Filter interviews by
I applied via Referral and was interviewed in Apr 2022. There were 2 interview rounds.
Top trending discussions
I applied via Walk-in and was interviewed in Jul 2024. There was 1 interview round.
Networking in hardware refers to the process of connecting multiple hardware devices together to share resources and communicate with each other.
Networking hardware includes devices such as routers, switches, and modems.
Network cables and wireless connections are used to establish connections between hardware devices.
Networking protocols like TCP/IP govern how data is transmitted and received over a network.
Examples of...
I applied via Company Website and was interviewed in Nov 2023. There were 2 interview rounds.
Safety features in mixers include locking mechanisms, splash guards, and emergency stop buttons.
Locking mechanisms prevent accidental operation of the mixer.
Splash guards help contain ingredients and prevent splattering.
Emergency stop buttons allow for quick shutdown in case of an emergency.
Some mixers also have overload protection to prevent motor burnout.
Mixers may have safety interlocks to ensure the bowl is properl
The motor working principle involves converting electrical energy into mechanical energy through the interaction of magnetic fields.
Electric current flows through a coil of wire, creating a magnetic field.
The magnetic field interacts with a permanent magnet, causing the coil to rotate.
This rotation is used to drive mechanical components, such as a fan or a pump.
QA process involves planning, executing, and evaluating software to ensure quality. Types include manual, automated, regression, and performance testing.
QA process involves planning, executing, and evaluating software to ensure quality
Types of QA include manual testing, where tests are performed manually by QA analysts
Automated testing uses tools to execute test cases and compare actual outcomes with expected outcomes
R...
STLC stands for Software Testing Life Cycle, which is a series of steps performed to ensure the quality of software.
STLC includes phases like requirement analysis, test planning, test design, test execution, and test closure.
Each phase has specific activities and deliverables to ensure thorough testing of the software.
STLC helps in identifying defects early in the development process, reducing costs and improving overa...
I applied via Naukri.com and was interviewed in Oct 2023. There was 1 interview round.
First there will be an assignment.
I was interviewed in Aug 2023.
I applied via Recruitment Consulltant and was interviewed in Dec 2022. There were 3 interview rounds.
Know how of fruits and vegetables
I was interviewed before Nov 2023.
Prioritizing multiple tasks involves assessing urgency, importance, and deadlines to determine the order of completion.
Evaluate the urgency and importance of each task
Consider deadlines and time constraints
Use tools like to-do lists or project management software to organize tasks
Communicate with stakeholders to clarify priorities
Adjust priorities as needed based on changing circumstances
posted on 15 Jun 2024
I applied via Naukri.com and was interviewed before Jun 2023. There were 4 interview rounds.
Test the Application.
Basic aptitude questions.
based on 4 reviews
Rating in categories
Driver
736
salaries
| ₹1 L/yr - ₹6.5 L/yr |
CAR Driver
561
salaries
| ₹1 L/yr - ₹6 L/yr |
Program Manager
247
salaries
| ₹9.5 L/yr - ₹34 L/yr |
Assistant Manager
246
salaries
| ₹5.1 L/yr - ₹17.8 L/yr |
Senior Executive
227
salaries
| ₹2 L/yr - ₹7.5 L/yr |
Uber
Meru cabs
Zoomcar
Rapido