Ncc Urban Infrastructure Project Engineer Interview Questions and Answers

Updated 2 Dec 2021

Ncc Urban Infrastructure Project Engineer Interview Experiences

1 interview found

I applied via Referral and was interviewed in Nov 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Explain about mivan Shuttering
  • Ans. 

    Mivan shuttering is a type of construction technique that uses aluminium formwork instead of traditional timber formwork.

    • Mivan shuttering is a fast-paced construction technique that allows for quick assembly and disassembly of formwork.

    • It uses pre-engineered aluminium panels and beams that are easy to handle and transport.

    • The system is highly efficient and reduces construction time and costs.

    • Mivan shuttering is commonl...

  • Answered by AI
  • Q2. What is this prosser for high raised residential buildings
  • Ans. 

    The process for high raised residential buildings involves various stages of planning, design, construction, and safety measures.

    • The process starts with site selection and feasibility study

    • Designing the building structure and layout

    • Obtaining necessary permits and approvals

    • Construction of the building using appropriate materials and techniques

    • Installation of safety features such as fire alarms, sprinkler systems, and em...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good knowledge people will get the job easily

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Apr 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Coding Test 

It was basic level coding question. you can answer if you strong in basic level of java

Round 3 - HR 

(1 Question)

  • Q1. Why CTS? are u willing to work in any location? expected salary?
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Many questions on project and leadership

Interview Preparation Tips

Interview preparation tips for other job seekers - Brush your skills, practice and always be honest.. confidence is extremely important and with only truth you can be super confident. Hiding truth may also get job but for job satisfaction only truth will help and Honest unbiased reviewer will definitely find you. Have patience and All the best!

I was interviewed in Aug 2022.

Round 1 - Technical 

(14 Questions)

  • Q1. Two types of road 1:- Flexible pavements 2:- Rigid pavement Surveying, NGL, Enchrochment, OGL
  • Q2. FLEXIBLE PAVEMENT 1:- Embankment:- taking thickness 3m compacted .approximate,as per site conditions. Large size of soil particles 75mm lumps and cloud. Liquid limit <50% Plastic limit <25% Swelling a...
  • Q3. 2:- Subgrade:- Total thickness 500mm compacted two layer 250mm &250mm vibration roller. Large size of soil particles 50mm lumps and cloud, Effective CBR as per design Compaction :- 97% Subgrade grad...
  • Q4. Emulsion :- 1 :- prime coat :- low viscous cut back bitumen on wmm surfaces area and filling Up pores, voids . 2:- Tack coat:- Light application bitumen, asphalt, emulsion, and diluted water on the...
  • Q5. DBM:- it total thickness 150mm two layer compacted 75mm&75 mm, aggregate size 20mm to. 28mm,VG30 Grade bitumen .
  • Q6. Emulsion:- Tackcoat :- Light application of. Bitumen, asphalt, emulsion, and dilute water on the Surfaces area of DBM.
  • Q7. BC :- Total thickness 40mm/ 50mm compacted. It is mixture of aggregate chips 13.1mm. and bitumen VG30 grade. Seal coat :- Total thicknesses of 6 to 8mm Mix with bitumen, gravel,and coars sand.
  • Q8. Bituminous laying temperature 130 degree celceious to 150 degree celceious. Bituminous rolling temperature 80 degree celceious to 100 degree celceious.
  • Ans. 

    Bituminous laying temperature is 130-150°C and rolling temperature is 80-100°C.

    • Bituminous laying requires higher temperature than rolling.

    • Temperature range ensures proper compaction and adhesion.

    • Temperature can vary based on the type of bitumen and aggregate used.

    • Proper temperature control is crucial for quality bituminous pavement.

  • Answered by AI
  • Q9. RIGID PAVEMENT:-All process is a same above embankment to GSB. DLC:-150MM THICKNESSES TOLERANCE +/_6MM COMACTED PQC PAVEMENT:- 300MM THICKNESSES TOLERANCE +/-6MM COMPACTED
  • Q10. DLC:- Material suitability 1:- Aggregate size is 26.5 mm 2:-water absorption 2% max 3:- Soundness test:- ..Naso4= 12% Mgso4=18% 4:...
  • Ans. 

    Material suitability criteria for aggregate in construction projects.

    • Aggregate size should be 26.5 mm or less.

    • Water absorption should not exceed 2%.

    • Soundness test should show Naso4 not more than 12% and Mgso4 not more than 18%.

    • Angle of abrasion should be less than 35% with max FI & EI less than 35%.

    • Equivalent weight of sand should not be less than 50%.

    • Aggregate should not be alkaline reactive.

