Filter interviews by
I have 2 years of experience working as an Assistant Engineer in a construction company.
Assisted in project planning and execution
Performed site inspections and quality control checks
Collaborated with engineers and contractors to ensure project deadlines were met
Top trending discussions
I applied via Walk-in and was interviewed before Feb 2022. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.
The height of top guard rails, mid rails, and toe board rails varies depending on the specific application and regulations.
The height of top guard rails is typically between 42 and 45 inches above the walking surface.
Mid rails are typically located halfway between the top rail and the walking surface.
Toe board rails are typically between 4 and 6 inches high and are installed at the base of the guardrail system.
Specific...
Safe working load is the maximum weight a structure or equipment can safely support without risk of failure.
SWL is determined by factors such as material strength, design, and intended use.
Formula for SWL varies depending on the type of equipment or structure.
For example, the SWL formula for a crane may take into account the boom length, angle, and weight distribution.
It is important to always follow the manufacturer's...
I applied via Referral and was interviewed in Jul 2023. There was 1 interview round.
Software or tool test
I applied via Naukri.com and was interviewed in Feb 2024. There were 3 interview rounds.
Face interview when it will be there??
I applied via Naukri.com and was interviewed in Apr 2023. There were 2 interview rounds.
OEE is a measure of manufacturing productivity. Improving it involves reducing downtime, increasing speed, and minimizing defects.
Calculate OEE by multiplying availability, performance, and quality rates.
Reduce downtime by improving maintenance and scheduling.
Increase speed by optimizing processes and equipment.
Minimize defects by improving quality control and training.
Use data analysis to identify areas for improvemen...
Problem solving tools are techniques used to identify, analyze and solve problems.
Root Cause Analysis (RCA) helps identify the underlying cause of a problem
Fishbone Diagrams help identify the potential causes of a problem
5 Whys technique helps identify the root cause of a problem by asking 'why' five times
Pareto Analysis helps prioritize problems based on their impact
Brainstorming helps generate ideas and solutions to ...
TPM is implemented in shopfloor through a structured approach involving 5S, autonomous maintenance, and continuous improvement.
TPM involves a cultural shift towards proactive maintenance and continuous improvement
The implementation process starts with 5S to create a clean and organized workplace
Autonomous maintenance involves empowering operators to perform routine maintenance tasks
TPM also involves planned maintenance...
I applied via Shine and was interviewed in Jun 2024. There was 1 interview round.
based on 4 reviews
Rating in categories
Project Engineer
60
salaries
| ₹3.3 L/yr - ₹6.6 L/yr |
Junior Engineer Civil
54
salaries
| ₹2.2 L/yr - ₹4.8 L/yr |
Junior Engineer
32
salaries
| ₹2.2 L/yr - ₹4.8 L/yr |
Senior Project Engineer
28
salaries
| ₹6 L/yr - ₹10 L/yr |
Senior Engineer
17
salaries
| ₹4.2 L/yr - ₹8.2 L/yr |
Patel Infrastructure
CTS Consulting & Technical Support
J K Fenner
Saudi Binladin Group