Upload Button Icon Add office photos

Ncc Urban Infrastructure

Compare button icon Compare button icon Compare

Filter interviews by

Ncc Urban Infrastructure Interview Questions and Answers

Updated 24 Nov 2024

Ncc Urban Infrastructure Interview Experiences

Popular Designations

8 interviews found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Assignment 

Good company and opportunity

Round 2 - Assignment 

Good quotations good opportunity

Round 3 - Technical 

(2 Questions)

  • Q1. Good company good opportunity
  • Q2. Good company and Good oprtunity

Electrical Engineer Interview Questions asked at other Companies

Q1. What is the difference between Switch gear & Circuit Breakers ?
View answer (13)

Safety Officer Interview Questions & Answers

user image Nitin Singh

posted on 24 Nov 2024

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Work experience
  • Q2. Expected salary

Safety Officer Interview Questions asked at other Companies

Q1. If you don't have any safety equipment and documents how to complete the work ?
View answer (18)
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(5 Questions)

  • Q1. Please send the interview date
  • Q2. Good knowledge of administrative
  • Q3. Payroll for timesheet and logsheet
  • Q4. Good management office work
  • Q5. Vehicle management

Office Administrator Interview Questions asked at other Companies

Q1. Incase There are 4 members in our store along with you, you are the Manager, 2 persons In week off, 1 person in Leave, 1 person Is fell down in Store... At that time Customer walkin flow is Coming, How you handle The Store?
View answer (2)

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 19 Jun 2022

I applied via Company Website and was interviewed in May 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Related to construction work & my course .
  • Q2. Related to my job & advices with study's

Interview Preparation Tips

Topics to prepare for Ncc Urban Infrastructure Site Engineer interview:
  • Link Building
Interview preparation tips for other job seekers - See& learn & do it with your own decisions & knowledge

Site Engineer Interview Questions asked at other Companies

Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimension? 3.Types of cement? 4.Full form of tmt, pcc, rcc, tmx, dpc 5.Definition of plinth area, courtyard area, built-up area? 6.function of dpc 8.standard size of brick? 9. Write g... read more
View answer (4)

Ncc Urban Infrastructure interview questions for popular designations

 Assistant Engineer

 (1)

 Safety Officer

 (1)

 Electrical Engineer

 (1)

 Project Engineer

 (1)

 Estate Manager

 (1)

 Site Engineer

 (1)

 Office Administrator

 (1)

 Quantity Surveyor

 (1)

I applied via Job Portal

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Tell me your projects done in your carier.

Interview Preparation Tips

Interview preparation tips for other job seekers - Just tell what you done previously. Details of proponents govt or non govt.

Quantity Surveyor Interview Questions asked at other Companies

Q1. What will you do if the site qty differ from Drawing qty
View answer (8)

I applied via Referral and was interviewed in Nov 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Explain about mivan Shuttering
  • Ans. 

    Mivan shuttering is a type of construction technique that uses aluminium formwork instead of traditional timber formwork.

    • Mivan shuttering is a fast-paced construction technique that allows for quick assembly and disassembly of formwork.

    • It uses pre-engineered aluminium panels and beams that are easy to handle and transport.

    • The system is highly efficient and reduces construction time and costs.

    • Mivan shuttering is commonl...

  • Answered by AI
  • Q2. What is this prosser for high raised residential buildings
  • Ans. 

    The process for high raised residential buildings involves various stages of planning, design, construction, and safety measures.

    • The process starts with site selection and feasibility study

    • Designing the building structure and layout

    • Obtaining necessary permits and approvals

    • Construction of the building using appropriate materials and techniques

    • Installation of safety features such as fire alarms, sprinkler systems, and em...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good knowledge people will get the job easily

Project Engineer Interview Questions asked at other Companies

Q1. Triangle Star Pattern Task Your task is to print a triangle pattern using stars (*) for a given integer N, which represents the number of rows. Input: Integer N (Total number of rows) Output: The triangle pattern printed over N lines Exampl... read more
View answer (12)

Interview Questionnaire 

4 Questions

  • Q1. Disscuss on Experience
  • Q2. Present working experience
  • Ans. 

    I have 2 years of experience working as an Assistant Engineer in a construction company.

    • Assisted in project planning and execution

    • Performed site inspections and quality control checks

    • Collaborated with engineers and contractors to ensure project deadlines were met

  • Answered by AI
  • Q3. All related to electrical engineer also with project previous experience
  • Q4. Package discussion

Interview Preparation Tips

Round: Resume Shortlist
Experience: Shortlisted from Naukri.Com

Assistant Engineer Interview Questions asked at other Companies

Q1. 1.Define the term capacitance & inductance 2.what is Rectifier 3. What is referred to the electron in the outer orbit 4.what kind of cable used in transmission line 5.Explain Rlc circuit 6.what happen if series current is double
View answer (4)

Estate Manager Interview Questions & Answers

user image Brahmparkash Sharma

posted on 5 Dec 2017

I applied via Referral and was interviewed before Dec 2016. There were 2 interview rounds.

Interview Preparation Tips

Round: Resume Shortlist
Experience: On base of my Defense background.

General Tips: It was a formal talk as my Defense experience spoke loud.
Skills: Presentation Skills, Presence Of Mind, Analytical Skills, Problem Solving Skills, Soft skills, people management, Risk mgmt, time mgmt, security mgmt, facility mgmt etc., Communication, Problem Solving, Analytical Skills, Leadership, Presentation Skills, Time Management, Decision Making Skills, Body Language
Duration: 1-4 weeks

Estate Manager Interview Questions asked at other Companies

Q1. How to manage the employees working under your supervision?
View answer (1)

Interview questions from similar companies

I applied via Company Website and was interviewed in Aug 2020. There were 6 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Aptitude consist Logical very important and then few programming error find and then quantitative

Interview Preparation Tips

Interview preparation tips for other job seekers - For fresher company have very strict criteria 75% thought in education. They take all interview with their on software including Aptitude+ Realtime system test and PI in person. They offer good package for AI and ML rest will be selected into different team of development.

I applied via Campus Placement and was interviewed before Aug 2020. There were 6 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. List out some of the best practice for data cleaning.
  • Ans. 

    Data cleaning best practices

    • Remove duplicate records

    • Handle missing values

    • Standardize data formats

    • Correct inconsistent data

    • Validate data integrity

    • Remove outliers

    • Normalize data

    • Handle data inconsistencies

    • Ensure data accuracy

  • Answered by AI
  • Q2. Explain what is logistic regression?
  • Ans. 

    Logistic regression is a statistical method used to analyze and model the relationship between a categorical dependent variable and one or more independent variables.

    • It is a type of regression analysis used for predicting the probability of a categorical outcome

    • It is commonly used in binary classification problems

    • It uses a logistic function to model the relationship between the independent variables and the dependent v...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - If you are going for Interview in J&F as Fresher then its very difficult because its product based team and they dont usually hire from normal colleges. They hire from top tier colleges in NCR like IIT delhi and DCE. So even if you get selected you have long way to go for conversion. They do first round based on Aptitude and then give you one research task that you need to bring solution and based on your provided approach only you have chance for next step in technical discussion.

Skills evaluated in this interview

Ncc Urban Infrastructure Interview FAQs

How many rounds are there in Ncc Urban Infrastructure interview?
Ncc Urban Infrastructure interview process usually has 1-2 rounds. The most common rounds in the Ncc Urban Infrastructure interview process are HR, Assignment and Resume Shortlist.
How to prepare for Ncc Urban Infrastructure interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Ncc Urban Infrastructure. The most common topics and skills that interviewers at Ncc Urban Infrastructure expect are Bcp, Quantity Surveying, Receipt, Site Execution and Accounting Functions.
What are the top questions asked in Ncc Urban Infrastructure interview?

Some of the top questions asked at the Ncc Urban Infrastructure interview -

  1. What is this prosser for high raised residential buildin...read more
  2. Explain about mivan Shutteri...read more
  3. Good company and Good oprtun...read more

Tell us how to improve this page.

Ncc Urban Infrastructure Interview Process

based on 10 interviews

Interview experience

3.9
  
Good
View more

Interview Questions from Similar Companies

Sobha Interview Questions
3.8
 • 129 Interviews
DLF Interview Questions
3.9
 • 76 Interviews
Prestige Group Interview Questions
4.3
 • 36 Interviews
Brigade Group Interview Questions
4.1
 • 32 Interviews
Oberoi Realty Interview Questions
4.1
 • 17 Interviews
View all

Ncc Urban Infrastructure Reviews and Ratings

based on 176 reviews

3.9/5

Rating in categories

3.7

Skill development

3.7

Work-life balance

3.7

Salary

3.7

Job security

3.5

Company culture

3.3

Promotions

3.6

Work satisfaction

Explore 176 Reviews and Ratings
Project Engineer
62 salaries
unlock blur

₹3.3 L/yr - ₹6.6 L/yr

Junior Engineer Civil
54 salaries
unlock blur

₹2.2 L/yr - ₹4.8 L/yr

Junior Engineer
32 salaries
unlock blur

₹2.2 L/yr - ₹4.8 L/yr

Senior Project Engineer
28 salaries
unlock blur

₹6 L/yr - ₹10 L/yr

Senior Engineer
17 salaries
unlock blur

₹4.2 L/yr - ₹8.2 L/yr

Explore more salaries
Compare Ncc Urban Infrastructure with

Patel Infrastructure

3.9
Compare

CTS Consulting & Technical Support

3.7
Compare

J K Fenner

3.9
Compare

Saudi Binladin Group

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview