i
Mungi Group
Filter interviews by
I applied via campus placement at K K Wagh College of Engineering, Nashik and was interviewed before Oct 2023. There was 1 interview round.
CO2 welding, also known as Gas Metal Arc Welding (GMAW), is a type of welding process that uses a continuous solid wire electrode and a shielding gas to protect the weld pool from atmospheric contamination.
CO2 welding is cost-effective and produces high-quality welds.
It is versatile and can be used on a variety of metals, including steel, stainless steel, and aluminum.
The process is relatively easy to learn and can be ...
I am a dedicated and experienced Shift Engineer Production with a strong background in overseeing manufacturing processes and ensuring efficiency.
Overseeing production processes to ensure efficiency and quality
Troubleshooting equipment issues and coordinating maintenance
Implementing process improvements to increase productivity
Training and supervising production staff
Ensuring compliance with safety regulations and qual
Top trending discussions
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Production Engineer
84
salaries
| ₹1.8 L/yr - ₹6.1 L/yr |
Shift Engineer
54
salaries
| ₹2.5 L/yr - ₹6.7 L/yr |
Quality Engineer
50
salaries
| ₹1.8 L/yr - ₹5.8 L/yr |
Quality Inspector
34
salaries
| ₹1 L/yr - ₹3.5 L/yr |
HR Executive
27
salaries
| ₹1.5 L/yr - ₹5.5 L/yr |
Reliance Industries
Tata Group
Adani Group
Mahindra & Mahindra