    • MDD & MCC should be as per

  • Answered by AI
  • Q11. DESIGN PROCEDURE. 1:-Use M15 grade concete. Aggregate and cement ratio 12:1 2:- The minimum cement content 150 kg/ cum. If the fly ash more than 20% the minimum cement contents 120 kg/cum. 3:-compre...
  • Ans. 

    The design procedure for DLC mix includes using M15 grade concrete, minimum cement content of 150 kg/cum, and achieving a compressive strength of at least 10 MPA after 7 days of curing.

    • Use M15 grade concrete with aggregate and cement ratio of 12:1

    • Minimum cement content of 150 kg/cum, or 120 kg/cum if fly ash content is over 20%

    • Achieve a compressive strength of at least 10 MPA after 7 days of curing

    • DLC mix should be hom...

  • Answered by AI
  • Q12. PQC :- Total thicknesses 300mm compacted tolerance +_6mm Material sutabilitey:- 1:- Aggregate size 31.5mm Water absorption to GSB DlC is same for PQC.
  • Ans. 

    The question is about the suitability of aggregate size and water absorption for PQC with a total thickness of 300mm and tolerance of +/-6mm.

    • Aggregate size of 31.5mm is suitable for PQC with a total thickness of 300mm and tolerance of +/-6mm.

    • Water absorption to GSB DLC being the same for PQC is also suitable.

    • The suitability of the material is important for the successful completion of the project.

  • Answered by AI
  • Q13. DESINGN PROCEDURE:- 1:- The minimum cement content 360 kg/ cum, if the fly ash is more than 2o% The minimum cement content 310 kg percum. 2:-The flexuar strength of cement concete after 28day curing...
  • Ans. 

    The design procedure for cement concrete includes minimum cement content, strength requirements, dowel bar and tie bar specifications, and surface preparation and curing techniques.

    • Minimum cement content of 360 kg/cum if fly ash is more than 20%, and 310 kg/cum otherwise

    • Flexural strength of cement concrete after 28-day curing should be 4.5 MPa, and compressive strength should be 40 MPa

    • Dowel bar size of 32mm dia and 300...

  • Answered by AI
  • Q14. National highyway =2 to 4 lane Expressway. =6 to lane Construction coast of National 8 to 10 core /km Expressway construction coast= 14 core to 16core/ km

Interview Preparation Tips

Interview preparation tips for other job seekers - Expressway many smart and intlegent featue
HTMS - High traffic management system
VIDS:- Visual icedent deduction system
Many facilities in Expressway
1:- Excess rap
2;- line divider
3:-Grade seperation
4 Elevated section
Expressway is not multiple lane. It connected national highway
Round 1 - HR 

(3 Questions)

  • Q1. What are your strengths and weaknesses?
  • Q2. Tell me about yourself.
  • Q3. Very patience. Salary Neagotation.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company technicaly sound.
Good management.
Good wellfare.
Over all good.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Apr 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Coding Test 

It was basic level coding question. you can answer if you strong in basic level of java

Round 3 - HR 

(1 Question)

  • Q1. Why CTS? are u willing to work in any location? expected salary?

Ncc Urban Infrastructure Interview FAQs

What are the top questions asked in Ncc Urban Infrastructure Project Engineer interview?

Some of the top questions asked at the Ncc Urban Infrastructure Project Engineer interview -

  1. What is this prosser for high raised residential buildin...read more
  2. Explain about mivan Shutteri...read more

Tell us how to improve this page.

Ncc Urban Infrastructure Project Engineer Salary
based on 64 salaries
₹3.4 L/yr - ₹6.6 L/yr
6% less than the average Project Engineer Salary in India
View more details

Ncc Urban Infrastructure Project Engineer Reviews and Ratings

based on 20 reviews

4.0/5

Rating in categories

3.5

Skill development

4.0

Work-life balance

3.5

Salary

3.8

Job security

3.5

Company culture

3.2

Promotions

3.6

Work satisfaction

Explore 20 Reviews and Ratings
Project Engineer
64 salaries
unlock blur

₹3.3 L/yr - ₹6.6 L/yr

Junior Engineer Civil
54 salaries
unlock blur

₹2.2 L/yr - ₹4.8 L/yr

Junior Engineer
41 salaries
unlock blur

₹1.9 L/yr - ₹4.6 L/yr

Senior Project Engineer
28 salaries
unlock blur

₹6 L/yr - ₹8.9 L/yr

Senior Engineer
17 salaries
unlock blur

₹4.2 L/yr - ₹8.2 L/yr

Explore more salaries
Compare Ncc Urban Infrastructure with

DLF

4.0
Compare

Sobha

3.9
Compare

Prestige Group

4.3
Compare

Godrej Properties

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview