i
Mungi
Group
Filter interviews by
Wrinkles in metal forming can be caused by various factors such as improper die design, material properties, or process parameters.
Wrinkles can occur due to insufficient material flow in the die cavity.
Improper die clearance can lead to wrinkles as the material is not able to flow properly.
Material properties such as thickness, strength, and ductility can also affect the formation of wrinkles.
Process parameters li...
CO2 welding, also known as Gas Metal Arc Welding (GMAW), is a type of welding process that uses a continuous solid wire electrode and a shielding gas to protect the weld pool from atmospheric contamination.
CO2 welding is cost-effective and produces high-quality welds.
It is versatile and can be used on a variety of metals, including steel, stainless steel, and aluminum.
The process is relatively easy to learn and ca...
Production is the process of creating goods or services using resources such as labor, machinery, and materials.
Production involves converting raw materials into finished products
It includes activities such as manufacturing, assembling, and packaging
Efficient production processes can lead to cost savings and increased output
SCAP stands for Security Content Automation Protocol, a standard for automating vulnerability management.
SCAP is a collection of open standards used to automate the process of vulnerability management.
It includes a standardized language for expressing security-related information, such as vulnerability and patch information.
SCAP also includes tools for automating vulnerability scanning, configuration checking, and...
Cushion above base is the distance between the top of the die and the bottom of the slide at bottom dead center.
It is an important parameter in press shop operations.
It affects the quality of the stamped parts.
It is measured in millimeters or inches.
It can be adjusted by changing the die height or the slide adjustment.
A larger cushion above base can help prevent wrinkling or tearing of the material being stamped.
I control and manage by setting clear goals, delegating tasks, and regularly communicating with my team.
Set clear goals and expectations for the team
Delegate tasks based on team members' strengths and abilities
Regularly communicate with the team to ensure everyone is on the same page
Provide feedback and recognition to motivate and improve performance
Monitor progress and adjust plans as needed
5S is a workplace organization method that aims to improve efficiency and productivity by eliminating waste and optimizing processes.
5S stands for Sort, Set in Order, Shine, Standardize, and Sustain.
Sort involves removing unnecessary items from the workplace.
Set in Order involves organizing the remaining items in a logical and efficient manner.
Shine involves cleaning and maintaining the workplace.
Standardize invol...
PPAP stands for Production Part Approval Process.
PPAP is a standardized process used in the automotive industry to ensure that suppliers meet the requirements for production parts.
It involves a series of documentation and approval steps to demonstrate that the supplier's manufacturing process is capable of consistently producing parts that meet the customer's specifications.
PPAP includes elements such as design re...
HR stands for Human Resources. It is the department responsible for managing the employees of an organization.
HR is responsible for recruitment, training, and development of employees.
They also handle employee relations, payroll, and benefits administration.
HR ensures compliance with labor laws and regulations.
Examples of HR roles include HR Manager, HR Generalist, and HR Assistant.
Yes, PF and ESIC are social security schemes in India for employees.
PF stands for Provident Fund and is a retirement benefit scheme for employees in India.
ESIC stands for Employees' State Insurance Corporation and provides medical and cash benefits to employees and their families.
Both schemes are mandatory for employees in certain industries and have specific contribution rates.
Employers are responsible for deduct...
I appeared for an interview in Aug 2024.
English, maths and puzzles basic preparation.
Question
Add four work before work,guard to make meaningful word
I applied via Campus Placement
I am a motivated student with a passion for technology and a strong desire to learn and grow in a dynamic work environment.
Currently pursuing a degree in Computer Science, where I have developed skills in programming languages like Python and Java.
Completed an internship at XYZ Company, where I contributed to a team project that improved the efficiency of data processing by 20%.
Active member of the university coding cl...
I can enhance Mungi Group's quality assurance processes through expertise, innovation, and collaboration.
Implement automated testing frameworks to increase efficiency and reduce manual errors, as seen in my previous role at XYZ Corp.
Develop and enforce quality standards and best practices, ensuring compliance with industry regulations, similar to my work with ISO 9001.
Collaborate with cross-functional teams to identify...
I applied via Campus Placement and was interviewed before Sep 2023. There were 2 interview rounds.
Test the knowledge of engineering
Production is the process of creating goods or services using resources such as labor, machinery, and materials.
Production involves converting raw materials into finished products
It includes activities such as manufacturing, assembling, and packaging
Efficient production processes can lead to cost savings and increased output
I applied via Naukri.com and was interviewed in Jan 2023. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Jan 2023. There were 2 interview rounds.
I applied via Campus Placement and was interviewed before Oct 2023. There was 1 interview round.
CO2 welding, also known as Gas Metal Arc Welding (GMAW), is a type of welding process that uses a continuous solid wire electrode and a shielding gas to protect the weld pool from atmospheric contamination.
CO2 welding is cost-effective and produces high-quality welds.
It is versatile and can be used on a variety of metals, including steel, stainless steel, and aluminum.
The process is relatively easy to learn and can be ...
I am a dedicated and experienced Shift Engineer Production with a strong background in overseeing manufacturing processes and ensuring efficiency.
Overseeing production processes to ensure efficiency and quality
Troubleshooting equipment issues and coordinating maintenance
Implementing process improvements to increase productivity
Training and supervising production staff
Ensuring compliance with safety regulations and qual...
I applied via Indeed and was interviewed in Apr 2023. There were 3 interview rounds.
To Execute the CMM as par the plan schedule
To make the CMM of parts , Assy & fixtures whenever required
To prepare Indent & Advice in ERP system
To Execute the preventive maintenance of CMM machine as par frequency
To Execute the internal calibration of CMM machine
To identify & Execute the CI Projects
To do the CMM Report analysis & CMM data interpretation
What is your experience with project management
I applied via Referral and was interviewed in Jan 2023. There were 3 interview rounds.
Top trending discussions
The duration of Mungi Group interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 32 interview experiences
Difficulty level
Duration
based on 365 reviews
Rating in categories
Production Engineer
91
salaries
| ₹2.2 L/yr - ₹6.1 L/yr |
Quality Engineer
54
salaries
| ₹2.3 L/yr - ₹5.8 L/yr |
Shift Engineer
45
salaries
| ₹2.8 L/yr - ₹5.5 L/yr |
Quality Inspector
33
salaries
| ₹1.5 L/yr - ₹3.6 L/yr |
Senior Executive
32
salaries
| ₹3.8 L/yr - ₹7.4 L/yr |
Knorr-Bremse
Sanden Vikas
Victora Auto Private Limited
India Japan Lighting