Filter interviews by
I applied via Approached by Company and was interviewed before Apr 2023. There was 1 interview round.
Top trending discussions
I applied via Walk-in and was interviewed before Sep 2020. There was 1 interview round.
Yes, I am fit for the post of Quality Engineer.
I have a strong background in quality engineering with experience in implementing quality control processes.
I am skilled in conducting quality audits and inspections to identify areas for improvement.
I have expertise in using quality tools and methodologies such as Six Sigma and Lean principles.
I have successfully led cross-functional teams to resolve quality issues and im...
I am a detail-oriented Quality Engineer with a strong background in ensuring product quality and process improvement.
Experienced in conducting quality audits and inspections
Proficient in using statistical analysis tools to identify and resolve quality issues
Skilled in developing and implementing quality control procedures
Strong problem-solving and analytical skills
Excellent communication and teamwork abilities
I tend to procrastinate and sometimes struggle with time management.
Procrastination
Time management
Difficulty prioritizing tasks
Occasional lack of focus
posted on 5 Dec 2021
I applied via Referral and was interviewed before Dec 2020. There was 1 interview round.
Quality is a crucial aspect of any product or service in the present times.
Quality is a key factor in customer satisfaction and loyalty.
Quality control measures ensure that products meet the required standards.
Quality assurance processes help in identifying and addressing potential issues before they become major problems.
Quality management systems like Six Sigma and Lean help in improving overall quality and efficienc...
posted on 9 Oct 2021
I applied via Recruitment Consultant and was interviewed before Oct 2020. There was 1 interview round.
Seven QC tools are a set of basic quality control tools used to identify and solve quality problems.
Check sheets
Control charts
Histograms
Pareto charts
Scatter diagrams
Stratification
Cause-and-effect diagrams
posted on 23 Oct 2021
I applied via Recruitment Consultant and was interviewed before Oct 2020. There were 3 interview rounds.
I have a valid driver's license for both cars and motorcycles.
I have a Class C license for cars
I also have a Class M license for motorcycles
I have a clean driving record with no accidents or violations
I ride a road bike for commuting and a mountain bike for leisure.
I prefer road bikes for their speed and efficiency on paved roads.
I enjoy mountain biking for the challenge and adventure of off-road trails.
I also have experience with hybrid bikes for their versatility.
I prioritize safety and always wear a helmet and follow traffic laws.
I have participated in charity rides and group rides for fun and community.
Vehicle testing involves various methods to ensure safety, performance, and compliance with regulations.
Testing can include physical tests such as crash tests, durability tests, and performance tests.
Simulation and modeling can also be used to test vehicle components and systems.
Testing must comply with regulations set by organizations such as the National Highway Traffic Safety Administration (NHTSA) and the European
We conduct various types of homologation testing depending on the product and its intended market.
We conduct safety testing to ensure compliance with local regulations.
We perform emissions testing to ensure compliance with environmental regulations.
We conduct performance testing to ensure the product meets the required standards.
We also conduct durability testing to ensure the product can withstand the expected wear an...
I applied via Recruitment Consultant and was interviewed before Jan 2021. There was 1 interview round.
There are 5 levels in PPAP (Production Part Approval Process).
PPAP has 5 levels: Level 1, Level 2, Level 3, Level 4, and Level 5.
Each level represents a different stage of the PPAP process.
Level 1 includes documentation submission, while Level 5 involves customer approval.
The higher the level, the more comprehensive the PPAP requirements become.
PPAP is used to ensure that suppliers meet the quality standards of their c
Cp measures the capability of a process to meet specifications, while Cpk measures the capability of a process to meet specifications considering centering.
Cp is a short-term capability index, while Cpk is a long-term capability index.
Cp considers only the spread of the process, while Cpk considers both the spread and the centering of the process.
Cp is calculated using the formula Cp = (USL - LSL) / (6 * standard devia...
CAPA stands for Corrective and Preventive Action. It is a systematic approach to identify, investigate, and resolve quality issues.
CAPA is a key component of quality management systems.
It involves identifying the root cause of a problem, implementing corrective actions to address the immediate issue, and preventive actions to prevent recurrence.
CAPA processes typically include steps like problem identification, investi...
I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.
posted on 19 May 2021
I applied via Naukri.com and was interviewed in Nov 2020. There were 4 interview rounds.
posted on 19 Jan 2021
I was interviewed in Jul 2020.
I have achieved several milestones throughout my career as a Senior Engineer.
Successfully led a team of engineers to develop and implement a new software system, resulting in a 20% increase in efficiency.
Received recognition for designing and implementing a cost-effective solution that reduced production downtime by 30%.
Contributed to the development of a groundbreaking technology that revolutionized the industry, lead...
based on 1 interview
Interview experience
based on 6 reviews
Rating in categories
Design Engineer
280
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Design Engineer
225
salaries
| ₹0 L/yr - ₹0 L/yr |
Product Engineer
183
salaries
| ₹0 L/yr - ₹0 L/yr |
CAE Engineer
53
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Engineering Manager
52
salaries
| ₹0 L/yr - ₹0 L/yr |
Faurecia
Lear Corporation
Magna International
Bharat Forge