Casagrand Planning & Billing Engineer Interview Questions and Answers

Updated 28 Jul 2024

Casagrand Planning & Billing Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. How to arrive the quantity
  • Ans. 

    Quantity can be arrived at by calculating the dimensions and quantities of materials needed for a project.

    • Calculate the dimensions of the project area

    • Determine the materials needed for the project

    • Estimate the quantities of materials required based on the dimensions and specifications

    • Consider factors such as wastage and additional materials for contingencies

    • Use software tools like AutoCAD or Excel for accurate calculati

  • Answered by AI
  • Q2. How to cost analysis
  • Ans. 

    Cost analysis involves evaluating the expenses associated with a project or operation to determine its financial feasibility.

    • Identify all costs associated with the project or operation, including direct and indirect costs.

    • Break down costs into categories such as labor, materials, equipment, overhead, and contingency.

    • Compare actual costs to budgeted costs to identify any variances and analyze the reasons behind them.

    • Use...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

Interview questions from similar companies

I applied via Approached by Company and was interviewed before Mar 2021. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Start to bottom rcc work up to finishing work
  • Q2. Finishing sequence(block work- concild zari -waterproof work-concild piping, electrical work- internal gypsum., dado work, painting work

Interview Preparation Tips

Interview preparation tips for other job seekers - Experience of building &infrastructure execution work
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Civil engineering my skills
  • Q2. Site engineering skills

Interview Preparation Tips

Interview preparation tips for other job seekers - I have good
1. Project planning
2. AutoCAD
3. Design thinking
4. Relationship Building
5. Revit
6. Staad pro
7. Surveying planning
8. Computer Skill
9. Excellent communication
10. Organizational skills
11. Drawing preparation
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Jan 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - HR 

(3 Questions)

  • Q1. SlabCasting footing layout
  • Q2. BBS footing layout SlabCasting
  • Q3. Ratio RCC Beam, colum

Interview Preparation Tips

Interview preparation tips for other job seekers - footing layout SlabCasting drowning Redding , RCC
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
More than 8 weeks
Result
-

I was interviewed before Feb 2023.

Round 1 - Technical 

(2 Questions)

  • Q1. Streel cutting length
  • Ans. 

    Steel cutting length is the length of steel bars required for construction purposes.

    • Steel cutting length is calculated based on the dimensions of the structure and the required reinforcement.

    • It is important to consider the bending and overlapping requirements when determining the cutting length.

    • Steel cutting length can be calculated using formulas or software programs.

    • For example, for a beam with a length of 5 meters a...

  • Answered by AI
  • Q2. How to steel bar provided

Interview Preparation Tips

Interview preparation tips for other job seekers - Steel
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
-

I applied via Walk-in and was interviewed in Feb 2024. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. The technical name of cube filling rod?
  • Ans. 

    Cube filling rod is technically known as 'Tamping rod'.

    • Also known as tamping rod

    • Used to compact concrete in cube molds

    • Helps in removing air voids and ensuring uniform density

    • Typically made of steel or iron

    • Standard length is 16 inches with a diameter of 5/8 inch

  • Answered by AI
Round 2 - Technical 

(1 Question)

  • Q1. What is BBS fullform
  • Ans. 

    BBS stands for Bar Bending Schedule.

    • BBS is a document that provides details of reinforcement cutting length, type, and size of bars used in construction.

    • It helps in estimating the quantity of steel required for construction.

    • BBS is essential for ensuring the structural integrity and strength of the building.

    • Example: BBS includes information on the number of bars, their diameter, spacing, and placement in beams, columns,

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Sobha Civil Site Engineer interview:
  • Site Execution
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Apr 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - One-on-one 

(4 Questions)

  • Q1. Start to end building finishing execution procedure Plaster procedure Wsterproofing procedure? Personal Qualifications? Family background? Living location?
  • Q2. University qualifications? Present job situation
  • Q3. Finishing sequence after complition of block madonary & RCC complition?
  • Q4. All educational certificate verification?

Interview Preparation Tips

Interview preparation tips for other job seekers - Explain only work which you will be execution, Do job which is cable by yourself,
Do job Ownestly
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Explain mivan slab cycle
  • Ans. 

    Mivan slab cycle is a construction technique using aluminum formwork for casting slabs in a repetitive cycle.

    • Mivan slab cycle involves setting up aluminum formwork panels for casting slabs.

    • The cycle includes fixing reinforcement, pouring concrete, curing, and then dismantling the formwork for reuse.

    • This method is efficient, cost-effective, and results in high-quality finishes.

    • Mivan slab cycle reduces construction time ...

  • Answered by AI
  • Q2. What will you ensure before concreting
  • Ans. 

    Before concreting, ensure proper formwork, reinforcement placement, concrete mix design, and weather conditions.

    • Check formwork for proper alignment and stability

    • Ensure reinforcement bars are correctly placed as per design

    • Verify concrete mix design meets project specifications

    • Monitor weather conditions to prevent issues like rain or extreme temperatures affecting the concrete

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. Expected salary if selected
  • Ans. 

    My expected salary is based on my qualifications, experience, and the industry standards.

    • I am looking for a competitive salary that reflects my skills and experience in the civil engineering field.

    • I have researched the average salary range for Civil Site Engineers in this region and industry.

    • I am open to negotiation based on the overall compensation package offered by the company.

    • I am looking for a salary that aligns w...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
No response

I applied via Referral and was interviewed in Oct 2023. There was 1 interview round.

Round 1 - Aptitude Test 

Project planning management estimate and costing

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Campus Placement and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Tests for concrete and cement
  • Q2. Grades of concrete
  • Ans. 

    Grades of concrete refer to the strength of the concrete mix design.

    • Grades of concrete are denoted by M10, M15, M20, etc. where M stands for mix and the number represents the compressive strength in N/mm^2.

    • Higher grade concrete has higher compressive strength and is used for structural purposes.

    • Common grades include M25, M30, M35, and M40 for heavy-duty structures like bridges and high-rise buildings.

  • Answered by AI
  • Q3. What is slump in concrete
  • Ans. 

    Slump in concrete refers to the measure of consistency of freshly mixed concrete.

    • Slump is determined by the amount of water in the concrete mix.

    • It is measured by filling a cone-shaped mold with concrete, then lifting the mold to see how much the concrete slumps.

    • Different types of slumps (true slump, shear slump, collapse slump) indicate different levels of workability and strength of the concrete mix.

    • Slump test is comm...

  • Answered by AI
  • Q4. What is water cement ratio
  • Ans. 

    Water cement ratio is the ratio of the weight of water to the weight of cement used in a concrete mix.

    • Water cement ratio is a crucial factor in determining the strength and durability of concrete.

    • A lower water cement ratio results in stronger and more durable concrete.

    • The ideal water cement ratio varies depending on the type of concrete mix and its intended use.

    • For example, a water cement ratio of 0.5 is commonly used ...

  • Answered by AI
  • Q5. What is M20 grade concrete
  • Ans. 

    M20 grade concrete is a mix of 1 part cement, 1.5 parts sand, and 3 parts aggregate, with a compressive strength of 20 MPa.

    • M20 grade concrete is commonly used in residential construction.

    • It is a mix of 1 part cement, 1.5 parts sand, and 3 parts aggregate.

    • The compressive strength of M20 grade concrete is 20 MPa.

    • It is suitable for foundations, beams, columns, and slabs.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - gain practical knowlege
Contribute & help others!
anonymous
You can choose to be anonymous

Casagrand Interview FAQs

How many rounds are there in Casagrand Planning & Billing Engineer interview?
Casagrand interview process usually has 1 rounds. The most common rounds in the Casagrand interview process are One-on-one Round.
What are the top questions asked in Casagrand Planning & Billing Engineer interview?

Some of the top questions asked at the Casagrand Planning & Billing Engineer interview -

  1. How to arrive the quant...read more
  2. How to cost analy...read more

Recently Viewed

PHOTOS

InsuranceDekho

3 office photos

LIST OF COMPANIES

Credit Bajaar

Overview

JOBS

Wells Fargo

No Jobs

JOBS

Suryoday Small Finance Bank

No Jobs

INTERVIEWS

Knight Frank

No Interviews

JOBS

Lodha Group

No Jobs

INTERVIEWS

Casagrand

No Interviews

INTERVIEWS

Casagrand

No Interviews

INTERVIEWS

Knight Frank

No Interviews

INTERVIEWS

Casagrand

No Interviews

Tell us how to improve this page.

Casagrand Planning & Billing Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more
Join Casagrand Creating Happier Living Spaces

Interview Questions from Similar Companies

Sobha Interview Questions
3.9
 • 127 Interviews
Lodha Group Interview Questions
4.0
 • 125 Interviews
DLF Interview Questions
3.9
 • 74 Interviews
Colliers India Interview Questions
3.9
 • 63 Interviews
Rohan Builders Interview Questions
4.1
 • 43 Interviews
View all
Assistant Manager
241 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Executive
240 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Site Engineer
91 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Executive
89 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Marketing Executive
68 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Casagrand with

Prestige Group

4.3
Compare

Sobha

3.9
Compare

Brigade Group

4.1
Compare

Godrej Properties

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview