I applied via Approached by Company and was interviewed in Sep 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What are cement tests?
  • Ans. 

    Cement tests are conducted to ensure the quality and performance of cement in construction.

    • Cement tests are performed to determine the physical and chemical properties of cement.

    • Some common cement tests include fineness test, setting time test, compressive strength test, and soundness test.

    • Fineness test measures the particle size of cement particles.

    • Setting time test determines the time taken for cement to set and hard...

  • Answered by AI
  • Q2. What is density of steel.
  • Ans. 

    The density of steel is approximately 7.85 grams per cubic centimeter.

    • Density is a measure of how much mass is contained in a given volume.

    • Steel is a commonly used alloy composed primarily of iron and carbon.

    • The density of steel can vary depending on the specific type and composition.

    • The density of stainless steel, for example, is slightly higher than that of carbon steel.

    • The density of steel is often used in engineeri

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - My interview went very well. I work in the company for the benefit of the company

QA QC Engineer Interview Questions asked at other Companies

Q1. wha is your response ?, if material will purchase from any factory then what will u do that ? , how many hours can u do work in a day?, do u know all plant calibration?, how the borrow area will select ?, how u manage your junior in work pe... read more
View answer (2)

I applied via Approached by Company and was interviewed in Sep 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is cement test.
  • Ans. 

    Cement test is a process of evaluating the quality and properties of cement.

    • Cement tests are conducted to ensure that the cement meets the required standards and specifications.

    • Some common cement tests include fineness test, setting time test, compressive strength test, and soundness test.

    • These tests help to determine the strength, durability, and consistency of the cement.

    • Cement tests are important in construction pro...

  • Answered by AI
  • Q2. What is Steel density.
  • Ans. 

    The density of steel is around 7.85 g/cm³.

    • Steel density is the mass per unit volume of steel.

    • It is measured in grams per cubic centimeter (g/cm³) or kilograms per cubic meter (kg/m³).

    • The density of steel varies depending on its composition and temperature.

    • For example, the density of stainless steel is around 8 g/cm³.

    • Steel with higher carbon content has a higher density than steel with lower carbon content.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - My interview went very well.I always work for the company to reach the heights. So that both the company and our work can be done.

QA QC Engineer Interview Questions asked at other Companies

Q1. wha is your response ?, if material will purchase from any factory then what will u do that ? , how many hours can u do work in a day?, do u know all plant calibration?, how the borrow area will select ?, how u manage your junior in work pe... read more
View answer (2)

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before May 2018. There were 2 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. What is Your Current Sallary.
  • Ans. 

    I am currently earning $60,000 per year.

    • My current salary is $60,000 per year.

    • I am satisfied with my current salary.

    • I believe my salary reflects my experience and qualifications.

  • Answered by AI
  • Q2. Expected salary
  • Q3. Negotiable sallary how much you negotiate.
  • Q4. Yourself Introduction.
  • Q5. About Your projects, experience and some technical question . I.e. procedure of work , productivity of workman and how to start your activities etc.

Interview Preparation Tips

You should be confident don't be nervous and Give your best.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I was interviewed before May 2017.

Interview Questionnaire 

4 Questions

  • Q1. Good discussion with accounts team
  • Q2. Having good discussion with team
  • Q3. Good discussion for salary and others
  • Q4. Good company for working
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

Interview Questionnaire 

2 Questions

  • Q1. Type of pile , why we provide pile,pile dia , lvup vup svup type questions
  • Ans. 

    Piles are used in construction to transfer loads from a structure to a stronger layer of soil or rock below the surface.

    • Types of piles include driven piles, bored piles, and screw piles.

    • Piles are provided to support structures on weak or compressible soil, to resist uplift forces, or to provide lateral support.

    • The diameter of a pile is determined based on the load it needs to support and the soil conditions.

    • LVUP (Large...

  • Answered by AI
  • Q2. Mostly we use two types of pile (1) friction pile (2)end bearing pile

Interview Preparation Tips

Interview preparation tips for other job seekers - Please read MORTH AN

Senior Designer Bim Interview Questions & Answers

AECOM user image Anonymous

posted on 10 Feb 2021

Interview Questionnaire 

2 Questions

  • Q1. Why do you want to join Aecom.
  • Q2. What kind of projects have you done? And what is the probem face of them. And how to resolve.

Interview Preparation Tips

Interview preparation tips for other job seekers - Aecom is a big name in the engineering field, here we will get a lot to learn so that our future will grow well. Tell the truth about what you know or else you will face problems. Because next you have to do all the work yourself. Because of the high work load, no one can help you much. I worked at Aecom for seven years. I have learned a lot there. Salary always comes on time. Due to pendamic we had to leave the job due to lack of work. But the Aecom company had done our full and final settelement within a month. Aecom is a very good company. If I get a chance to work in the company again, I would definitely like to join. Workload is very high. Deadline is very less, which affects its quality of work.

Interview Questionnaire 

6 Questions

  • Q1. Percentage of steel in pile
  • Ans. 

    The percentage of steel in a pile varies depending on the type and design of the pile.

    • The percentage of steel in a pile can range from 0% to over 90%.

    • The type of pile (e.g. steel, concrete, timber) and its design (e.g. diameter, length, wall thickness) determine the percentage of steel.

    • Steel piles typically have a higher percentage of steel than other types of piles.

    • The percentage of steel in a pile can also affect its

  • Answered by AI
  • Q2. Pile built-up above cut off level as per IS code
  • Ans. 

    Pile built-up above cut off level as per IS code

    • IS code specifies the maximum allowable pile length above cut off level

    • Pile length above cut off level should not exceed 3 times the pile diameter

    • Built-up pile above cut off level can cause structural instability and failure

  • Answered by AI
  • Q3. Pile vertical tolerance as per IS code
  • Ans. 

    Vertical tolerance for piles as per IS code

    • As per IS 2911-1:2010, the vertical tolerance for piles is +/- 25mm

    • This tolerance is applicable for both driven and cast-in-situ piles

    • The tolerance is measured at the top of the pile and at intervals of 3m along the length

    • If the deviation exceeds the tolerance limit, the pile may need to be rejected or remedial measures taken

  • Answered by AI
  • Q4. Pile concrete consumption +- tolerance
  • Ans. 

    Pile concrete consumption tolerance depends on various factors.

    • Pile diameter and length

    • Concrete mix design

    • Placement method

    • Quality control measures

    • Environmental conditions

    • Tolerance typically ranges from 5-10% of estimated consumption

    • Regular monitoring and adjustment of concrete consumption is necessary

  • Answered by AI
  • Q5. Unit weight of steel
  • Ans. 

    Unit weight of steel is 7850 kg/m³

    • The unit weight of steel is the weight of a specific volume of steel

    • It is measured in kilograms per cubic meter (kg/m³)

    • The unit weight of steel is 7850 kg/m³

    • This value may vary slightly depending on the composition and manufacturing process of the steel

  • Answered by AI
  • Q6. Contractor MB related

I applied via Naukri.com and was interviewed in Sep 2020. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. How much cement used for making 1m³ concrete
  • Ans. 

    The amount of cement used for making 1m³ of concrete varies depending on the desired strength and type of concrete.

    • The cement content typically ranges from 300 to 400 kg/m³ for general-purpose concrete.

    • For high-strength concrete, the cement content can be as high as 500 kg/m³ or more.

    • The water-cement ratio also affects the amount of cement required.

    • Admixtures and additives may be used to modify the properties of the co...

  • Answered by AI
  • Q2. 360 kg
  • Q3. How much steel used for 1m³ concreting
  • Ans. 

    The amount of steel used for 1m³ concreting varies depending on the type of concrete and the structural requirements.

    • The steel used in concrete is typically in the form of reinforcing bars (rebar) or welded wire mesh.

    • The amount of steel required for 1m³ of concrete depends on the structural requirements and the type of concrete being used.

    • For example, a standard reinforced concrete slab may require 70-100 kg of steel p...

  • Answered by AI
  • Q4. This answer given by a formula & some thumbrules of this answer

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic knowledge is the best knowledge.....interviewer asked so much questions to ask but I'm ready to give his answers .It lasted for about 30 minutes.Luckily I was able to answer most of the questions correctly. I tried to give my best. My advice is to stay calm & should apply presence of mind.

Interview Questionnaire 

11 Questions

  • Q1. Structural welding codes, Bridge welding codes
  • Q2. Process piping works
  • Ans. 

    Process piping works involve the installation, inspection, and maintenance of pipes used in industrial processes.

    • Process piping works include the design, fabrication, and installation of pipes for conveying fluids or gases in industrial settings.

    • QA QC engineers ensure that the piping systems meet the required standards and specifications.

    • Inspection and testing of process piping is done to check for leaks, pressure, and...

  • Answered by AI
  • Q3. Bolts tightening procedure
  • Ans. 

    Bolts tightening procedure involves following a specific torque value and sequence to ensure proper fastening of bolts.

    • Check the torque value specified in the design or manual

    • Use a torque wrench to tighten the bolts to the specified value

    • Tighten the bolts in a specific sequence to ensure even distribution of load

    • Recheck the torque value after tightening all bolts

    • Record the torque value and sequence for future reference

  • Answered by AI
  • Q4. Bolts testing and torqueing sequences.
  • Q5. Hydrotest and pneumatic test for piping
  • Ans. 

    Hydrotest and pneumatic test are methods used to test the integrity of piping systems.

    • Hydrotest involves filling the piping system with water and pressurizing it to a specified level for a set duration.

    • Pneumatic test involves filling the piping system with compressed air or nitrogen and pressurizing it to a specified level for a set duration.

    • Both tests are used to ensure that the piping system can withstand the expecte...

  • Answered by AI
  • Q6. Able to refer codes and procedures.
  • Q7. Painting knowledge
  • Q8. Able to repair painted surface area.
  • Q9. Clients and inspection agency
  • Q10. Clients faced interviews.
  • Q11. Job training

I applied via Recruitment Consultant and was interviewed in Oct 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Regarding Welding process, Painting, Coating System, NDT Inspection, Piping and Structural codes and acceptance.

Interview Preparation Tips

Interview preparation tips for other job seekers - Must have knowledge about different type of materials, welding process and Advanced Technology for Inspection.

MSA Construction Interview FAQs

How many rounds are there in MSA Construction interview?
MSA Construction interview process usually has 2 rounds. The most common rounds in the MSA Construction interview process are Resume Shortlist and Technical.
How to prepare for MSA Construction interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at MSA Construction . The most common topics and skills that interviewers at MSA Construction expect are Accounting, MS Office, Taxation, Accounts Finalisation and Auditing.
What are the top questions asked in MSA Construction interview?

Some of the top questions asked at the MSA Construction interview -

  1. What are cement tes...read more
  2. What is density of ste...read more
  3. What is Steel densi...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 676 Interviews
Tata Projects Interview Questions
4.3
 • 397 Interviews
KEC International Interview Questions
4.1
 • 286 Interviews
Tata Technologies Interview Questions
3.7
 • 245 Interviews
TCE Interview Questions
3.8
 • 237 Interviews
View all

MSA Construction Reviews and Ratings

based on 6 reviews

4.8/5

Rating in categories

3.1

Skill development

3.2

Work-Life balance

4.1

Salary & Benefits

4.0

Job Security

3.5

Company culture

3.1

Promotions/Appraisal

3.7

Work Satisfaction

Explore 6 Reviews and Ratings
Executive Accountant
5 salaries
unlock blur

₹1.9 L/yr - ₹2 L/yr

Civil Site Engineer
4 salaries
unlock blur

₹2.2 L/yr - ₹4.8 L/yr

Accountant
3 salaries
unlock blur

₹1.9 L/yr - ₹2 L/yr

Civil Engineer
3 salaries
unlock blur

₹4 L/yr - ₹4 L/yr

Member
3 salaries
unlock blur

₹1.6 L/yr - ₹1.7 L/yr

Explore more salaries
Compare MSA Construction with

Larsen & Toubro Limited

4.0
Compare

L&T Construction

4.0
Compare

Tata Projects

4.3
Compare

Megha Engineering & Infrastructures

3.9
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview