Upload Button Icon Add office photos

Filter interviews by

Nagarjuna Construction Company Senior Project Manager Interview Questions and Answers for Experienced

Updated 13 Feb 2023

Nagarjuna Construction Company Senior Project Manager Interview Experiences for Experienced

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Feb 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Why we are use lap in centre of column or Zone B?
  • Ans. 

    Lap is used in the center of a column or Zone B for structural stability and reinforcement.

    • Lap joints provide additional strength and stability to the column.

    • They help in distributing the load evenly across the column.

    • Lap joints prevent the column from cracking or failing under heavy loads.

    • Zone B is a critical area where the maximum bending moment occurs, and lap joints help in reinforcing this zone.

    • By using lap in the...

  • Answered by AI
  • Q2. Where are construction joint is provide in simply supported slab?
  • Ans. 

    Construction joints are provided at mid-span of simply supported slabs.

    • Construction joints are provided to allow for differential movement between adjacent sections of the slab.

    • They are typically located at mid-span of the slab, where the bending moment is zero.

    • The joint should be designed to transfer shear and moment between the two sections of the slab.

    • Proper reinforcement detailing is necessary to ensure the joint f...

  • Answered by AI
  • Q3. L/6 or L/ 3 where L is sapan of slab
  • Ans. 

    L/6 or L/3 is the ratio used to determine the maximum allowable deflection of a slab.

    • L/6 is used for residential buildings while L/3 is used for commercial buildings.

    • The ratio determines the maximum amount of deflection that a slab can have without causing damage or discomfort to occupants.

    • For example, if the span of a slab is 12 feet, the maximum allowable deflection for a residential building would be 2 inches (12/6)...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - If you are doing your job with practical experience then no worries about any interview

Interview questions from similar companies

Round 1 - Technical 

(15 Questions)

  • Q1. Two types of pavent 1:- Flexible pavement 2:-rigid pavement Types of progect 1:- New progect 2:- Realigment of road
  • Ans. 

    Flexible pavement and rigid pavement are two types of pavements used in different types of road projects.

    • Flexible pavement is made of multiple layers of materials that can flex under traffic loads.

    • Rigid pavement is made of a single layer of concrete or asphalt that is rigid and does not flex.

    • New projects involve constructing roads from scratch, while realignment projects involve changing the alignment of existing roads...

  • Answered by AI
  • Q2. Constrution process:- surveying, enchrochment ,NGL, OGL
  • Q3. Flexibile road :- 1:- Embankment as per site now taken thickness 3M , Large size of soil particles75mm lumps& cloud , liquid index<50% , plastic limit <25% , Swelling &shrinkage <50% , effective cbr as per...
  • Q4. 3:- confinement layer or new blanket
  • Q5. 4:- WMM:- It is mixture of aggregate and binding material, aggregate size4.75mm to 20mm. Binding material used stone dust ,morum,flyash, total compacted 300mm. Two layer 150mm &150mm. It is mix in pre mix...
  • Q6. (a) Prime coat:- low viscous cut back bitumen on wmm surface area fil up pores and void. (b) Tack coat:- Light application bitumen, ashphalt,emulsion,and dilute water applied on the prim coat.
  • Ans. 

    The question describes the application of prime coat and tack coat on a WMM surface.

    • Prime coat is a low viscous cut back bitumen used to fill up pores and voids on a WMM surface.

    • Tack coat is a light application of bitumen, asphalt, emulsion, or dilute water applied on the prime coat.

    • The purpose of the prime coat is to bond the WMM surface with the subsequent layers of asphalt.

    • The tack coat helps in providing a strong b...

  • Answered by AI
  • Q7. 5 :- DBM:- It is total thickness 150mm. Compacted in two layer 100mm & 50mm Aggregate size 20mm to 28mm ,bitumen viscous grade VG30 grade bitumen mixture.
  • Q8. Tack coat :- light application bitumen ,Asphalt, emulsion,and diluted water on the surface area of DBM.
  • Q9. 6:- BC :- It is total thicness 50 mm compacted. It is mixture of aggregate size 13.1mm bitumen VG30 grade viscous.
  • Q10. 7:- Seal :- 6mm to 8mm thickness grvel or coarse sand mix with bitumen on BC course .provided camber on flexble pavement 1in 40 to 1in 40.
  • Q11. RIGID PAVEMENT :- All the process of embankment to GSB is same. DLC:- Specification 1 :- Aggregate size 26.5 mm 2:-water absorption<2% 3 :- soundness test :- Naso4 12% ...
  • Q12. DESIGIN PROCEDURE :- DLC thickness 150mm. 1:- use M15 grade concrete,max aggregate cement ratio 12:1 2:-The minimum cement content 150kg per cum. If flayash is more than >20% the mini.mum cement content. ...
  • Ans. 

    Design procedure for 150mm DLC thickness using M15 grade concrete with specific requirements for cement content, testing, mixing, transportation, compaction, and curing.

    • Use M15 grade concrete with maximum aggregate cement ratio of 12:1

    • Minimum cement content of 150kg per cum, or 120kg per cum if flyash is more than 20%

    • Perform 5 sample cube test after 7 day curing with strength of 10 MPA, and 1 sample cube test after 7 d...

  • Answered by AI
  • Q13. PQC:- TOTAL THICKNESS 300MM Aggregate size 31.5mm. All specificition is same as DLC.
  • Q14. Design procedure :- 1 :- The minimum cement content 360 kg per cum.if the fly ash is more than 20% the minimum cement content 310 kg per cum. 2 :-The flexure strength of cement concrete after 28 days cur...
  • Ans. 

    Design procedure for Senior Project Manager role including cement content, strength, joint design, and surface finishing.

    • Minimum cement content of 360 kg per cum, or 310 kg per cum if fly ash is more than 20%

    • Flexure strength of cement concrete after 28 days curing is 4.5 MPA

    • Compressive strength of cement concrete after 28 days curing is 40 MPA

    • Dowel bar provided for expansion joint vehicle load transfer between slabs

    • Tie...

  • Answered by AI
  • Q15. CBR:- Developed by calforina division state highway to classiy soil sub grade &GSB CBR=3%-25% CLAY<8% SAND 15% -35% GRAVEL>25% THICKNESS OF PAVEMENT T=( 1.75P/CBR - A/3.14)

Interview Preparation Tips

Interview preparation tips for other job seekers - Other type as per location of the site.
Type of material used in high way.
highway -2 to 4 lane
Expressway- 6 to 8 lane
VUP =5.5 M
LVUP=3.5M
CUP=3M

Senior Project Manager Interview Questions & Answers

Tata Projects user image Shashi kumar S. BE. PMP. Primavera

posted on 8 Jun 2023

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jun 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Project management process
  • Ans. 

    Project management process involves initiating, planning, executing, monitoring, and closing a project.

    • Initiating: Define project scope, objectives, and stakeholders.

    • Planning: Create a detailed project plan, schedule, and budget.

    • Executing: Implement the project plan and manage resources.

    • Monitoring: Track progress, identify issues, and make adjustments.

    • Closing: Finalize project deliverables and evaluate project success.

  • Answered by AI
  • Q2. Design, schedule , cash flow, budget & tendering
Round 3 - Technical 

(2 Questions)

  • Q1. Planning software & its expertise
  • Ans. 

    I have expertise in using various planning software such as Microsoft Project, Asana, and Trello to effectively manage projects.

    • Proficient in creating project plans, assigning tasks, and tracking progress using planning software

    • Skilled in resource allocation, budget management, and timeline scheduling within the software

    • Experience in generating reports, Gantt charts, and project timelines for stakeholders

    • Familiar with ...

  • Answered by AI
  • Q2. Design process - pre-construction sequence

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare for PMP
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before Feb 2024.

Round 1 - Technical 

(1 Question)

  • Q1. Procedure of project start up.
Round 2 - Cost Estimate 

(1 Question)

  • Q1. Preparation of CTC
Round 3 - HR 

(1 Question)

  • Q1. Benefit and pakage
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Feb 2023. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. How to improve profitability
  • Ans. 

    To improve profitability, focus on cost reduction, increasing revenue, and optimizing processes.

    • Identify and eliminate unnecessary expenses

    • Increase sales through marketing strategies or expanding product offerings

    • Streamline operations to reduce waste and improve efficiency

  • Answered by AI

I applied via Referral and was interviewed in May 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Mostly technical related to the job position and expectancy of the organisation.

Interview Preparation Tips

Interview preparation tips for other job seekers - Value proposition to the organisation should be taken care of.
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Aug 2024.

Round 1 - Group Discussion 

Rounds on technical aptitude and on process managemnet.

Round 2 - Case Study 

Case study situatiknal questions etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Revise the technical skills and have a great work discussion be transparent and fare
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. DDUGJY Project;- 33/11 KV New PSS ,33 KV Line ,11 KV Line and LT Line
  • Ans. Rerea of New PSS 60*40 mtr control room 1700 sqft road 60 mtr width 3.75 mtr footpath 15 mtr , fencing 40 mtr cable trench 130 mtr , 2 no 5 MVA PTR, 800Amp VCB and 800 Amp rating isolator in switch yards area. cost of civil work by sub cotractor 1.15 cr and electrical work 9.85 lac.
  • Answered Anonymously
  • Q2. RGGVY 12th Plan , HVDS Project, and Segrigation
  • Q3. ADB Project 33/11 KV New PSS R&M 33&11 KV line LT Line
Round 3 - HR 

(1 Question)

  • Q1. Final negotiation of salary

Interview Preparation Tips

Interview preparation tips for other job seekers - Please consider as per work profile in electrical feild
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
Selected Selected

I applied via Recruitment Consulltant

Round 1 - Assignment 

Project Management , Production Management and HSE

Round 2 - HR 

(1 Question)

  • Q1. Very understanding and initiate. Motivated HR Department
Round 3 - Case Study 

Deeply interested in RR PACKAGE

Round 4 - Group Discussion 

Well. We used to do everyday

Interview Preparation Tips

Interview preparation tips for other job seekers - Thakur Sir, ♥️ has recommended for this job. I did my best to GREPL. If he allows will do more in this regard.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
Selected Selected

I appeared for an interview in Mar 2025, where I was asked the following questions.

  • Q1. How to handle project with team
  • Q2. Electrical residential projects

Nagarjuna Construction Company Interview FAQs

How many rounds are there in Nagarjuna Construction Company Senior Project Manager interview for experienced candidates?
Nagarjuna Construction Company interview process for experienced candidates usually has 2 rounds. The most common rounds in the Nagarjuna Construction Company interview process for experienced candidates are Resume Shortlist and Technical.
What are the top questions asked in Nagarjuna Construction Company Senior Project Manager interview for experienced candidates?

Some of the top questions asked at the Nagarjuna Construction Company Senior Project Manager interview for experienced candidates -

  1. Why we are use lap in centre of column or Zone...read more
  2. Where are construction joint is provide in simply supported sl...read more
  3. L/6 or L/ 3 where L is sapan of s...read more

Tell us how to improve this page.

Nagarjuna Construction Company Senior Project Manager Interview Process for Experienced

based on 1 interview

Interview experience

5
  
Excellent
View more
Nagarjuna Construction Company Senior Project Manager Salary
based on 58 salaries
₹15 L/yr - ₹24 L/yr
29% less than the average Senior Project Manager Salary in India
View more details

Nagarjuna Construction Company Senior Project Manager Reviews and Ratings

based on 19 reviews

4.2/5

Rating in categories

2.7

Skill development

3.4

Work-life balance

3.1

Salary

3.8

Job security

3.8

Company culture

3.0

Promotions

3.5

Work satisfaction

Explore 19 Reviews and Ratings
Junior Engineer
918 salaries
unlock blur

₹1.8 L/yr - ₹6 L/yr

Assistant Engineer
643 salaries
unlock blur

₹2.4 L/yr - ₹8.9 L/yr

Senior Engineer
392 salaries
unlock blur

₹4.3 L/yr - ₹11 L/yr

Junior Engineer Civil
367 salaries
unlock blur

₹2 L/yr - ₹6.5 L/yr

Assistant Engineer - Civil
286 salaries
unlock blur

₹3.3 L/yr - ₹8.9 L/yr

Explore more salaries
Compare Nagarjuna Construction Company with

Larsen & Toubro Limited

3.9
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Kalpataru Projects International

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview