Upload Button Icon Add office photos

Filter interviews by

Oswal Infrastructure Interview Questions, Process, and Tips

Updated 11 Mar 2025

Top Oswal Infrastructure Interview Questions and Answers

View all 6 questions

Oswal Infrastructure Interview Experiences

Popular Designations

16 interviews found

Interview Questions & Answers

user image Anonymous

posted on 11 Mar 2025

Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Feb 2025.

Round 1 - HR 

(2 Questions)

  • Q1. Tell me about yourself
  • Q2. Relocation
Round 2 - Technical 

(2 Questions)

  • Q1. Erp process with VP of account
  • Q2. It managment

Interview Preparation Tips

Interview preparation tips for other job seekers - if getting better offer then it should be join, other wise 10 20 % hike not to be suggest to join
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - HR 

(1 Question)

  • Q1. Do not want to share
Round 2 - Technical 

(1 Question)

  • Q1. Do not want to share
Round 3 - HR 

(1 Question)

  • Q1. Salary discussion

Planning Manager Interview Questions asked at other Companies

Q1. Plan vs progress percentage having negative variance, but updated schedule end date is not getting changed (later finish), why?
View answer (2)
Oswal Infrastructure Interview Questions and Answers for Freshers
illustration image
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jan 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Civil engineering
  • Q2. Building construction
  • Q3. BBS layout level marking Foundation work Piling work Beam Futting work All works
  • Q4. Level checking Level marking Ctsb laying CTS laying WMM laying DBM laying Bc laying Sg top All works
  • Q5. Highway Engineer Structure engineer

Senior Civil Site Engineer Interview Questions asked at other Companies

Q1. B) What is PH value of water for Concrete of Construction ??
View answer (2)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Jan 2024. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Project Experiences
Round 2 - HR 

(1 Question)

  • Q1. Past Work Experience and average durations of work

DGM Operations Interview Questions asked at other Companies

Q1. How do you plan to do the mold manufacturing process.
View answer (2)

Oswal Infrastructure interview questions for popular designations

 Piping Engineer

 (1)

 Safety Officer

 (1)

 Assistant Manager

 (1)

 Quality Engineer

 (1)

 HSE Officer

 (1)

 Senior Estimation Engineer

 (1)

 General Manager

 (1)

 QC Engineer

 (1)

QC Engineer Interview Questions & Answers

user image Anonymous

posted on 27 Dec 2022

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Nov 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all Resume tips
Round 2 - HR 

(1 Question)

  • Q1. Just normal question asked HR in interviews.
Round 3 - Technical 

(1 Question)

  • Q1. What is heat exchanger? What is pressure vessel? Function of he/pv? Mechanical properties with codes and standards? Material grade and difference? ASME codes and standards? NDT test? WPS pqr wpq? P no. F n...
  • Ans. 

    Heat exchanger and pressure vessel are mechanical equipment used in various industries for heat transfer and pressure containment.

    • Heat exchanger is a device used to transfer heat between two or more fluids of different temperatures.

    • Pressure vessel is a container designed to hold gases or liquids at a pressure substantially different from the ambient pressure.

    • The function of heat exchanger is to transfer heat from one f...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Give answer with confidence and act like normal. Sound knowledge of technical must.
Tolerance of each stage must be clear.
Follow ASME codes and standards.

QC Engineer Interview Questions asked at other Companies

Q1. What is heat exchanger? What is pressure vessel? Function of he/pv? Mechanical properties with codes and standards? Material grade and difference? ASME codes and standards? NDT test? WPS pqr wpq? P no. F no. A no? ITP stage?
View answer (1)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Apr 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all Resume tips
Round 2 - HR 

(3 Questions)

  • Q1. General question
  • Q2. Why you are changing the job
  • Q3. Final round physical

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep it

Assistant Manager Interview Questions asked at other Companies

Q1. You are Handling cash operations then how you manage operations with sales ?
View answer (88)

I applied via Indeed and was interviewed in Sep 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all Resume tips
Round 2 - Aptitude Test 

All types dc related questions

Round 3 - Technical 

(3 Questions)

  • Q1. Ms office excel formulas and outlook speed test
  • Q2. Work experience with job responsibilities details
  • Q3. No any problem in interview

Interview Preparation Tips

Interview preparation tips for other job seekers - All documents and experience certificate with all types questions

Document Controller Interview Questions asked at other Companies

Q1. How many Engineering Documents will be process if you handle EPC project?
View answer (4)

I applied via Referral and was interviewed in Sep 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all Resume tips
Round 2 - Coding Test 

Asme B36. 1 to B36. 9 all coding uses which process.

Round 3 - Technical 

(2 Questions)

  • Q1. All pipe fitting. And its standard, hydrotest process and pneumatic test process how to done. About test package.
  • Q2. About My previous project experience. Which standard you flow. About P&id, About iso, iso which angel work etc..

Interview Preparation Tips

Interview preparation tips for other job seekers - It's process to any job is useful this type of job

Piping Engineer Interview Questions asked at other Companies

Q1. What is the basic difference between Pipe specification A106 Gr.A / Gr.B/ Gr.C.?
View answer (4)

I applied via LinkedIn and was interviewed in Feb 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - HR 

(2 Questions)

  • Q1. 1. Ask about netive place
  • Q2. 2. About interested 3. Asking about internships
Round 3 - Technical 

(5 Questions)

  • Q1. 1. Define your final year Project
  • Ans. Electro Mechanical car, it's hybrid car drive on two way source padel and traction motor, and got power by PV Panels and Alternator
  • Answered Anonymously
  • Q2. 2. Which PV you used ?
  • Ans. 

