Merlin Group QS & Planning Engineer Interview Questions and Answers

Updated 12 Oct 2022

Merlin Group QS & Planning Engineer Interview Experiences

1 interview found

I applied via Walk-in and was interviewed before Oct 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. How to prepare bbs?what are the steps of construction?
  • Ans. 

    BBS preparation involves identifying the required reinforcement, calculating the quantity, and detailing the placement.

    • Identify the required reinforcement from the structural drawings

    • Calculate the quantity of reinforcement required

    • Detail the placement of reinforcement in the form of a bar bending schedule

    • Ensure the reinforcement is cut, bent, and placed as per the BBS

    • Construction steps involve excavation, foundation, s

  • Answered by AI
  • Q2. What are the design mix
  • Ans. 

    Design mix refers to the proportion of materials used in concrete to achieve desired strength and durability.

    • Design mix is determined by the engineer based on the project requirements.

    • It includes the ratio of cement, water, aggregates, and admixtures.

    • The mix is tested for compressive strength and workability before use.

    • Examples of design mix include M20, M30, and M40.

    • The design mix can be adjusted during construction i

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare for interview .basic knowledge required .be prepared

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Labour productivity
  • Q2. Master plan details
Interview experience
2
Poor
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Not Selected

I applied via Referral and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Frequency of updating of baseline schedule
  • Ans. 

    Baseline schedules should be updated regularly to reflect changes in project scope, timeline, and resources.

    • Baseline schedules should be updated at key project milestones or when significant changes occur.

    • Regular updates ensure that the schedule remains accurate and reflects the current status of the project.

    • Updates should be communicated to all stakeholders to keep them informed of any changes.

    • Examples of changes that...

  • Answered by AI
  • Q2. What is crashing of schedule
  • Ans. 

    Crashing of schedule is a technique used in project management to shorten the project duration by adding more resources.

    • Crashing involves adding more resources to critical path activities to reduce the overall project duration.

    • It is typically used when there is a need to meet a deadline or when there are financial incentives for early completion.

    • Crashing may increase project costs due to the additional resources requir...

  • Answered by AI
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Walk-in and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - One-on-one 

(5 Questions)

  • Q1. Types of trackers that were used for monitoring the project.
  • Ans. 

    Various types of trackers used for project monitoring include Gantt charts, milestone trackers, budget trackers, and resource trackers.

    • Gantt charts: Visual representation of project tasks and timelines

    • Milestone trackers: Monitoring key project milestones and deadlines

    • Budget trackers: Tracking project expenses and budget allocations

    • Resource trackers: Monitoring the allocation and utilization of project resources

  • Answered by AI
  • Q2. Questions regarding critical paths, types of floats.
  • Q3. Types of constraints in scheduling
  • Ans. 

    Types of constraints in scheduling include resource constraints, time constraints, and dependencies.

    • Resource constraints: limitations on the availability of resources such as equipment, materials, or personnel

    • Time constraints: deadlines or specific time frames that must be adhered to

    • Dependencies: tasks that are dependent on the completion of other tasks before they can begin

    • Examples: A construction project may have res...

  • Answered by AI
  • Q4. Levels of scheduling
  • Ans. 

    Levels of scheduling refer to the different stages of planning and organizing tasks in a project timeline.

    • Levels of scheduling include strategic, tactical, and operational planning.

    • Strategic planning involves setting long-term goals and objectives for the project.

    • Tactical planning focuses on specific actions and resources needed to achieve the strategic goals.

    • Operational planning deals with day-to-day tasks and schedul...

  • Answered by AI
  • Q5. Productivity of different items in construction project
  • Ans. 

    Productivity of different items in construction project varies based on factors like complexity, labor skill level, and equipment availability.

    • Productivity can be influenced by factors such as complexity of the task, skill level of laborers, availability of equipment, and weather conditions.

    • For example, installing basic electrical wiring may have higher productivity compared to installing specialized HVAC systems.

    • Effic...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for JLL Project Planning Engineer interview:
  • Project Management
  • Project Scheduling

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Oct 2023. There were 2 interview rounds.

Round 1 - Technical 

(5 Questions)

  • Q1. Role of planning engineer
  • Ans. 

    Planning engineers are responsible for creating project schedules, monitoring progress, and ensuring timely completion.

    • Develop project schedules using software like Primavera P6

    • Monitor project progress and identify potential delays

    • Coordinate with various teams to ensure timely completion

    • Prepare reports on project status and communicate with stakeholders

    • Implement changes to the schedule as needed to keep the project on

  • Answered by AI
  • Q2. What is critical path
  • Ans. 

    Critical path is the longest sequence of tasks in a project that must be completed on time to ensure the project finishes on schedule.

    • Critical path helps in identifying the tasks that are crucial for the project timeline.

    • It determines the shortest possible duration for completing the project.

    • Any delay in tasks on the critical path will directly impact the project's overall timeline.

    • Activities on the critical path have ...

  • Answered by AI
  • Q3. Density of steel
  • Ans. 

    Density of steel is approximately 7.85 g/cm^3.

    • The density of steel is commonly expressed in grams per cubic centimeter (g/cm^3).

    • The density of steel is approximately 7.85 g/cm^3.

    • Different types of steel may have slightly different densities.

  • Answered by AI
  • Q4. How to calculate weight of steel
  • Ans. 

    Weight of steel can be calculated by multiplying the volume of steel by its density.

    • Calculate the volume of steel (length x width x height)

    • Determine the density of the specific type of steel being used

    • Multiply the volume by the density to get the weight

    • Example: Weight of a steel plate with dimensions 2m x 1m x 0.1m and density of 7850 kg/m^3 would be 2 x 1 x 0.1 x 7850 = 1570 kg

  • Answered by AI
  • Q5. How to calculate number of tiles
  • Ans. 

    Number of tiles can be calculated by determining the area to be covered and the size of each tile.

    • Calculate the total area to be covered by multiplying the length and width of the space.

    • Determine the size of each tile in square units.

    • Divide the total area by the size of each tile to get the number of tiles needed.

    • Consider adding extra tiles for cuts and wastage.

    • For example, if a room is 10 feet by 12 feet and each tile

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. About excel shortcuts
  • Q2. Drawing related questions
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. How to arrive the quantity
  • Ans. 

    Quantity can be arrived at by calculating the dimensions and quantities of materials needed for a project.

    • Calculate the dimensions of the project area

    • Determine the materials needed for the project

    • Estimate the quantities of materials required based on the dimensions and specifications

    • Consider factors such as wastage and additional materials for contingencies

    • Use software tools like AutoCAD or Excel for accurate calculati

  • Answered by AI
  • Q2. How to cost analysis
  • Ans. 

    Cost analysis involves evaluating the expenses associated with a project or operation to determine its financial feasibility.

    • Identify all costs associated with the project or operation, including direct and indirect costs.

    • Break down costs into categories such as labor, materials, equipment, overhead, and contingency.

    • Compare actual costs to budgeted costs to identify any variances and analyze the reasons behind them.

    • Use...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. About experience

I was interviewed before Sep 2021.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Explain Planning process
  • Ans. 

    Planning process involves defining objectives, identifying resources, creating a schedule, and monitoring progress.

    • Define project objectives and scope

    • Identify available resources and constraints

    • Create a detailed project schedule

    • Monitor progress and make adjustments as necessary

  • Answered by AI
  • Q2. Explain in deatils of planning ptocess
  • Ans. 

    The planning process involves identifying objectives, determining resources, and creating a timeline for completion.

    • Identify project objectives and goals

    • Determine available resources and constraints

    • Create a detailed project plan with timelines and milestones

    • Monitor progress and make adjustments as necessary

    • Communicate with stakeholders and team members throughout the process

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be clear on your concepts.
Put your explanation conveniences
Provide all technical details

I applied via Referral and was interviewed in May 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Job related questions, past experience, hands on primavera

Interview Preparation Tips

Interview preparation tips for other job seekers - Be yourself. LEarn P6 properly
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Dec 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Ready to locate for panipat
  • Ans. 

    Yes, I am ready to locate for Panipat.

    • I am willing to relocate to Panipat for the Senior Planning Manager position.

    • I understand the importance of being physically present in the location for effective planning and management.

    • I have researched about Panipat and its industrial landscape, which aligns with my expertise.

    • I am excited about the opportunity to contribute to the growth and success of the company in Panipat.

  • Answered by AI
Round 2 - Technical 

(1 Question)

  • Q1. How you know about planning and how is your contribution

Interview Preparation Tips

Topics to prepare for M3M India Senior Manager Planning interview:
  • Planning
  • Schedule
  • Budgeting
  • Costing
  • Productivity

Merlin Group Interview FAQs

How many rounds are there in Merlin Group QS & Planning Engineer interview?
Merlin Group interview process usually has 2 rounds. The most common rounds in the Merlin Group interview process are Resume Shortlist and Technical.
What are the top questions asked in Merlin Group QS & Planning Engineer interview?

Some of the top questions asked at the Merlin Group QS & Planning Engineer interview -

  1. How to prepare bbs?what are the steps of constructi...read more
  2. What are the design ...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

JLL Interview Questions
4.1
 • 336 Interviews
CBRE Interview Questions
4.2
 • 252 Interviews
NoBroker Interview Questions
3.1
 • 223 Interviews
Square Yards Interview Questions
4.1
 • 195 Interviews
Sobha Interview Questions
3.9
 • 124 Interviews
Lodha Group Interview Questions
4.0
 • 122 Interviews
View all
Assistant Manager
14 salaries
unlock blur

₹5.4 L/yr - ₹8 L/yr

Executive Accountant
12 salaries
unlock blur

₹1.2 L/yr - ₹6.5 L/yr

Senior Engineer
11 salaries
unlock blur

₹4 L/yr - ₹6.8 L/yr

Senior Sales Executive
11 salaries
unlock blur

₹3 L/yr - ₹5.5 L/yr

Site Engineer
9 salaries
unlock blur

₹1.5 L/yr - ₹4 L/yr

Explore more salaries
Compare Merlin Group with

DLF

4.0
Compare

Prestige Group

4.3
Compare

Godrej Properties

3.7
Compare

Sobha

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview