I applied via Naukri.com and was interviewed in Jun 2022. There were 3 interview rounds.
Transmission line construction involves planning, designing, and building structures to support power lines.
The process starts with surveying the land and obtaining necessary permits.
Next, the route is planned and the towers or poles are designed.
The towers or poles are then erected and the power lines are strung between them.
Finally, the lines are tested and put into operation.
Construction may involve the use of heavy...
Top trending discussions
I applied via Naukri.com and was interviewed before Sep 2021. There were 2 interview rounds.
The covered area of the project is approximately 10,000 square feet.
The covered area includes the indoor space of the project.
It does not include any outdoor space or open areas.
The exact covered area may vary depending on the project.
In this particular project, the covered area is approximately 10,000 square feet.
I applied via Company Website and was interviewed in Feb 2020. There was 1 interview round.
I was interviewed before May 2020.
To fix the rate of 1 cum metre RCC for M10 and M20, factors like material cost, labor cost, equipment cost, and overheads need to be considered.
Determine the cost of materials required for 1 cum metre RCC for M10 and M20
Calculate the labor cost involved in the construction process
Consider the cost of equipment required for the construction process
Include overheads like transportation, insurance, and taxes
Compare the ra...
I applied via Naukri.com and was interviewed before Sep 2020. There were 4 interview rounds.
When faced with a shortage of material received, we take immediate action to address the issue and minimize any negative impact.
Contact the supplier to inform them about the shortage and request immediate resolution
Check inventory records and cross-verify with the supplier's delivery documentation
Investigate the cause of the shortage, such as shipping errors or miscommunication
Implement measures to prevent future short...
Yes, corrections can be made in an invoice by following certain steps.
The correction should be made as soon as possible to avoid any confusion.
The original invoice should not be destroyed, but rather marked as 'void' or 'cancelled'.
A new invoice should be created with the correct information and a reference to the original invoice.
The reason for the correction should be clearly stated on the new invoice.
Both the origin...
Various SAP T codes for Issues
MB21 - Create Reservation
MB1A - Goods Withdrawal
MB1B - Transfer Posting
MB1C - Other Goods Receipts
MB1E - Create Stock Transport Order
MB1F - Goods Issue
MB1H - Maintain Reservation
MB1T - Transfer Posting
MB1A - Goods Withdrawal
MB1B - Transfer Posting
MB1C - Other Goods Receipts
MB1E - Create Stock Transport Order
MB1F - Goods Issue
MB1H - Maintain Reservation
I applied via Approached by Company and was interviewed before Sep 2021. There were 3 interview rounds.
I applied via Referral and was interviewed before Feb 2023. There were 2 interview rounds.
I applied via Naukri.com and was interviewed before Feb 2023. There was 1 interview round.
The acceptable tolerance in % value during receipts depends on the company's policies and industry standards.
The acceptable tolerance in % value during receipts can vary depending on the nature of the business.
Some companies may have a strict tolerance limit of 1-2% to ensure accuracy in financial records.
Other industries, such as retail, may have a higher tolerance limit of 5-10% due to factors like pricing errors or ...
Acceptable tolerance refers to the maximum deviation allowed from a desired value or standard.
Acceptable tolerance is a measure of how much variation is considered acceptable in a particular context.
It is often used in quality control to determine if a product or process meets the required standards.
For example, if the acceptable tolerance for a weight measurement is 0.5%, a weight of 100 grams can vary by up to 0.5 gr...
I applied via Naukri.com and was interviewed in Oct 2023. There were 3 interview rounds.
I worked at XYZ Company as a Deputy Manager.
Managed a team of 10 employees
Implemented new strategies to increase productivity
Achieved a 20% increase in sales within the first year
Streamlined processes to improve efficiency
based on 4 interviews
Interview experience
based on 27 reviews
Rating in categories
Engineer
898
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
878
salaries
| ₹0 L/yr - ₹0 L/yr |
Associate Manager
501
salaries
| ₹0 L/yr - ₹0 L/yr |
Mechanical Engineer
412
salaries
| ₹0 L/yr - ₹0 L/yr |
Civil Engineer
345
salaries
| ₹0 L/yr - ₹0 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Hindustan Construction Company