Upload Button Icon Add office photos

Filter interviews by

Megha Engineering & Infrastructures Manager Interview Questions and Answers

Updated 5 Nov 2024

Megha Engineering & Infrastructures Manager Interview Experiences

2 interviews found

Manager Interview Questions & Answers

user image ch sridevi

posted on 5 Nov 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(1 Question)

  • Q1. How do u manage in your old company

Manager Interview Questions & Answers

user image Anonymous

posted on 22 Dec 2022

I applied via Naukri.com and was interviewed in Jun 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Tell me about Transmission line construction process briefly
  • Ans. 

    Transmission line construction involves planning, designing, and building structures to support power lines.

    • The process starts with surveying the land and obtaining necessary permits.

    • Next, the route is planned and the towers or poles are designed.

    • The towers or poles are then erected and the power lines are strung between them.

    • Finally, the lines are tested and put into operation.

    • Construction may involve the use of heavy...

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Why you want to change your current company

Interview Preparation Tips

Interview preparation tips for other job seekers - Be honest with interviewer
Improve your presentation skills

Manager Interview Questions Asked at Other Companies

Q1. There is a chairman of a conglomerate. He has been on the post fo ... read more
asked in Axis Bank
Q2. How will you convince a school secretary to open account with you ... read more
Q3. What are kpi's?which are the kpi we use in daily basis
asked in HDFC Bank
Q4. what is FDI ,procedure how to settle the fund & why FDI need ... read more
Q5. There is a steel company with 2 plants in India. Now it has done ... read more

Interview questions from similar companies

I applied via Naukri.com and was interviewed before Sep 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Gm 

(3 Questions)

  • Q1. What is your last project and its site design
  • Q2. What is the covered area of project
  • Ans. 

    The covered area of the project is approximately 10,000 square feet.

    • The covered area includes the indoor space of the project.

    • It does not include any outdoor space or open areas.

    • The exact covered area may vary depending on the project.

    • In this particular project, the covered area is approximately 10,000 square feet.

  • Answered by AI
  • Q3. What type of building

Interview Preparation Tips

Interview preparation tips for other job seekers - Believe in yourself and done your all duties responsibilities properly and report your senior.

I applied via Company Website and was interviewed in Feb 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Power Transmission & distribution

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview for technical purpose.

I was interviewed before May 2020.

Interview Questionnaire 

1 Question

  • Q1. How to fix rate of 1 cum metre rcc for m10 and m20
  • Ans. 

    To fix the rate of 1 cum metre RCC for M10 and M20, factors like material cost, labor cost, equipment cost, and overheads need to be considered.

    • Determine the cost of materials required for 1 cum metre RCC for M10 and M20

    • Calculate the labor cost involved in the construction process

    • Consider the cost of equipment required for the construction process

    • Include overheads like transportation, insurance, and taxes

    • Compare the ra...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - technicalviru.in

I applied via Naukri.com and was interviewed before Sep 2020. There were 4 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. What we do for shortage of material received?
  • Ans. 

    When faced with a shortage of material received, we take immediate action to address the issue and minimize any negative impact.

    • Contact the supplier to inform them about the shortage and request immediate resolution

    • Check inventory records and cross-verify with the supplier's delivery documentation

    • Investigate the cause of the shortage, such as shipping errors or miscommunication

    • Implement measures to prevent future short...

  • Answered by AI
  • Q2. Can we do correction in invoice? if ans is yes then what are the further steps?
  • Ans. 

    Yes, corrections can be made in an invoice by following certain steps.

    • The correction should be made as soon as possible to avoid any confusion.

    • The original invoice should not be destroyed, but rather marked as 'void' or 'cancelled'.

    • A new invoice should be created with the correct information and a reference to the original invoice.

    • The reason for the correction should be clearly stated on the new invoice.

    • Both the origin...

  • Answered by AI
  • Q3. Various SAP T code for Issues
  • Ans. 

    Various SAP T codes for Issues

    • MB21 - Create Reservation

    • MB1A - Goods Withdrawal

    • MB1B - Transfer Posting

    • MB1C - Other Goods Receipts

    • MB1E - Create Stock Transport Order

    • MB1F - Goods Issue

    • MB1H - Maintain Reservation

    • MB1T - Transfer Posting

    • MB1A - Goods Withdrawal

    • MB1B - Transfer Posting

    • MB1C - Other Goods Receipts

    • MB1E - Create Stock Transport Order

    • MB1F - Goods Issue

    • MB1H - Maintain Reservation

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Always be positive; interviewer may cross checks your confidence through various counter question, but what is right is right it can not be wrong, if interviewer says it wrong then don't go by interviewer words, always stick with your belief and knowledge.

Skills evaluated in this interview

I applied via Approached by Company and was interviewed before Sep 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. General and deep questions regarding the subject will be asked as per the position applied and past experience.
Round 3 - HR 

(1 Question)

  • Q1. Regarding salary negotiation the discussion was on. TPL always gives a hike from current salary where no other current contractor in the industry can offer the same. Their package is fixed.

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare well according to your past experiences. Don’t have any loose end in what you have worked on. Be vigilant and have patience while replying becoz mostly interview will be took on Skype during 2019 nowadays using Microsoft teams
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Feb 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Related to piping knowledge as per ASME Section
Round 2 - HR 

(1 Question)

  • Q1. Working culture and salary package
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Feb 2023. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. How much tolerence in acceptable in %value during receipts ?
  • Ans. 

    The acceptable tolerance in % value during receipts depends on the company's policies and industry standards.

    • The acceptable tolerance in % value during receipts can vary depending on the nature of the business.

    • Some companies may have a strict tolerance limit of 1-2% to ensure accuracy in financial records.

    • Other industries, such as retail, may have a higher tolerance limit of 5-10% due to factors like pricing errors or ...

  • Answered by AI
  • Q2. Acceptable tolerence is 0.5%
  • Ans. 

    Acceptable tolerance refers to the maximum deviation allowed from a desired value or standard.

    • Acceptable tolerance is a measure of how much variation is considered acceptable in a particular context.

    • It is often used in quality control to determine if a product or process meets the required standards.

    • For example, if the acceptable tolerance for a weight measurement is 0.5%, a weight of 100 grams can vary by up to 0.5 gr...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Oct 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Technical questions for your relative job.
Round 3 - One-on-one 

(1 Question)

  • Q1. Name previous company.what do you of work.
  • Ans. 

    I worked at XYZ Company as a Deputy Manager.

    • Managed a team of 10 employees

    • Implemented new strategies to increase productivity

    • Achieved a 20% increase in sales within the first year

    • Streamlined processes to improve efficiency

  • Answered by AI

Megha Engineering & Infrastructures Interview FAQs

How many rounds are there in Megha Engineering & Infrastructures Manager interview?
Megha Engineering & Infrastructures interview process usually has 2 rounds. The most common rounds in the Megha Engineering & Infrastructures interview process are Resume Shortlist, Technical and HR.
How to prepare for Megha Engineering & Infrastructures Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Megha Engineering & Infrastructures. The most common topics and skills that interviewers at Megha Engineering & Infrastructures expect are Gas, HPCL, Material Management, Oil and Refinery.

Tell us how to improve this page.

Megha Engineering & Infrastructures Manager Interview Process

based on 4 interviews

Interview experience

4
  
Good
View more
Megha Engineering & Infrastructures Manager Salary
based on 122 salaries
₹7.5 L/yr - ₹22.5 L/yr
19% less than the average Manager Salary in India
View more details

Megha Engineering & Infrastructures Manager Reviews and Ratings

based on 27 reviews

3.9/5

Rating in categories

3.4

Skill development

3.6

Work-life balance

3.6

Salary

3.7

Job security

3.4

Company culture

3.0

Promotions

3.7

Work satisfaction

Explore 27 Reviews and Ratings
Engineer
898 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
878 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Associate Manager
501 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Mechanical Engineer
412 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Civil Engineer
345 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Megha Engineering & Infrastructures with

Larsen & Toubro Limited

4.0
Compare

Tata Projects

4.2
Compare

GMR Group

4.0
Compare

Hindustan Construction Company

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview