i
Filter interviews by
I was interviewed in Feb 2025.
PNP and NPN sensors are used in industrial automation to detect the presence or absence of objects.
PNP sensors source current and NPN sensors sink current
PNP sensors are connected to positive voltage while NPN sensors are connected to ground
PNP sensors are typically used in sourcing applications while NPN sensors are used in sinking applications
DG electricity can be generated using a diesel generator set.
Diesel generator sets use a diesel engine to generate electricity
Fuel is burned in the engine to produce mechanical energy
The mechanical energy is then converted into electrical energy using an alternator
Regular maintenance and fuel supply are essential for continuous operation
Examples of diesel generator brands include Caterpillar, Cummins, and Generac
Control diagrams for star delta starter and reverse forward starter.
Star delta starter: used for starting induction motors, reduces starting current by first connecting the motor in star configuration and then switching to delta configuration.
Reverse forward starter: used for reversing the direction of rotation of a motor, achieved by changing the phase sequence of the motor windings.
Control diagrams typically include ...
I applied via Walk-in and was interviewed in Nov 2024. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed in Aug 2023. There was 1 interview round.
The 7 quality control tools are essential for identifying and solving quality-related issues in various industries.
Check sheets: Used to collect and analyze data for quality control purposes.
Control charts: Monitor process performance and identify variations.
Histograms: Visualize data distribution and identify patterns.
Pareto charts: Prioritize problems by their frequency or impact.
Cause-and-effect diagrams: Identify a...
5s is a quality control methodology that focuses on organizing and standardizing the workplace.
5s stands for Sort, Set in Order, Shine, Standardize, and Sustain.
It aims to improve efficiency, productivity, and safety by eliminating waste and creating a clean and organized work environment.
Example: In a manufacturing plant, implementing 5s can involve sorting and removing unnecessary items, organizing tools and equipmen...
The 6 sigma rule is a statistical concept that aims to reduce defects and improve quality in processes.
6 sigma is a methodology used to measure and improve process performance.
It focuses on reducing variation and defects in a process to achieve near-perfect quality.
The goal of 6 sigma is to have only 3.4 defects per million opportunities.
It uses statistical tools and techniques to identify and eliminate sources of vari...
International Automotive Components interview questions for popular designations
I applied via Recruitment Consulltant and was interviewed in Feb 2024. There was 1 interview round.
Get interview-ready with Top International Automotive Components Interview Questions
I have 5 years of experience working as an accountant in a medium-sized company.
Managed financial records and prepared financial statements
Performed budget analysis and forecasting
Handled accounts payable and accounts receivable
Assisted with audits and tax preparation
Utilized accounting software such as QuickBooks
I applied via Company Website and was interviewed in Aug 2023. There were 2 interview rounds.
I am interested in production department
I am hardworking .....
I am smart working .....
I applied via Campus Placement and was interviewed before Mar 2023. There were 2 interview rounds.
In this round we are discussing about injection molding and extrusion die molding
I applied via Naukri.com and was interviewed before Aug 2023. There was 1 interview round.
I have worked on designing a solar-powered irrigation system for a rural community.
Researched solar panel efficiency and irrigation system requirements
Designed a system to efficiently pump water using solar energy
Implemented sensors for monitoring water levels and irrigation needs
Collaborated with local community for installation and testing
Challenges faced include tight deadlines, complex design requirements, and communication issues.
Tight deadlines for project completion
Complex design requirements that required innovative solutions
Communication issues with team members or clients
Balancing multiple projects simultaneously
I learned new design software, improved communication skills, and gained knowledge in project management.
Learned how to use SolidWorks for 3D modeling
Enhanced communication skills through regular team meetings and client interactions
Acquired project management skills by leading a team in completing a design project
Top trending discussions
The duration of International Automotive Components interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 19 interviews
Interview experience
based on 301 reviews
Rating in categories
Design Engineer
140
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
71
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Design Engineer
57
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
53
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Inspector
49
salaries
| ₹0 L/yr - ₹0 L/yr |
Samvardhana Motherson Group
Bharat Forge
Varroc Group
Sundaram Clayton