Upload Button Icon Add office photos

Filter interviews by

National Highways & Infrastructure Development Corporation\ Interview Questions, Process, and Tips

Updated 23 Nov 2024

Top National Highways & Infrastructure Development Corporation\ Interview Questions and Answers

National Highways & Infrastructure Development Corporation\ Interview Experiences

Popular Designations

6 interviews found

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(1 Question)

  • Q1. (1) what is purchase order (2) explain type of GL (3) GST Configuration (4) Release Strategy
  • Ans. 

    Purchase order is a document issued by a buyer to a seller, specifying the type, quantity, and price of products or services to be purchased.

    • Purchase order is a formal request to a vendor to supply goods or services.

    • Types of GL include balance sheet accounts, income statement accounts, and cash flow statement accounts.

    • GST Configuration involves setting up tax codes, tax rates, tax jurisdictions, and tax calculation rul...

  • Answered by AI

Associate SAP Consultant Interview Questions asked at other Companies

Q1. What is the process of software Development life cycle?
View answer (1)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Newspaper Ad and was interviewed before Nov 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What are some projects you have worked on?
  • Ans. 

    I have worked on projects involving designing and implementing renewable energy systems.

    • Designed a solar panel system for a residential building

    • Implemented a wind turbine project for a community center

    • Optimized energy storage solutions for a small business

  • Answered by AI
  • Q2. The names of the IS code in practice for Bridges constrcution
  • Ans. 

    IS codes commonly used in bridge construction include IS 456, IS 3370, IS 800, IS 875, and IS 1893.

    • IS 456: Code of practice for plain and reinforced concrete

    • IS 3370: Code of practice for concrete structures for storage of liquids

    • IS 800: Code of practice for general construction in steel

    • IS 875: Code of practice for design loads for buildings and structures

    • IS 1893: Criteria for earthquake resistant design of structures

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be thorough with your preparation

Graduate Engineer Interview Questions asked at other Companies

Q1. What is Finite Element Analysis? Explain using examples.
View answer (1)

HR Manager Interview Questions & Answers

user image Anonymous

posted on 4 Dec 2022

I applied via Newspaper Ad and was interviewed in Jun 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Aptitude Test 

It was a computer based test where I have to appear multiple type questions.

Round 3 - Technical 

(1 Question)

  • Q1. Questions related to behavioural aspects asked more. How you have handled one tough situation, give example and what was the challenge.
Round 4 - HR 

(1 Question)

  • Q1. Questions about my qualifications, previous experience and about Job profile was asked more. What responsibility you took in your previous organisation and what would you implement in your new organisation...

Interview Preparation Tips

Interview preparation tips for other job seekers - Pl be confident while appearing any such interview.

HR Manager Interview Questions asked at other Companies

Q1. Can you explain the meaning of performance Management as stated in your CV
View answer (5)

I applied via AmbitionBox and was interviewed in Jun 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Mix design of M20 concrete
  • Ans. 

    Mix design of M20 concrete involves determining the proportions of cement, sand, and aggregate to achieve the desired strength and workability.

    • M20 concrete is a commonly used grade of concrete for various construction applications.

    • The mix design of M20 concrete typically follows the 1:1.5:3 ratio of cement, sand, and aggregate by volume.

    • The water-cement ratio is an important factor in the mix design, affecting the stre...

  • Answered by AI
  • Q2. Unit weight of steel?
  • Ans. 

    The unit weight of steel varies depending on the type and grade of steel.

    • The unit weight of steel is typically measured in pounds per cubic foot or kilograms per cubic meter.

    • The unit weight of common structural steel ranges from 490 to 785 pounds per cubic foot (7850 to 12560 kilograms per cubic meter).

    • Different types of steel, such as stainless steel or high-strength steel, may have different unit weights.

    • The unit wei...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical knowledge is important and site management is getting from site work exicution experience

Senior Highway Engineer Interview Questions asked at other Companies

Q1. DESISGN PROCEDURE:- 1;- use. M40 GRADE CONCRETE 2:-Minimum cement content 360kg percum If fly ash is more than 20% the minimum cement contents 310kg percum. 3:- The flexuar strength cement concete after 28day 4.5 MPA. 4:-The compressive str... read more
View answer (1)

National Highways & Infrastructure Development Corporation\ interview questions for popular designations

 Associate SAP Consultant

 (1)

 Finance Manager

 (1)

 Graduate Engineer

 (1)

 HR Manager

 (1)

 Senior Highway Engineer

 (1)

 Deputy General Manager Project

 (1)

I applied via Referral and was interviewed in Jun 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Comparison between epc, bot, ham etc, management questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Make ur job a passion. Whatever you study feel it at site. Study your way but be confident what you study is memorised as a practical experience

Deputy General Manager Project Interview Questions asked at other Companies

Q1. Consumption of bricks per cubic menter of masonry wall ?
View answer (3)

Finance Manager Interview Questions & Answers

user image Sunil Kumar Haloi

posted on 17 Oct 2021

I applied via Company Website and was interviewed in Apr 2021. There was 1 interview round.

Interview Questionnaire 

2 Questions

  • Q1. The questions were about past services, in which field I worked etc.
  • Q2. My e periences in ERP platform etc.

Interview Preparation Tips

Interview preparation tips for other job seekers - The I terview was amazing for me. It was on google meet conference.

Finance Manager Interview Questions asked at other Companies

Q1. What are the major adjustments need to be done while finalization of Accounts ?
View answer (2)

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - HR 

(1 Question)

  • Q1. What kind of experience you have
Interview experience
1
Bad
Difficulty level
Easy
Process Duration
2-4 weeks
Result
No response

I appeared for an interview in Feb 2025.

Round 1 - HR 

(1 Question)

  • Q1. How much sales you did
  • Ans. 

    In my previous role, I consistently exceeded sales targets, achieving over $1 million in revenue annually through strategic client engagement.

    • Achieved 120% of my sales target in 2022, generating $1.2 million in revenue.

    • Developed strong relationships with key clients, resulting in a 30% increase in repeat business.

    • Implemented a new CRM system that improved lead tracking and conversion rates by 25%.

    • Conducted market resea...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Don’t go for interview they don’t reply after interview
They make you wait for 1-2 hour
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. About your self
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Oct 2023. There were 3 interview rounds.

Round 1 - Aptitude Test 

About Aptitude, communication, Finace and Excel

Round 2 - Case Study 

It is like a essay writing round

Round 3 - One-on-one 

(1 Question)

  • Q1. About basics of accounting and finance

National Highways & Infrastructure Development Corporation\ Interview FAQs

How many rounds are there in National Highways & Infrastructure Development Corporation\ interview?
National Highways & Infrastructure Development Corporation\ interview process usually has 2 rounds. The most common rounds in the National Highways & Infrastructure Development Corporation\ interview process are Technical, Resume Shortlist and HR.
How to prepare for National Highways & Infrastructure Development Corporation\ interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at National Highways & Infrastructure Development Corporation\. The most common topics and skills that interviewers at National Highways & Infrastructure Development Corporation\ expect are Civil, Electrical Engineering, Electrical Maintenance and Site Engineering.
What are the top questions asked in National Highways & Infrastructure Development Corporation\ interview?

Some of the top questions asked at the National Highways & Infrastructure Development Corporation\ interview -

  1. (1) what is purchase order (2) explain type of GL (3) GST Configuration (4) Rel...read more
  2. The names of the IS code in practice for Bridges constrcut...read more
  3. Unit weight of ste...read more

Tell us how to improve this page.

National Highways & Infrastructure Development Corporation\ Interview Process

based on 4 interviews

Interview experience

4.3
  
Good
View more

Interview Questions from Similar Companies

InvestoXpert Interview Questions
4.1
 • 63 Interviews
M3M India Interview Questions
4.1
 • 48 Interviews
Knight Frank Interview Questions
4.0
 • 44 Interviews
360 Realtors Interview Questions
3.8
 • 35 Interviews
VTP Realty Interview Questions
3.7
 • 34 Interviews
Brigade Group Interview Questions
4.1
 • 34 Interviews
Smartworks Interview Questions
3.6
 • 33 Interviews
Aliens Group Interview Questions
3.2
 • 30 Interviews
View all

National Highways & Infrastructure Development Corporation\ Reviews and Ratings

based on 55 reviews

3.6/5

Rating in categories

3.4

Skill development

3.0

Work-life balance

3.5

Salary

2.7

Job security

2.9

Company culture

2.5

Promotions

3.1

Work satisfaction

Explore 55 Reviews and Ratings
Graduate Engineer
38 salaries
unlock blur

₹5.5 L/yr - ₹9.5 L/yr

Site Engineer
14 salaries
unlock blur

₹7.6 L/yr - ₹10.5 L/yr

Project Manager
9 salaries
unlock blur

₹9 L/yr - ₹15 L/yr

Manager
8 salaries
unlock blur

₹11.5 L/yr - ₹13.2 L/yr

Data Entry Operator
8 salaries
unlock blur

₹3.4 L/yr - ₹5.4 L/yr

Explore more salaries
Compare National Highways & Infrastructure Development Corporation\ with

Knight Frank

4.0
Compare

M3M India

4.1
Compare

Brigade Group

4.1
Compare

Emaar India Limited

3.6
Compare
Did you find this page helpful?
Yes No
write
Share an Interview