I applied via Job Fair and was interviewed in Mar 2022. There were 2 interview rounds.
There are mainly three part of an attitude test, There are Numerical, reasoning, Logical, ability, verbal ability.
Top trending discussions
posted on 24 Mar 2024
I applied via Recruitment Consulltant and was interviewed in Sep 2023. There was 1 interview round.
HIRA stands for Hazard Identification and Risk Assessment. Work at Height refers to tasks performed at elevated locations, with hazards including falls, falling objects, and structural collapses.
HIRA involves identifying potential hazards in the workplace and assessing the risks associated with them.
Work at Height includes tasks such as working on roofs, scaffolding, ladders, or elevated platforms.
Hazards of Work at He...
The type of lifting component refers to the equipment or machinery used for lifting heavy objects.
Common types include cranes, forklifts, hoists, and pallet jacks
Each type has specific safety protocols and training requirements
Inspecting and maintaining lifting components is crucial for safety
A work permit is a written authorization required to perform certain tasks or enter specific areas within a workplace.
Types of work permits include hot work permits, confined space entry permits, electrical work permits, etc.
Work permits outline the specific tasks to be performed, potential hazards, safety precautions, and duration of the permit.
They are typically issued by a supervisor or safety officer and must be ob...
Hot work hazard refers to the risks associated with tasks involving open flames, sparks, or high temperatures. Precautions include proper training, fire prevention measures, and personal protective equipment.
Ensure proper training for all workers involved in hot work tasks
Implement fire prevention measures such as removing flammable materials from the work area
Provide and ensure the use of appropriate personal protecti...
posted on 5 Dec 2023
I applied via Walk-in
Site related safety issues and discuss for permit system and use of PPEs like this
There are five main types of fire extinguishers: water, foam, powder, CO2, and wet chemical.
Water fire extinguishers are suitable for Class A fires involving solid materials like wood or paper.
Foam fire extinguishers are effective for Class A and B fires, which involve flammable liquids like petrol or oil.
Powder fire extinguishers can be used on Class A, B, C, and electrical fires. They are versatile but can cause a lo...
posted on 4 Mar 2023
I applied via Approached by Company and was interviewed in Feb 2023. There were 3 interview rounds.
Fire is a chemical reaction that releases heat and light. It has four classifications.
Fire is a rapid oxidation process that produces heat and light.
The four classifications of fire are Class A, Class B, Class C, and Class D.
Class A fires involve ordinary combustibles like wood, paper, and cloth.
Class B fires involve flammable liquids and gases like gasoline and propane.
Class C fires involve electrical equipment like a...
Bridge construction involves several stages from planning to completion.
Planning and design
Site preparation and foundation work
Substructure construction
Superstructure construction
Finishing and maintenance
Examples of bridge types: suspension, cable-stayed, arch, beam, truss
Pilling is the formation of small balls of fibers on the surface of a fabric.
Pilling occurs due to friction and abrasion on the fabric surface.
It is more common in synthetic fabrics than natural ones.
Pilling can be prevented by using fabric softeners, washing clothes inside out, and avoiding high heat in the dryer.
Pilling can be removed using a fabric shaver or a lint roller.
Pilling is not a sign of poor quality fabric
Noise is classified as any sound above 85 decibels.
Noise levels above 85 decibels can cause hearing damage.
Examples of noise levels: normal conversation - 60 decibels, heavy traffic - 85 decibels, rock concert - 110 decibels.
It is important to wear hearing protection in noisy environments.
posted on 9 Aug 2024
I applied via LinkedIn and was interviewed in Mar 2024. There was 1 interview round.
Hazards of work at height include falls, falling objects, unstable surfaces, and weather conditions.
Falls from height can result in serious injuries or fatalities
Objects falling from height can cause harm to workers below
Unstable surfaces such as ladders or scaffolding can lead to slips or falls
Weather conditions like wind or rain can increase the risk of accidents
Improper use of safety equipment can also contribute to
Hazard Control Hierarchy is a system used to prioritize and implement control measures to reduce or eliminate workplace hazards.
Hierarchy of controls ranks control measures from most effective to least effective: Elimination, Substitution, Engineering Controls, Administrative Controls, Personal Protective Equipment (PPE)
The goal is to eliminate or reduce hazards at the source rather than relying on PPE
Example: Instead ...
Safety in construction site involves implementing measures to prevent accidents and injuries.
Ensuring all workers are properly trained on safety procedures
Regular inspections of equipment and machinery
Providing personal protective equipment (PPE) to all workers
Implementing fall protection measures for working at heights
Creating emergency response plans and conducting drills
Enforcing strict adherence to safety regulatio
posted on 18 Nov 2023
Safety Officer is responsible for ensuring the safety of employees, implementing safety protocols, conducting safety inspections, and promoting a culture of safety in the workplace.
Implementing safety protocols and procedures
Conducting safety inspections and audits
Training employees on safety practices
Investigating accidents and incidents
Ensuring compliance with safety regulations
Promoting a culture of safety in the wo
posted on 19 Oct 2023
I applied via Walk-in and was interviewed in Apr 2022. There were 2 interview rounds.
Induction training, Tooi box training, special training, mockdrill work system, all power tools handling and inspection ,P&M ,electrical equipment inspection.
based on 1 review
Rating in categories
Assistant Manager
66
salaries
| ₹6.4 L/yr - ₹10.8 L/yr |
Assistant Engineer
47
salaries
| ₹2.1 L/yr - ₹4.2 L/yr |
Senior Engineer
38
salaries
| ₹4.8 L/yr - ₹8 L/yr |
Deputy Manager
37
salaries
| ₹8.5 L/yr - ₹12 L/yr |
Engineer
21
salaries
| ₹3 L/yr - ₹6 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company