I applied via Walk-in and was interviewed before Mar 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Basic Question related to QS
Round 2 - HR 

(1 Question)

  • Q1. Previous Company and Salary Discussion

Interview Preparation Tips

Topics to prepare for Nagarjuna Construction Company Senior Billing Engineer interview:
  • Basic Civil

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Introduced ur self
  • Q2. Covers of structure different type of element
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Shuttering quantity calculation
  • Ans. 

    Shuttering quantity calculation involves determining the amount of formwork needed for a construction project.

    • Calculate the surface area of the structure that needs formwork

    • Determine the type of formwork material to be used

    • Consider the complexity of the structure and any special requirements

    • Account for wastage and extra material for safety

    • Use standard formulas or software for accurate calculations

  • Answered by AI
  • Q2. Concrete quantity calculation

Interview Preparation Tips

Interview preparation tips for other job seekers - Go to interview with full preparation.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Oct 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Site Engineer 

(5 Questions)

  • Q1. Building construction site
  • Q2. Civil engineering building construction
  • Q3. Building constructions road
  • Q4. Sayan Choudhury
  • Q5. Civil work surveying🛣️

Interview Preparation Tips

Topics to prepare for L&T Construction Civil Site & Billing Engineer interview:
  • Capital Goods
  • Civil Engineering
  • Site Engineering
  • Building Construction
  • Commercial Buildings
Interview preparation tips for other job seekers - Civil engineering

Site Engineer , civil work, Building construction,
site supervisors experience metro project Bumbai Root project Engineer consultancy private limited Company experience building construction site Engineer metro project, site supervisor , and leveling Survey Topic - BS, IS, FS, RL, HI, BM, TBM , value with rise and fall method
Survey
Instruments Name- Auto Leveling
interdisciplinary knowledge.learn practical application of theoretical knowledge on any subject and enables a deep learning experience.
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Client billing , QS

Interview Preparation Tips

Interview preparation tips for other job seekers - Simple
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via Referral and was interviewed before May 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Regarding of subcontractor Billing
Round 1 - Technical 

(2 Questions)

  • Q1. Basically whatever you doing
  • Q2. All about billing & planning

Interview Preparation Tips

Interview preparation tips for other job seekers - Best salary, house rent for both family & bachelor

I applied via Walk-in and was interviewed before Jun 2021. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Prepare BBS sheet , study a drawing and calculate the Quantity Details , about Contractors Billing, preparing Daily and monthly progress report,Study the Drawing and BOQ preparation and raising the materi...

Interview Preparation Tips

Topics to prepare for G R Infraprojects Billing Engineer interview:
  • Billing
Interview preparation tips for other job seekers - Don’t worry.They are Very Friendly. If you don’t know the answer of any questions then tell them. They will give you the answer.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Apr 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Knowledge of BBS, Drawing Reading skills, autocad, and SAP software knowledge, only answer those questions which you answered very well, don't give any forged answer which you don't know.
Round 2 - HR 

(1 Question)

  • Q1. Good in communication (English language is not mandatory) but when ask to answer in then answer in English.
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Sep 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Extra items and substitute items
  • Q2. Earth cutting as per cpwd norms
  • Ans. 

    Earth cutting as per CPWD norms involves following specific guidelines for excavation work.

    • CPWD norms specify the depth and width of excavation for different types of soil

    • The guidelines also include safety measures to be followed during earth cutting

    • Proper disposal of excavated material is also a key aspect of CPWD norms

  • Answered by AI
  • Q3. All kinds of deduction done in measurements
  • Ans. 

    Deductions in measurements include shrinkage, wastage, breakage, and spillage.

    • Shrinkage: Reduction in size or weight of materials during handling or storage.

    • Wastage: Loss of materials during the construction process.

    • Breakage: Damage to materials during transportation or handling.

    • Spillage: Accidental loss of materials due to spills or leaks.

  • Answered by AI

Nagarjuna Construction Company Interview FAQs

How many rounds are there in Nagarjuna Construction Company Senior Billing Engineer interview?
Nagarjuna Construction Company interview process usually has 2 rounds. The most common rounds in the Nagarjuna Construction Company interview process are Technical and HR.

Tell us how to improve this page.

Nagarjuna Construction Company Senior Billing Engineer Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

TCS Interview Questions
3.7
 • 10.4k Interviews
Infosys Interview Questions
3.7
 • 7.6k Interviews
Wipro Interview Questions
3.7
 • 5.6k Interviews
Tech Mahindra Interview Questions
3.5
 • 3.8k Interviews
HCLTech Interview Questions
3.5
 • 3.8k Interviews
L&T Construction Interview Questions
4.0
 • 709 Interviews
Tata Projects Interview Questions
4.2
 • 411 Interviews
KEC International Interview Questions
4.1
 • 287 Interviews
View all
Nagarjuna Construction Company Senior Billing Engineer Salary
based on 4 salaries
₹7.2 L/yr - ₹7.8 L/yr
At par with the average Senior Billing Engineer Salary in India
View more details

Nagarjuna Construction Company Senior Billing Engineer Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

3.0

Skill development

3.0

Work-life balance

5.0

Salary

5.0

Job security

3.0

Company culture

5.0

Promotions

3.0

Work satisfaction

Explore 1 Review and Rating
Junior Engineer
875 salaries
unlock blur

₹1.8 L/yr - ₹6 L/yr

Assistant Engineer
790 salaries
unlock blur

₹3 L/yr - ₹9 L/yr

Junior Engineer Civil
459 salaries
unlock blur

₹1.8 L/yr - ₹6.5 L/yr

Senior Engineer
359 salaries
unlock blur

₹4 L/yr - ₹11 L/yr

Civil Site Engineer
258 salaries
unlock blur

₹1.9 L/yr - ₹6 L/yr

Explore more salaries
Compare Nagarjuna Construction Company with

Larsen & Toubro Limited

4.0
Compare

TCS

3.7
Compare

BHEL

4.1
Compare

Infosys

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview