Filter interviews by
I applied via Walk-in and was interviewed in Jan 2024. There was 1 interview round.
I appeared for an interview in Feb 2025.
ERP processes with the VP of Accounts streamline financial operations and enhance decision-making through integrated data management.
Collaboration: The VP of Accounts works with IT to ensure ERP aligns with financial goals.
Data Integration: ERP systems consolidate financial data from various departments for accurate reporting.
Real-time Reporting: Enables the VP to access up-to-date financial metrics for informed decisi...
I appeared for an interview in Feb 2025, where I was asked the following questions.
ASTM/ASME material codes define standards for materials used in engineering and construction, ensuring quality and safety.
ASTM stands for American Society for Testing and Materials, focusing on material specifications.
ASME stands for American Society of Mechanical Engineers, emphasizing design and construction standards.
Examples of ASTM codes include ASTM A36 for carbon structural steel and ASTM A992 for steel wide-fla...
Implementing cost-effective strategies in piping engineering can significantly reduce project expenses while maintaining quality and safety.
Conduct thorough project planning to identify potential cost-saving opportunities early.
Utilize advanced software for design and simulation to optimize material usage and reduce waste.
Select cost-effective materials that meet project specifications without compromising quality.
Impl...
I prioritize tasks, set clear goals, and use tools to manage my time effectively for optimal project delivery.
Use project management software (e.g., MS Project) to outline tasks and deadlines.
Break down larger projects into weekly and daily goals for better focus.
Schedule regular check-ins with the team to assess progress and adjust plans.
Allocate time for unexpected issues, ensuring flexibility in the schedule.
Review ...
I approach problems systematically, using analysis, collaboration, and proactive solutions to ensure effective resolution.
Identify the root cause: For example, if a pipe is leaking, I investigate the material and installation methods used.
Gather a team: I consult with colleagues from different disciplines to gain diverse perspectives on the issue.
Develop a plan: I create a step-by-step approach to address the problem, ...
Oswal Infrastructure interview questions for popular designations
I applied via LinkedIn and was interviewed in Jan 2024. There were 2 interview rounds.
I applied via Recruitment Consulltant and was interviewed in Nov 2022. There were 3 interview rounds.
Heat exchanger and pressure vessel are mechanical equipment used in various industries for heat transfer and pressure containment.
Heat exchanger is a device used to transfer heat between two or more fluids of different temperatures.
Pressure vessel is a container designed to hold gases or liquids at a pressure substantially different from the ambient pressure.
The function of heat exchanger is to transfer heat from one f...
I applied via Recruitment Consulltant and was interviewed in Apr 2023. There were 2 interview rounds.
I applied via Indeed and was interviewed in Sep 2022. There were 3 interview rounds.
All types dc related questions
I applied via Referral and was interviewed in Sep 2022. There were 3 interview rounds.
Asme B36. 1 to B36. 9 all coding uses which process.
I applied via LinkedIn and was interviewed in Feb 2022. There were 3 interview rounds.
I used the Photovoltaic (PV) system for generating electricity.
I used a PV system that converts sunlight into electricity.
The PV system consists of solar panels, inverters, and batteries.
I used PV modules made of silicon cells to capture sunlight.
The PV system I used had a capacity of 5 kW.
I used a grid-tied PV system that allowed me to sell excess electricity back to the grid.
Viscosity is a measure of a fluid's resistance to flow.
Viscosity is the internal friction of a fluid that determines its resistance to flow.
It is a property of fluids that describes how easily they flow.
Viscosity is influenced by factors like temperature and the presence of impurities.
High viscosity fluids are thick and flow slowly, while low viscosity fluids are thin and flow quickly.
Examples of high viscosity fluids ...
Tube and pipe are both cylindrical hollow structures, but differ in their manufacturing process, size, and application.
Tube is made through extrusion or welding, while pipe is made through casting or forging.
Tube has a smaller diameter and thinner walls compared to pipe.
Tube is commonly used for structural purposes, such as in construction or automotive industry.
Pipe is typically used for conveying fluids or gases, suc...
I applied via Approached by Company and was interviewed before Jan 2023. There was 1 interview round.
Yes
I have 5 years of experience working in the oil and gas industry.
During my time at XYZ Company, I managed several projects in the oil and gas sector, including the construction of a new offshore drilling platform.
I am familiar with industry-specific regulations and safety protocols, such as API standards and HSE guidelines.
I have successfully collaborated with cross-functional teams, including engineers, geologists,...
The duration of Oswal Infrastructure interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 11 interviews
Interview experience
based on 97 reviews
Rating in categories
Piping Engineer
10
salaries
| ₹4.1 L/yr - ₹7.6 L/yr |
QA QC Engineer
8
salaries
| ₹3 L/yr - ₹6.7 L/yr |
Graduate Engineer Trainee (Get)
8
salaries
| ₹2 L/yr - ₹3 L/yr |
Production Engineer
7
salaries
| ₹3.2 L/yr - ₹6.6 L/yr |
Senior Planning Engineer
7
salaries
| ₹5.3 L/yr - ₹8 L/yr |
JLL
CBRE
NoBroker
Sobha