Filter interviews by
I applied via Approached by Company and was interviewed before Apr 2023. There was 1 interview round.
Top trending discussions
I applied via Recruitment Consultant and was interviewed before Jan 2021. There was 1 interview round.
There are 5 levels in PPAP (Production Part Approval Process).
PPAP has 5 levels: Level 1, Level 2, Level 3, Level 4, and Level 5.
Each level represents a different stage of the PPAP process.
Level 1 includes documentation submission, while Level 5 involves customer approval.
The higher the level, the more comprehensive the PPAP requirements become.
PPAP is used to ensure that suppliers meet the quality standards of their c
Cp measures the capability of a process to meet specifications, while Cpk measures the capability of a process to meet specifications considering centering.
Cp is a short-term capability index, while Cpk is a long-term capability index.
Cp considers only the spread of the process, while Cpk considers both the spread and the centering of the process.
Cp is calculated using the formula Cp = (USL - LSL) / (6 * standard devia...
CAPA stands for Corrective and Preventive Action. It is a systematic approach to identify, investigate, and resolve quality issues.
CAPA is a key component of quality management systems.
It involves identifying the root cause of a problem, implementing corrective actions to address the immediate issue, and preventive actions to prevent recurrence.
CAPA processes typically include steps like problem identification, investi...
I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Sep 2020. There were 3 interview rounds.
The company production refers to the manufacturing and output of products or services by the company.
Company production refers to the quantity and quality of goods or services produced.
It includes the manufacturing process, assembly, packaging, and delivery of products.
Production can also involve the provision of services, such as software development or consulting.
The company's production may vary depending on factors...
Shock absorbers are devices used in vehicles to absorb and dampen the impact of bumps and vibrations.
Absorb and dampen the impact of bumps and vibrations
Improve vehicle stability and control
Enhance driver and passenger comfort
Reduce wear and tear on other vehicle components
Maintain tire contact with the road surface
Prevent excessive bouncing and bouncing
Provide consistent handling and braking
Examples: coilover shocks,
I applied via Recruitment Consulltant and was interviewed in Nov 2022. There were 6 interview rounds.
Introduction and few case study intraction with MD sir
I applied via Recruitment Consulltant and was interviewed in Apr 2023. There were 3 interview rounds.
To reduce the rating of FMEA, focus on improving the severity, occurrence, and detection ratings. Cp and CPK are used to measure process capability.
To reduce FMEA rating, address high severity issues first
Implement controls to reduce the likelihood of high occurrence failure modes
Enhance detection methods to catch potential issues early
Calculate Cp and CPK to assess process capability and make improvements as needed
based on 1 interview
Interview experience
based on 6 reviews
Rating in categories
Design Engineer
280
salaries
| ₹2.5 L/yr - ₹11 L/yr |
Senior Design Engineer
223
salaries
| ₹5 L/yr - ₹11.4 L/yr |
Product Engineer
179
salaries
| ₹7.3 L/yr - ₹16.5 L/yr |
Assistant Engineering Manager
53
salaries
| ₹12 L/yr - ₹21.5 L/yr |
CAE Engineer
52
salaries
| ₹6 L/yr - ₹11.5 L/yr |
Bosch
Yazaki
Faurecia
Hitachi Astemo