National Highways & Infrastructure Development Corporation\ Deputy General Manager Project Interview Questions and Answers

Updated 9 Dec 2021

National Highways & Infrastructure Development Corporation\ Deputy General Manager Project Interview Experiences

1 interview found

I applied via Referral and was interviewed in Jun 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Comparison between epc, bot, ham etc, management questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Make ur job a passion. Whatever you study feel it at site. Study your way but be confident what you study is memorised as a practical experience

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jun 2024. There were 3 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. It was evidently good
Round 2 - Aptitude Test 

Duration was 1 hour and test was related to check excel proficiency

Round 3 - One-on-one 

(1 Question)

  • Q1. It was with head of department
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Tell me about yourself
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Group Discussion 

Discuss about experience

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Jun 2023. There were 3 interview rounds.

Round 1 - One-on-one 

(1 Question)

  • Q1. General Technical round
Round 2 - HR 

(1 Question)

  • Q1. HR round and negotiations
Round 3 - One-on-one 

(1 Question)

  • Q1. Final round with founder

I applied via Naukri.com and was interviewed in Aug 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. 1. Cost per sft. 2.steel consumption per sft.3.conc. consumption per sft. 4. All activities per sft , which is required to complete the building.5. how much construction area you had handed in past.6. End ...
  • Ans. 

    Answering questions related to construction projects and past experience.

    • Cost per square foot is dependent on various factors such as location, materials used, and labor costs.

    • Steel consumption per square foot varies depending on the type of structure and design.

    • Concrete consumption per square foot also varies depending on the type of structure and design.

    • All activities required to complete a building per square foot i...

  • Answered by AI
  • Q2. 1. Method of statement for each activity. 2. SOP followed in past. 3. What type of quality process followed.
  • Ans. 

    The interviewee was asked about method of statement, SOP followed in past, and quality process followed.

    • For each activity, a detailed method of statement is prepared to ensure proper execution.

    • Standard Operating Procedures (SOPs) are followed to maintain consistency and efficiency.

    • A quality process is followed to ensure that the work meets the required standards and specifications.

    • Examples of quality processes include ...

  • Answered by AI

I applied via Job Portal and was interviewed before Nov 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Product development

Interview Preparation Tips

Interview preparation tips for other job seekers - Be yourself and play on your strengths
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Dec 2023. There was 1 interview round.

Round 1 - HR 

(3 Questions)

  • Q1. Introduce yourself to the panel
  • Q2. What is your past experience
  • Q3. What are your hobbies
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. Technical brief about last role
  • Ans. 

    Managed technical operations for a team of engineers, overseeing project timelines and deliverables.

    • Led a team of engineers in executing technical projects

    • Monitored project timelines and ensured deliverables were met

    • Collaborated with cross-functional teams to address technical challenges

    • Implemented process improvements to enhance efficiency

  • Answered by AI

Interview Questionnaire 

3 Questions

  • Q1. CRM function and customer satisfaction
  • Q2. Tell me something about yourself and work exp.
  • Q3. In-depth discussion on work exp

Interview Preparation Tips

Interview preparation tips for other job seekers - Have patience since interview process takes 1 month for all 4 rounds

Tell us how to improve this page.

Interview Questions from Similar Companies

GMR Group Interview Questions
4.1
 • 80 Interviews
Ashoka Buildcon Interview Questions
4.0
 • 64 Interviews
M3M India Interview Questions
4.0
 • 47 Interviews
Knight Frank Interview Questions
4.1
 • 44 Interviews
360 Realtors Interview Questions
3.8
 • 35 Interviews
Brigade Group Interview Questions
4.1
 • 32 Interviews
View all
Graduate Engineer
28 salaries
unlock blur

₹5.6 L/yr - ₹9.5 L/yr

Site Engineer
14 salaries
unlock blur

₹7.6 L/yr - ₹10.5 L/yr

Project Manager
9 salaries
unlock blur

₹9 L/yr - ₹15 L/yr

Manager
8 salaries
unlock blur

₹11.5 L/yr - ₹13.2 L/yr

SAP Consultant
8 salaries
unlock blur

₹6 L/yr - ₹6.7 L/yr

Explore more salaries
Compare National Highways & Infrastructure Development Corporation\ with

National Highways Authority of India

4.0
Compare

IRB Infrastructure

4.1
Compare

GMR Group

4.1
Compare

Larsen & Toubro Limited

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview