Quantity can be arrived at by calculating the dimensions and quantities of materials needed for a project.
Calculate the dimensions of the project area
Determine the materials needed for the project
Estimate the quantities of materials required based on the dimensions and specifications
Consider factors such as wastage and additional materials for contingencies
Use software tools like AutoCAD or Excel for accurate calculati
Cost analysis involves evaluating the expenses associated with a project or operation to determine its financial feasibility.
Identify all costs associated with the project or operation, including direct and indirect costs.
Break down costs into categories such as labor, materials, equipment, overhead, and contingency.
Compare actual costs to budgeted costs to identify any variances and analyze the reasons behind them.
Use...
posted on 2 May 2022
I applied via Approached by Company and was interviewed before May 2021. There were 3 interview rounds.
Estimation and costing of materials is a crucial aspect of civil engineering projects.
Estimation involves calculating the quantity of materials required for a project
Costing involves determining the cost of these materials
Factors such as market rates, transportation costs, and taxes must be considered
Software such as AutoCAD and Excel can be used for accurate estimation and costing
Regular updates and adjustments must b...
I applied via Approached by Company and was interviewed before Mar 2021. There was 1 interview round.
posted on 12 Sep 2022
I applied via Walk-in and was interviewed before Apr 2022. There were 2 interview rounds.
Mivan slab cycle is a construction technique using aluminum formwork for casting slabs in a repetitive cycle.
Mivan slab cycle involves setting up aluminum formwork panels for casting slabs.
The cycle includes fixing reinforcement, pouring concrete, curing, and then dismantling the formwork for reuse.
This method is efficient, cost-effective, and results in high-quality finishes.
Mivan slab cycle reduces construction time ...
Before concreting, ensure proper formwork, reinforcement placement, concrete mix design, and weather conditions.
Check formwork for proper alignment and stability
Ensure reinforcement bars are correctly placed as per design
Verify concrete mix design meets project specifications
Monitor weather conditions to prevent issues like rain or extreme temperatures affecting the concrete
My expected salary is based on my qualifications, experience, and the industry standards.
I am looking for a competitive salary that reflects my skills and experience in the civil engineering field.
I have researched the average salary range for Civil Site Engineers in this region and industry.
I am open to negotiation based on the overall compensation package offered by the company.
I am looking for a salary that aligns w...
I appeared for an interview in Jul 2024.
SBC stands for Safe Bearing Capacity.
SBC is the maximum pressure that can be applied to the soil without causing shear failure.
It is an important parameter in geotechnical engineering for designing foundations.
SBC is determined through field tests like Standard Penetration Test (SPT) or Plate Load Test.
The value of SBC varies for different types of soil, such as clay, sand, or gravel.
Soil bearing capacity is the maximum load that the soil can safely support without undergoing excessive settlement.
Soil bearing capacity is influenced by factors such as soil type, moisture content, compaction, and depth.
It is important to determine the soil bearing capacity before designing foundations for structures.
Common methods to determine soil bearing capacity include plate load tests, standard penetration tests
Your company's commitment to innovation and sustainability aligns with my values and career goals.
I am impressed by the company's track record of successful projects in the civil engineering field.
Your company's focus on sustainability and green initiatives is something I am passionate about.
I believe that working with your team will provide me with valuable learning opportunities and career growth.
The positive work cu...
I appeared for an interview before Feb 2023.
Steel cutting length is the length of steel bars required for construction purposes.
Steel cutting length is calculated based on the dimensions of the structure and the required reinforcement.
It is important to consider the bending and overlapping requirements when determining the cutting length.
Steel cutting length can be calculated using formulas or software programs.
For example, for a beam with a length of 5 meters a...
I applied via Walk-in and was interviewed in Feb 2024. There were 2 interview rounds.
Cube filling rod is technically known as 'Tamping rod'.
Also known as tamping rod
Used to compact concrete in cube molds
Helps in removing air voids and ensuring uniform density
Typically made of steel or iron
Standard length is 16 inches with a diameter of 5/8 inch
BBS stands for Bar Bending Schedule.
BBS is a document that provides details of reinforcement cutting length, type, and size of bars used in construction.
It helps in estimating the quantity of steel required for construction.
BBS is essential for ensuring the structural integrity and strength of the building.
Example: BBS includes information on the number of bars, their diameter, spacing, and placement in beams, columns,
I applied via Referral and was interviewed in Oct 2023. There was 1 interview round.
Project planning management estimate and costing
based on 1 interview
Interview experience
Assistant Manager
244
salaries
| ₹2.8 L/yr - ₹8 L/yr |
Senior Executive
243
salaries
| ₹2 L/yr - ₹5.4 L/yr |
Executive
89
salaries
| ₹1.8 L/yr - ₹5 L/yr |
Site Engineer
83
salaries
| ₹1.8 L/yr - ₹5.5 L/yr |
Senior Site Engineer
69
salaries
| ₹2.4 L/yr - ₹5.5 L/yr |
Lodha Group
Sobha
Godrej Properties
Cushman & Wakefield