Filter interviews by
I applied via Job Portal
Top trending discussions
I applied via Approached by Company and was interviewed in Oct 2022. There were 3 interview rounds.
I applied via Approached by Company and was interviewed in Oct 2022. There were 3 interview rounds.
posted on 31 Jul 2021
I applied via Naukri.com and was interviewed in Feb 2021. There were 5 interview rounds.
The unit weight of reinforcement bar can be found by calculating the weight per unit length.
The unit weight of reinforcement bar is calculated by dividing the weight of the bar by its length.
The weight of the bar can be determined by multiplying the cross-sectional area of the bar by the density of the material.
The length of the bar is measured in meters or feet, depending on the unit system used.
The density of the mat...
Unit weights of building materials are important for quantity surveying.
Unit weight of concrete is around 2400 kg/m³
Unit weight of brick is around 1920 kg/m³
Unit weight of steel is around 7850 kg/m³
Unit weight of timber is around 500 kg/m³
Unit weight of glass is around 2500 kg/m³
Manpower productivity refers to the efficiency of workers in completing tasks within a given timeframe.
It is important to measure and track productivity to identify areas for improvement.
Factors that can affect productivity include training, equipment, and work environment.
Productivity can be improved through better planning, organization, and communication.
Examples of productivity measures include output per worker, t...
The procedure for billing involves preparing an invoice based on the work completed and submitting it to the client for payment.
Review the contract to ensure all work completed is billable
Prepare an invoice detailing the work completed and the corresponding costs
Submit the invoice to the client for payment within the agreed upon timeframe
Follow up with the client to ensure payment is received on time
Yes, bar bending schedule is calculated by determining the number, length, and shape of bars required for a reinforced concrete structure.
Calculate the total length of bars required for each size and type
Determine the number of bars required for each size and type
Calculate the shape and bending details of each bar
Prepare a detailed schedule of all the bars required for the structure
Ensure compliance with design and con
posted on 24 Mar 2022
I applied via Naukri.com and was interviewed before Mar 2021. There was 1 interview round.
based on 3 reviews
Rating in categories
Project Engineer
64
salaries
| ₹3.3 L/yr - ₹6.6 L/yr |
Junior Engineer Civil
54
salaries
| ₹2.2 L/yr - ₹4.8 L/yr |
Junior Engineer
41
salaries
| ₹1.9 L/yr - ₹4.6 L/yr |
Senior Project Engineer
28
salaries
| ₹6 L/yr - ₹8.9 L/yr |
Senior Engineer
17
salaries
| ₹4.2 L/yr - ₹8.2 L/yr |
DLF
Sobha
Prestige Group
Godrej Properties