i
Mungi Group
Filter interviews by
I applied via Walk-in and was interviewed in Aug 2021. There were 2 interview rounds.
PPAP stands for Production Part Approval Process.
PPAP is a standardized process used in the automotive industry to ensure that suppliers meet the requirements for production parts.
It involves a series of documentation and approval steps to demonstrate that the supplier's manufacturing process is capable of consistently producing parts that meet the customer's specifications.
PPAP includes elements such as design records...
5S is a workplace organization method that aims to improve efficiency and productivity by eliminating waste and optimizing processes.
5S stands for Sort, Set in Order, Shine, Standardize, and Sustain.
Sort involves removing unnecessary items from the workplace.
Set in Order involves organizing the remaining items in a logical and efficient manner.
Shine involves cleaning and maintaining the workplace.
Standardize involves c...
Calibration instrument is a process of removing errors between instruments and providing NABL certificate.
Calibration is the process of adjusting an instrument to provide accurate results.
It involves comparing the readings of the instrument with a known standard.
The errors are then removed by adjusting the instrument accordingly.
NABL (National Accreditation Board for Testing and Calibration Laboratories) certificate is...
I applied via Walk-in and was interviewed in Sep 2021. There was 1 interview round.
I applied via LinkedIn and was interviewed before Aug 2021. There were 2 interview rounds.
Star and delta connections are two types of three-phase circuits used in electrical engineering.
Star connection has a neutral point and three phases are connected to it, while in delta connection, three phases are connected in a closed loop.
Star connection is used for low voltage applications, while delta connection is used for high voltage applications.
Star connection provides better safety and flexibility, while delt...
posted on 17 Jan 2022
I applied via Referral and was interviewed before Jan 2021. There was 1 interview round.
My B Tech project was on developing a quality control system for a manufacturing company.
Developed a software application to monitor and analyze production data in real-time.
Implemented statistical process control techniques to identify and address quality issues.
Designed and conducted experiments to optimize manufacturing processes and improve product quality.
Collaborated with cross-functional teams to implement quali...
I applied via Naukri.com and was interviewed before Mar 2023. There were 3 interview rounds.
Name, which area belong, married or not, how many child
Family status, means working before and after,how many persons doing job or not
7 Qc tool like Histogram,Pareto, Scattered diagram etc.what is SPC,
I applied via Recruitment Consulltant and was interviewed in Jul 2024. There was 1 interview round.
I appeared for an interview before Feb 2023.
Basic logical question
Reasoning ability question
Positioning tolerance refers to the allowable deviation from the desired position of an object or component.
Positioning tolerance is a measure of how much an object or component can deviate from its intended position without affecting its functionality.
It is typically specified in terms of a maximum allowable distance or angle.
For example, in manufacturing, positioning tolerance is used to ensure that parts fit togethe...
I applied via Approached by Company and was interviewed before Apr 2023. There was 1 interview round.
posted on 4 May 2024
posted on 7 Dec 2022
based on 5 reviews
Rating in categories
Production Engineer
85
salaries
| ₹2 L/yr - ₹6.3 L/yr |
Shift Engineer
54
salaries
| ₹2.5 L/yr - ₹6.7 L/yr |
Quality Engineer
49
salaries
| ₹1.8 L/yr - ₹5.8 L/yr |
Quality Inspector
34
salaries
| ₹1 L/yr - ₹3.5 L/yr |
HR Executive
28
salaries
| ₹1.5 L/yr - ₹5.5 L/yr |
Knorr-Bremse
Sanden Vikas
Victora Auto Private Limited
India Japan Lighting