i
Meenaar Global Consultants
Filter interviews by
I applied via Referral
I have knowledge and experience in the oil and gas sector.
I have studied the exploration, production, and refining processes of oil and gas.
I am familiar with the equipment and machinery used in the industry.
I have worked on inspection and maintenance of pipelines, tanks, and other facilities.
I understand the safety regulations and environmental concerns related to the sector.
I have knowledge of the market trends and p...
Top trending discussions
Related to confidence
I applied via Naukri.com and was interviewed in Jan 2024. There were 2 interview rounds.
Brick&Bolt is an online platform that connects homeowners with verified contractors for construction and renovation projects.
Online platform for homeowners and contractors
Connects homeowners with verified contractors
Facilitates construction and renovation projects
Offers a wide range of services such as plumbing, electrical work, painting, etc.
Provides transparency and quality assurance
posted on 6 Nov 2022
I applied via Company Website and was interviewed in Oct 2022. There were 2 interview rounds.
AutoCAD and Aviva are software used for designing.
AutoCAD is a computer-aided design software used for 2D and 3D design and drafting.
Aviva is a structural analysis and design software used for designing buildings and bridges.
Both softwares are widely used in the engineering and architecture industries.
AutoCAD can be used for designing anything from buildings to mechanical parts.
Aviva can be used for analyzing and desig...
I applied via Referral and was interviewed in Oct 2022. There were 2 interview rounds.
posted on 9 May 2022
I applied via Newspaper Ad and was interviewed in Apr 2022. There was 1 interview round.
posted on 24 Jan 2022
I applied via Recruitment Consultant
posted on 10 Nov 2021
I will assess the situation and take necessary actions to minimize the impact on the project timeline.
Check with the supplier for the reason of delay and expected delivery date
Evaluate the impact on the project timeline and inform the project team
Explore alternative options such as sourcing from a different supplier or adjusting the project schedule
Communicate the revised plan to all stakeholders and ensure timely deli...
To calculate cement and sand for 1 sqm cm 1:4, use the formula: (1/5.5) * 1 = 0.18 cubic meters of cement and (4/5.5) * 1 = 0.73 cubic meters of sand.
The ratio of cement to sand is 1:4
Calculate the total volume of the mixture, which is 1 sqm cm
Divide the total volume by the sum of the ratio (1+4=5)
Multiply the quotient by the individual ratio to get the volume of cement and sand
Convert the volume to weight using the de
Price escalation refers to the increase in the price of goods or services over time.
It is a common phenomenon in the market due to inflation, changes in demand and supply, and other economic factors.
Price escalation can also occur due to changes in the cost of production, such as raw material costs, labor costs, and transportation costs.
For example, the price of gasoline may escalate due to an increase in the cost of c...
based on 50 reviews
Rating in categories
Inspection Engineer
53
salaries
| ₹2.4 L/yr - ₹5.1 L/yr |
Site Engineer
13
salaries
| ₹2.3 L/yr - ₹6 L/yr |
Third Party Inspection Engineer
6
salaries
| ₹2.3 L/yr - ₹4 L/yr |
Tpi Inspection Engineer
5
salaries
| ₹4 L/yr - ₹5 L/yr |
Construction Engineer
5
salaries
| ₹3.6 L/yr - ₹5.4 L/yr |
ABC Consultants
Randstad
Team Lease
Quess