5. Which grade of bitumin used in hill area
  • Ans. 

    The grade of bitumen used in hill areas depends on the temperature and altitude of the region.

    • The higher the altitude, the harder the bitumen used.

    • The temperature also plays a crucial role in determining the grade of bitumen.

    • For example, in colder regions, a harder grade of bitumen is used to prevent cracking and deformation.

    • In contrast, in warmer regions, a softer grade of bitumen is used to prevent rutting and deform

  • Answered by AI
  • Q6. How do we concrete in min temp
  • Ans. 

    Concrete in minimum temperature requires proper mix design, curing, and protection from freezing.

    • Use a mix design with low water-cement ratio and proper amount of cement and admixtures.

    • Ensure proper curing by covering the concrete with blankets or insulating materials.

    • Protect the concrete from freezing by using heaters or insulating blankets.

    • Monitor the temperature of the concrete and the environment during and after p...

  • Answered by AI
  • Q7. How do we protect cavity in tunnel
  • Ans. 

    Cavity in tunnels can be protected by using various methods.

    • Waterproofing the tunnel lining

    • Using grouting techniques to fill the cavity

    • Installing drainage systems to prevent water accumulation

    • Regular inspections and maintenance

    • Using shotcrete to reinforce the tunnel lining

    • Applying rock bolts to stabilize the surrounding rock

    • Using steel ribs to support the tunnel lining

  • Answered by AI
  • Q8. Cycle time in tunnel
  • Ans. 

    Cycle time in tunnel refers to the time taken to complete one cycle of a process or operation within the tunnel.

    • Cycle time can vary depending on the type of tunnel and the process being carried out.

    • For example, in a transportation tunnel, cycle time may refer to the time taken for a vehicle to enter and exit the tunnel.

    • In a manufacturing tunnel, cycle time may refer to the time taken to complete one production cycle.

    • Ef...

  • Answered by AI
  • Q9. NATM full form
  • Ans. 

    NATM stands for New Austrian Tunneling Method, a technique used in underground construction.

    • NATM is a tunneling method that involves excavating the tunnel while providing support to the surrounding rock mass.

    • It was developed in Austria in the 1950s and has since been used in various tunneling projects worldwide.

    • NATM involves the use of shotcrete, rock bolts, and steel ribs to support the tunnel walls and roof.

    • Examples ...

  • Answered by AI
  • Q10. How much we drill holes in face
  • Ans. 

    The frequency of drilling holes in the face depends on the specific project requirements and geological conditions.

    • The number of holes drilled in the face will vary depending on the project's needs and the geological conditions of the site.

    • Factors such as the type of rock, the size of the excavation, and the equipment being used will all influence the frequency of drilling.

    • It is important to carefully plan and execute ...

  • Answered by AI
  • Q11. What is proholes and what it's uses
  • Ans. 

    Proholes is not a known term in engineering. No data available.

    • Answered by AI
    • Q12. Why is drain holes we do
    • Ans. 

      Drain holes are necessary to prevent water accumulation and damage to structures or equipment.

      • Drain holes allow water to escape from areas where it can cause damage or corrosion.

      • They are commonly used in outdoor furniture, boats, and buildings to prevent water accumulation.

      • Drain holes can also be used in machinery to prevent damage from water or other liquids.

      • Proper placement and size of drain holes is important to ens

    • Answered by AI
    • Q13. How much asscelerate we used in shotcrete
    • Ans. 

      The amount of accelerator used in shotcrete depends on various factors.

      • The type of accelerator used affects the amount required.

      • The desired strength and setting time also play a role.

      • The ambient temperature and humidity can affect the amount needed.

      • Typically, 1-5% of the cement weight is used as accelerator.

      • The manufacturer's recommendations should be followed for best results.

    • Answered by AI

    Interview Preparation Tips

    Interview preparation tips for other job seekers - Be confident always think and speake

    Interview Questionnaire 

    1 Question

    • Q1. They asked about previous experience and they asked me what’ are piling activities you followed let me explain that’s it

    Interview Preparation Tips

    Interview preparation tips for other job seekers - Share about your knowledge of work experience with confidently

    Interview Questionnaire 

    2 Questions

    • Q1. Causes of accident
    • Ans. 

      Accidents can be caused by various factors such as human error, equipment failure, environmental conditions, and lack of safety measures.

      • Human error: Mistakes or negligence by individuals involved in the project.

