Filter interviews by
I was interviewed before Feb 2024.
I handle the team by fostering open communication, setting clear goals, providing support, and recognizing achievements.
Foster open communication within the team to ensure everyone is on the same page
Set clear goals and expectations for each team member to work towards
Provide support and resources to help team members succeed
Recognize and celebrate achievements to boost morale and motivation
I am open to any location that offers growth opportunities and a supportive team environment.
Open to relocation for the right opportunity
Prefer a location with a strong project management community
Interested in locations with access to professional development resources
Prioritize locations with a collaborative work culture
Top trending discussions
posted on 11 Dec 2023
The process of building survey involves several steps to assess the condition and suitability of a building.
Determine the purpose of the survey and the scope of work
Conduct a visual inspection of the building's exterior and interior
Identify any structural issues, such as cracks or signs of deterioration
Assess the building's systems, including electrical, plumbing, and HVAC
Evaluate the building's compliance with buildin...
Development length is the minimum length of reinforcement required to transfer the stress between the concrete and the reinforcement.
Development length is determined by factors such as the type of reinforcement, concrete strength, and bond strength.
It is necessary to ensure that the reinforcement bars are properly embedded in the concrete to provide structural integrity.
The development length can vary depending on the ...
Waterproofing of toilet area is essential to prevent water damage and maintain hygiene.
Waterproofing involves applying a waterproof membrane or coating to the walls, floors, and joints of the toilet area.
It helps to prevent water leakage, seepage, and dampness, which can lead to structural damage and mold growth.
Various materials like waterproofing membranes, sealants, and grouts are used for effective waterproofing.
Pr...
The circumstances of handing over the flat to Clint
The flat was handed over to Clint after completing all necessary paperwork
The condition of the flat was documented before handing it over to Clint
Keys and access cards were provided to Clint
Any outstanding payments or dues were settled before the handover
I applied via Referral and was interviewed in May 2022. There were 2 interview rounds.
FEED is Front End Engineering Design, the initial phase of engineering design. Hazop & Hazid are safety studies. 3D model is finalised after multiple reviews.
FEED is the initial phase of engineering design where the project scope is defined and preliminary designs are developed.
Hazop & Hazid are safety studies conducted during the design phase to identify and mitigate potential hazards.
SIL (Safety Integrity Level) is a...
I applied via Referral and was interviewed in Sep 2024. There was 1 interview round.
Currently working as a Senior Engineer at XYZ Company, responsible for overseeing project timelines and ensuring quality standards are met.
Overseeing project timelines
Ensuring quality standards are met
Collaborating with team members to troubleshoot issues
Providing technical guidance and support to junior engineers
I have a strong interest in pursuing higher education to further develop my skills and knowledge in engineering.
I believe that continuous learning is essential for professional growth in the engineering field.
Higher education can provide me with advanced technical knowledge and expertise.
Obtaining a master's degree or PhD can open up opportunities for leadership roles and specialized career paths.
I am considering pursu...
I applied via Company Website and was interviewed in May 2024. There were 2 interview rounds.
Gear box replacement work
posted on 25 Jun 2024
I applied via Company Website and was interviewed in May 2024. There were 2 interview rounds.
Reconciliation process of raw material involves comparing the physical inventory with the recorded inventory to identify discrepancies.
Verify the accuracy of raw material receipts and usage records
Compare physical inventory counts with the recorded inventory levels
Investigate and resolve any discrepancies found
Update inventory records accordingly
Implement controls to prevent future discrepancies
posted on 9 Apr 2024
Behaviour based safety is a proactive approach to safety that focuses on changing behaviors to prevent accidents and injuries.
Focuses on changing behaviors to improve safety
Involves observing and addressing at-risk behaviors
Encourages positive reinforcement for safe behaviors
Incorporates training and education on safe practices
Emphasizes employee involvement and ownership of safety
Accident type and analysis techniques involve identifying the type of accidents that occur and analyzing the root causes to prevent future incidents.
Identify common accident types such as slips, trips, falls, machinery accidents, and chemical exposures.
Conduct accident investigations to determine the root causes of incidents.
Use techniques like root cause analysis, fault tree analysis, and fishbone diagrams to analyze ...
I manage unsafe behavior by implementing safety protocols, providing training, conducting regular inspections, and addressing issues promptly.
Implementing safety protocols to prevent unsafe behavior
Providing regular training on safety procedures
Conducting regular inspections to identify potential hazards
Addressing unsafe behavior promptly through corrective actions
Encouraging open communication to address safety concer
I applied via Naukri.com and was interviewed in Oct 2023. There was 1 interview round.
Group Discussion - Operation & Maintenance
posted on 18 Apr 2023
I applied via Walk-in and was interviewed in Mar 2023. There were 3 interview rounds.
Primavera P6 is a project management software that uses critical path method to schedule activities and track progress.
Primavera P6 is a tool used for project planning, scheduling, and control.
It uses critical path method to calculate the longest path of planned activities to determine the project's duration.
It allows users to create a project schedule, assign resources, track progress, and analyze data.
It also has fea...
based on 1 interview
Interview experience
based on 7 reviews
Rating in categories
Engineer
898
salaries
| ₹2.2 L/yr - ₹7 L/yr |
Senior Engineer
848
salaries
| ₹3.2 L/yr - ₹12 L/yr |
Associate Manager
500
salaries
| ₹4.8 L/yr - ₹15.5 L/yr |
Mechanical Engineer
411
salaries
| ₹2 L/yr - ₹9 L/yr |
Civil Engineer
345
salaries
| ₹2.2 L/yr - ₹7.5 L/yr |
Larsen & Toubro Limited
Tata Projects
GMR Group
Hindustan Construction Company