Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Mungi Group Team. If you also belong to the team, you can get access from here

Mungi Group Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Mungi Group CMM Inspector Interview Questions and Answers

Updated 17 May 2023

Mungi Group CMM Inspector Interview Experiences

1 interview found

CMM Inspector Interview Questions & Answers

user image Anonymous

posted on 17 May 2023

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
No response

I applied via Indeed and was interviewed in Apr 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Group Discussion 

To Execute the CMM as par the plan schedule
To make the CMM of parts , Assy & fixtures whenever required
To prepare Indent & Advice in ERP system
To Execute the preventive maintenance of CMM machine as par frequency
To Execute the internal calibration of CMM machine
To identify & Execute the CI Projects
To do the CMM Report analysis & CMM data interpretation

Round 3 - Coding Test 

What is your experience with project management

Interview Preparation Tips

Interview preparation tips for other job seekers - Nokri.com

Interview questions from similar companies

I applied via LinkedIn and was interviewed before Aug 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. What is different between star and delta connection?
  • Ans. 

    Star and delta connections are two types of three-phase circuits used in electrical engineering.

    • Star connection has a neutral point and three phases are connected to it, while in delta connection, three phases are connected in a closed loop.

    • Star connection is used for low voltage applications, while delta connection is used for high voltage applications.

    • Star connection provides better safety and flexibility, while delt...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Please first make sure what is your previous job profile and explain

I applied via Referral and was interviewed before Oct 2020. There was 1 interview round.

Interview Questionnaire 

7 Questions

  • Q1. Casting realated
  • Q2. Casting diffect
  • Q3. Casting tumprature
  • Q4. Self introduction
  • Q5. Family realated
  • Q6. Education realated
  • Q7. Any thing questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Good noulage best company bawal Minda group
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Mar 2024. There were 3 interview rounds.

Round 1 - Group Discussion 

Questions on JD and education

Round 2 - HR 

(1 Question)

  • Q1. Questions on educational qualifications
  • Ans. JD on assiciate to handle patent applications
  • Answered Anonymously
Round 3 - Technical 

(1 Question)

  • Q1. Questions on btech like functioning of braking system

I applied via Approached by Company and was interviewed before Feb 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(5 Questions)

  • Q1. Share details of your previous job.
  • Q2. Why should we hire you?
  • Q3. Where do you see yourself in 5 years?
  • Q4. Tell me about yourshelf
  • Ans. Sir myself rahul singh I leave in pilibhit up I am married
  • Answered Anonymously
  • Q5. No another question hr sir

Interview Preparation Tips

Interview preparation tips for other job seekers - Nice interesting interview and succes

I applied via Campus Placement and was interviewed before Aug 2021. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Question were asked related to engineering base like from TOM,SOM, THERMODYNAMICS etc
  • Q2. About project did in collage

Interview Preparation Tips

Interview preparation tips for other job seekers - Clear you basics as they asked the basic questions

I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Quality tools
  • Q2. 7 qc tools , why why analysis
  • Ans. 

    The 7 QC tools are used for quality control and the Why Why analysis is used to identify the root cause of a problem.

    • The 7 QC tools include Pareto chart, cause-and-effect diagram, control chart, histogram, scatter diagram, flowchart, and check sheet.

    • Why Why analysis involves asking 'why' multiple times to identify the underlying cause of a problem.

    • It helps in identifying the root cause of a problem and taking correctiv...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Done your homework before interview
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Feb 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Basic questions 7qc tools,core tools.
  • Q2. QMS- IATF16949 system related. Problem solving -8D,RCA

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare what you mentioned in your resume. Proactive approach for position which you are applying.
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Oct 2023. There were 3 interview rounds.

Round 1 - Aptitude Test 

Question will be coming from Math, reasoning and English.

Round 2 - Group Discussion 

Topic always current affairs.

Round 3 - Technical 

(5 Questions)

  • Q1. General Procurement process of any material?
  • Ans. 

    General procurement process involves identifying needs, selecting suppliers, negotiating terms, and managing contracts.

    • Identify the need for the material

    • Research potential suppliers

    • Request for quotations or proposals

    • Negotiate terms and pricing

    • Select the supplier

    • Create a purchase order

    • Receive and inspect the material

    • Pay the supplier

  • Answered by AI
  • Q2. What is zero based costing.
  • Ans. 

    Zero based costing is a method of budgeting where all expenses must be justified for each new period.

    • In zero based costing, all expenses start from zero and must be justified for each new period.

    • It requires managers to analyze and justify all expenses, rather than just making incremental changes to the previous budget.

    • This method can help identify inefficiencies and unnecessary expenses in the budget.

    • Example: A company...

  • Answered by AI
  • Q3. What is vlookup and X Lookup And Differentiate also?
  • Ans. 

    VLOOKUP and XLOOKUP are Excel functions used to search for a value in a table and return a corresponding value.

    • VLOOKUP stands for 'Vertical Lookup' and searches for a value in the first column of a table and returns a value in the same row from a specified column.

    • XLOOKUP is a newer function that can search both vertically and horizontally in a table and has more flexibility in its syntax.

    • VLOOKUP requires the lookup val...

  • Answered by AI
  • Q4. How we can create a pivot table in MS Excel?
  • Ans. 

    To create a pivot table in MS Excel, go to the 'Insert' tab, click on 'PivotTable', select the data range, choose where to place the pivot table, and drag fields into the rows, columns, and values areas.

    • Go to the 'Insert' tab in Excel.

    • Click on 'PivotTable'.

    • Select the data range you want to analyze.

    • Choose where you want to place the pivot table (new worksheet or existing worksheet).

    • Drag and drop fields into the rows, co...

  • Answered by AI
  • Q5. Introduce yourself with 5 strength and examples also.
  • Ans. 

    I am a dedicated and detail-oriented engineer with strengths in problem-solving, communication, teamwork, adaptability, and technical skills.

    • Problem-solving: Successfully resolved a complex technical issue by analyzing data and implementing a creative solution.

    • Communication: Effectively communicated project updates and requirements to team members and stakeholders.

    • Teamwork: Collaborated with cross-functional teams to a...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Sanden Vikas Engineer interview:
  • MS Excel and ERP
Interview preparation tips for other job seekers - Good knowledge in the field of ERP software and MS Office and it will help you more in interview.
You will get advantages in your work profession.
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
No response

I applied via Referral and was interviewed in Sep 2024. There were 4 interview rounds.

Round 1 - Tool Test 

(2 Questions)

  • Q1. Given a Plastic part to create a closed volume
  • Ans. 

    To create a closed volume from a plastic part, consider the shape, dimensions, material properties, and manufacturing process.

    • Consider the shape of the plastic part - it should be able to enclose a volume without any openings.

    • Ensure the dimensions of the part allow for a complete enclosure of the desired volume.

    • Select a plastic material that is suitable for creating a closed volume, such as ABS or polycarbonate.

    • Choose ...

  • Answered by AI
  • Q2. This is to test CATIA V5 software knowledge and about plastic part modeling
Round 2 - Technical 

(1 Question)

  • Q1. Basic questions about Plastic parts and types of plastic materials. Some technical questions.
Round 3 - Technical 

(1 Question)

  • Q1. In round 3 the Engineering team head will be interviewing on some technical questions.
Round 4 - HR 

(1 Question)

  • Q1. Previous work experience and salary discussion

Interview Preparation Tips

Topics to prepare for India Japan Lighting Engineer interview:
  • CATIA
  • Ansys speo
Interview preparation tips for other job seekers - Mostly they will only select if you are a beginner or a higher level position. If you are trying for mid or senior-level, don't waste your time.

If you are for beginner be prepared for a Bond (contract for at least 5 years period). They will definitely ask you for this

Mungi Group Interview FAQs

How many rounds are there in Mungi Group CMM Inspector interview?
Mungi Group interview process usually has 3 rounds. The most common rounds in the Mungi Group interview process are Resume Shortlist, Group Discussion and Coding Test.

Tell us how to improve this page.

Mungi Group CMM Inspector Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Mungi Group CMM Inspector Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

5.0

Salary

5.0

Job security

5.0

Company culture

5.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Production Engineer
86 salaries
unlock blur

₹1.8 L/yr - ₹6.1 L/yr

Shift Engineer
54 salaries
unlock blur

₹2.5 L/yr - ₹6.7 L/yr

Quality Engineer
50 salaries
unlock blur

₹1.8 L/yr - ₹5.8 L/yr

Quality Inspector
34 salaries
unlock blur

₹1 L/yr - ₹3.5 L/yr

HR Executive
28 salaries
unlock blur

₹1.5 L/yr - ₹5.5 L/yr

Explore more salaries
Compare Mungi Group with

Knorr-Bremse

3.9
Compare

Sanden Vikas

4.0
Compare

Victora Auto Private Limited

3.9
Compare

India Japan Lighting

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview