i
Brick&Bolt
Filter interviews by
I applied via Naukri.com and was interviewed in Jan 2024. There were 2 interview rounds.
Brick&Bolt is an online platform that connects homeowners with verified contractors for construction and renovation projects.
Online platform for homeowners and contractors
Connects homeowners with verified contractors
Facilitates construction and renovation projects
Offers a wide range of services such as plumbing, electrical work, painting, etc.
Provides transparency and quality assurance
I applied via Job Portal and was interviewed in Oct 2022. There were 2 interview rounds.
I have 5 years of experience as a Vendor Manager in the technology industry.
Managed relationships with multiple vendors and ensured timely delivery of products and services
Negotiated contracts and pricing agreements to optimize cost savings
Implemented vendor performance metrics and conducted regular evaluations
Streamlined vendor onboarding and offboarding processes
Collaborated with cross-functional teams to identify an
Brick & Bolt is a construction technology company that provides end-to-end solutions for building and renovation projects.
Brick & Bolt offers a wide range of services including architectural design, construction, and project management.
They use advanced technology and innovative processes to streamline the construction process and ensure high-quality results.
The company has a network of verified and skilled professiona...
Top trending discussions
I applied via Naukri.com and was interviewed in Jan 2021. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Jul 2020. There were 4 interview rounds.
I applied via Walk-in
About your job, location, CTC
I applied via Walk-in and was interviewed in Apr 2023. There were 2 interview rounds.
Construction procedure involves planning, designing, obtaining permits, site preparation, foundation construction, framing, finishing, and inspections.
Planning and designing the project
Obtaining necessary permits
Site preparation and excavation
Foundation construction
Framing and structural work
Installation of utilities and systems
Finishing touches such as painting and flooring
Final inspections and approvals
Beam lapping position refers to the location where two beams overlap or intersect in a structural element.
Beam lapping position is important for ensuring structural integrity and load-bearing capacity.
Common beam lapping positions include end-to-end, side-by-side, and staggered lapping.
Proper beam lapping position is determined by engineering calculations and design specifications.
The tile procedure is a method used in computer graphics to fill a region with a repeating pattern or image.
The tile procedure involves dividing the region into smaller tiles and filling each tile with the desired pattern or image.
It is commonly used in graphic design software to create seamless textures or backgrounds.
The size and shape of the tiles can be adjusted to achieve different visual effects.
Examples of tile ...
posted on 22 Oct 2024
I applied via Referral and was interviewed before Oct 2023. There was 1 interview round.
Rate analysis for building items involves calculating the cost of materials, labor, and overhead for each item in a construction project.
Rate analysis helps in determining the cost of each building item based on material and labor costs.
It involves breaking down the total cost into components like material cost, labor cost, and overhead expenses.
Rate analysis helps in estimating the total project cost accurately.
For ex...
Material rates of building materials vary based on factors like location, quality, and demand.
Material rates can vary based on the location of the construction site.
The quality of the building materials can also impact the rates.
Demand for certain materials can cause fluctuations in prices.
For example, the rate of cement in urban areas may be higher compared to rural areas.
Higher quality bricks may cost more than lower...
posted on 21 Feb 2022
I have 5 years of experience in management roles, including 2 years as an Assistant Manager.
5 years of management experience
2 years as an Assistant Manager
Successfully led a team of 10 employees
Implemented new strategies to improve productivity and efficiency
Trained and mentored new employees
The thickness of subgrade varies depending on the type of construction and soil conditions.
The thickness of subgrade is determined based on the load-bearing capacity required for the structure.
It is typically measured in inches or centimeters.
For example, in road construction, the subgrade thickness can range from 6 to 12 inches.
In building construction, it may vary from a few inches to several feet depending on the bu
posted on 27 May 2024
I applied via Referral and was interviewed before May 2023. There was 1 interview round.
I applied via Approached by Company and was interviewed in Feb 2023. There were 3 interview rounds.
based on 2 interviews
Interview experience
based on 2 reviews
Rating in categories
5-13 Yrs
Not Disclosed
Site Engineer
33
salaries
| ₹3 L/yr - ₹5.2 L/yr |
Project Manager
32
salaries
| ₹4 L/yr - ₹7.5 L/yr |
Sales Manager
27
salaries
| ₹6.5 L/yr - ₹12.6 L/yr |
Technical Consultant
23
salaries
| ₹6 L/yr - ₹9 L/yr |
Civil Site Engineer
20
salaries
| ₹2.4 L/yr - ₹5 L/yr |
Burns & McDonnell
Mahindra Susten
B.L. Kashyap & Sons
Navayuga Engineering Company