    I used the Photovoltaic (PV) system for generating electricity.

    • I used a PV system that converts sunlight into electricity.

    • The PV system consists of solar panels, inverters, and batteries.

    • I used PV modules made of silicon cells to capture sunlight.

    • The PV system I used had a capacity of 5 kW.

    • I used a grid-tied PV system that allowed me to sell excess electricity back to the grid.

  • Answered by AI
  • Q3. 3. What is Viscosity ?
  • Ans. 

    Viscosity is a measure of a fluid's resistance to flow.

    • Viscosity is the internal friction of a fluid that determines its resistance to flow.

    • It is a property of fluids that describes how easily they flow.

    • Viscosity is influenced by factors like temperature and the presence of impurities.

    • High viscosity fluids are thick and flow slowly, while low viscosity fluids are thin and flow quickly.

    • Examples of high viscosity fluids ...

  • Answered by AI
  • Q4. Difference Between tube and Pipe
  • Ans. 

    Tube and pipe are both cylindrical hollow structures, but differ in their manufacturing process, size, and application.

    • Tube is made through extrusion or welding, while pipe is made through casting or forging.

    • Tube has a smaller diameter and thinner walls compared to pipe.

    • Tube is commonly used for structural purposes, such as in construction or automotive industry.

    • Pipe is typically used for conveying fluids or gases, suc...

  • Answered by AI
  • Q5. What's your hobby or interest

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't get anxiety, be confident and if you don't know any thing politely said I don't know I had remember but suddenly I slipped by mind

Graduate Engineer Trainee (Get) Interview Questions asked at other Companies

Q1. Q: 1 What is IC engine? What is the types of IC engine? Q:2 Difference between Otto cycle and Diesel cycle? What is the process of both cycle and what is the effeciency of both cycle ? Which one is good in effeciency? Q:3 Difference between... read more
View answer (2)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Jan 2023. There was 1 interview round.

Round 1 - HR 

(6 Questions)

  • Q1. General Introduction
  • Q2. Oil & Gas Specific Experience
  • Ans. 

    Yes

    • I have 5 years of experience working in the oil and gas industry.

    • During my time at XYZ Company, I managed several projects in the oil and gas sector, including the construction of a new offshore drilling platform.

    • I am familiar with industry-specific regulations and safety protocols, such as API standards and HSE guidelines.

    • I have successfully collaborated with cross-functional teams, including engineers, geologists,...

  • Answered by AI
  • Q3. IMS & SOP Knowledge
  • Q4. Notable Problems Solved during past job experience
  • Q5. Team Building and Team Management Skills shown in Past
  • Q6. Technical knowledge

Interview Preparation Tips

Interview preparation tips for other job seekers - Be real in what you say, show clear expectation , Be confident in the overall process and things will be easy.

Project General Engineer Trainee Interview Questions asked at other Companies

Q1. Oil & Gas Specific Experience
View answer (1)
Contribute & help others!
anonymous
You can choose to be anonymous

Oswal Infrastructure Interview FAQs

How many rounds are there in Oswal Infrastructure interview?
Oswal Infrastructure interview process usually has 2-3 rounds. The most common rounds in the Oswal Infrastructure interview process are HR, Technical and Resume Shortlist.
What are the top questions asked in Oswal Infrastructure interview?

Some of the top questions asked at the Oswal Infrastructure interview -

  1. What is heat exchanger? What is pressure vessel? Function of he/pv? Mechanical ...read more
  2. 2. Which PV you use...read more
  3. 3. What is Viscosit...read more
How long is the Oswal Infrastructure interview process?

The duration of Oswal Infrastructure interview process can vary, but typically it takes about less than 2 weeks to complete.

Recently Viewed

JOBS

Berger Paints

No Jobs

REVIEWS

Berger Paints

No Reviews

SALARIES

Berger Paints

REVIEWS

Berger Paints

No Reviews

REVIEWS

Bain & Company

No Reviews

REVIEWS

Berger Paints

No Reviews

REVIEWS

Bain & Company

No Reviews

SALARIES

Aculife Healthcare

DESIGNATION

SALARIES

Berger Paints

Tell us how to improve this page.

Oswal Infrastructure Interview Process

based on 10 interviews

Interview experience

4.4
  
Good
View more

Interview Questions from Similar Companies

Tata Power Interview Questions
3.9
 • 162 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
GAMMON INDIA Interview Questions
3.8
 • 29 Interviews
Essar Group Interview Questions
3.7
 • 28 Interviews
View all

Oswal Infrastructure Reviews and Ratings

based on 93 reviews

3.6/5

Rating in categories

3.4

Skill development

3.5

Work-life balance

3.4

Salary

3.4

Job security

3.3

Company culture

3.2

Promotions

3.4

Work satisfaction

Explore 93 Reviews and Ratings
Piping Engineer
10 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

QA QC Engineer
8 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Graduate Engineer Trainee (Get)
8 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Production Engineer
7 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Planning Engineer
7 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Oswal Infrastructure with

Larsen & Toubro Limited

4.0
Compare

GMR Group

4.0
Compare

Reliance Infrastructure

4.1
Compare

Adani Enterprises

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview
Rate your experience using AmbitionBox
Terrible
Terrible
Poor
Poor
Average
Average
Good
Good
Excellent
Excellent