      • Equipment failure: Malfunction or breakdown of machinery or tools.

      • Environmental conditions: Adverse weather, natural disasters, or other external factors.

      • Lack of safety measures: Insufficient safety protocols o...

    • Answered by AI
    • Q2. 1. Unsufficient maintenance of machinery.
    • Ans. 

      Insufficient maintenance of machinery can lead to breakdowns and production delays.

      • Regular maintenance schedules should be established and followed.

      • Proper training should be provided to operators and maintenance personnel.

      • Use of predictive maintenance techniques can help identify potential issues before they become major problems.

      • Examples: oil changes, lubrication, cleaning, calibration, inspections.

      • Failure to maintain...

    • Answered by AI

    Interview Preparation Tips

    Interview preparation tips for other job seekers - Be confident only
    Interview experience
    4
    Good
    Difficulty level
    Moderate
    Process Duration
    2-4 weeks
    Result
    Selected Selected

    I applied via Naukri.com and was interviewed in May 2024. There were 2 interview rounds.

    Round 1 - Coding Test 

    Code in python for class definition

    Round 2 - Case Study 

    Case study on business ethics

    Interview Preparation Tips

    Interview preparation tips for other job seekers - prepare
    Interview experience
    5
    Excellent
    Difficulty level
    Easy
    Process Duration
    Less than 2 weeks
    Result
    Selected Selected
    Round 1 - Technical 

    (2 Questions)

    • Q1. Billing Site work
    • Q2. Billing and Site work
    Interview experience
    5
    Excellent
    Difficulty level
    Moderate
    Process Duration
    Less than 2 weeks
    Result
    Selected Selected

    I applied via Naukri.com and was interviewed in Oct 2023. There were 2 interview rounds.

    Round 1 - One-on-one 

    (1 Question)

    • Q1. Civil Structural work
    Round 2 - One-on-one 

    (1 Question)

    • Q1. Any interviews questions

    Patel Engineering Interview FAQs

    How many rounds are there in Patel Engineering Project Engineer interview for experienced candidates?
    Patel Engineering interview process for experienced candidates usually has 2 rounds. The most common rounds in the Patel Engineering interview process for experienced candidates are Technical, One-on-one Round and Resume Shortlist.
    How to prepare for Patel Engineering Project Engineer interview for experienced candidates?
    Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Patel Engineering. The most common topics and skills that interviewers at Patel Engineering expect are Construction Management, Project Management, Civil Engineering, Construction and Execution.
    What are the top questions asked in Patel Engineering Project Engineer interview for experienced candidates?

    Some of the top questions asked at the Patel Engineering Project Engineer interview for experienced candidates -

    1. How you do the rate analysis for additional item and what are the things which ...read more
    2. What is material reconciliation, Escalation Bi...read more
    3. How you raise Escalation Bill and what are the peramet...read more

    Tell us how to improve this page.

    Patel Engineering Project Engineer Interview Process for Experienced

    based on 2 interviews

    Interview experience

    5
      
    Excellent
    View more
    Patel Engineering Project Engineer Salary
    based on 133 salaries
    ₹3.6 L/yr - ₹9.9 L/yr
    19% more than the average Project Engineer Salary in India
    View more details

    Patel Engineering Project Engineer Reviews and Ratings

    based on 28 reviews

    3.9/5

    Rating in categories

    3.6

    Skill development

    3.8

    Work-life balance

    3.4

    Salary

    4.1

    Job security

    3.3

    Company culture

    3.4

    Promotions

    3.6

    Work satisfaction

    Explore 28 Reviews and Ratings
    Project Engineer
    133 salaries
    unlock blur

    ₹0 L/yr - ₹0 L/yr

    Assistant Manager
    73 salaries
    unlock blur

    ₹0 L/yr - ₹0 L/yr

    Civil Engineer
    63 salaries
    unlock blur

    ₹0 L/yr - ₹0 L/yr

    Mechanical Engineer
    37 salaries
    unlock blur

    ₹0 L/yr - ₹0 L/yr

    Surveyor
    34 salaries
    unlock blur

    ₹0 L/yr - ₹0 L/yr

    Explore more salaries
    Compare Patel Engineering with

    Larsen & Toubro Limited

    4.0
    Compare

    Tata Projects

    4.2
    Compare

    Hindustan Construction Company

    4.2
    Compare

    GAMMON INDIA

    3.8
    Compare
    Did you find this page helpful?
    Yes No
    write
    Share an Interview