Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Brick&Bolt Team. If you also belong to the team, you can get access from here

Brick&Bolt Verified Tick

Compare button icon Compare button icon Compare
3.9

based on 222 Reviews

Filter interviews by

Brick&Bolt Site Engineer Interview Questions and Answers

Updated 28 Apr 2024

Brick&Bolt Site Engineer Interview Experiences

1 interview found

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 28 Apr 2024

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Conversion CFT into Liters
  • Ans. 

    1 CFT is equal to approximately 28.3168 Liters

    • 1 CFT = 28.3168 Liters

    • To convert CFT to Liters, multiply the volume in CFT by 28.3168

    • For example, 5 CFT is equal to 5 x 28.3168 = 141.584 Liters

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Brick&Bolt Site Engineer interview:
  • Site Engineering
Interview preparation tips for other job seekers - Go with preparation

Site Engineer Jobs at Brick&Bolt

View all

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Mar 2024. There were 9 interview rounds.

Round 1 - HR 

(4 Questions)

  • Q1. This is information to company
  • Q2. This is company sites through
  • Q3. This company is highly growth
  • Q4. This is responsible for the employee
Round 2 - Technical 

(2 Questions)

  • Q1. Bar bending shedule in this question
  • Q2. What are you quality control
  • Ans. 

    Quality control is a process used to ensure that products or services meet specified requirements and standards.

    • Quality control involves inspecting, testing, and evaluating products or services to ensure they meet quality standards.

    • It also includes identifying defects or deviations from specifications and taking corrective actions.

    • Quality control helps to prevent defects, improve processes, and enhance customer satisfa...

  • Answered by AI
Round 3 - Group Discussion 

This is company at the high economy

Round 4 - Aptitude Test 

Number system and latter

Round 5 - Coding Test 

On basis of defined structure

Round 6 - One-on-one 

(1 Question)

  • Q1. The information to company
Round 7 - Case Study 

This check the soil testing

Round 8 - Assignment 

This is growth process in the employee

Round 9 - So interested your job profile 

(1 Question)

  • Q1. I like this with company

Interview Preparation Tips

Interview preparation tips for other job seekers - Yes
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Few basic CE questions and practical case study
  • Q2. Present your self with confidence
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Size of steel used for columns
  • Ans. 

    The size of steel used for columns depends on the load it needs to support and the height of the column.

    • The size of steel columns is typically specified by their dimensions in terms of width, depth, and thickness.

    • The size of steel columns can also be determined based on the structural design calculations and building codes.

    • Common sizes for steel columns include W6x9, W8x10, and W10x12, where the first number represents...

  • Answered by AI
  • Q2. Development bars length
  • Ans. 

    Development bars length refers to the length of reinforcement bars used in construction to provide strength and stability.

    • Development bars length is determined based on structural design requirements.

    • It is important to follow the specifications provided by the structural engineer.

    • The length of development bars can vary depending on the type of structure and load requirements.

    • Proper placement and anchoring of developmen

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jan 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Asking to me...... Only civil engineering questions
  • Q2. Only waste water treatment plants related questions
  • Q3. What is hydro power test of DI pipes...?
  • Ans. 

    Hydro power test of DI pipes is a method to check the strength and integrity of ductile iron pipes under pressure.

    • Hydro power test involves filling the DI pipes with water and pressurizing them to a specified level.

    • The test is conducted to ensure that the pipes can withstand the pressure they will be subjected to in actual use.

    • Leaks or deformations during the test indicate weaknesses in the pipes.

    • The test helps in iden...

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. Only waste water treatment plants related questions
  • Q2. RCC spun related question

I applied via Walk-in and was interviewed in Oct 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Tell me about yourself.
  • Q2. Share details of your previous job.
  • Q3. What are your salary expectations?
Round 3 - Technical 

(1 Question)

  • Q1. Why should provide cable (stress) in bridge
  • Ans. 

    Cable (stress) is provided in bridge to increase its load carrying capacity and improve its stability.

    • Cable (stress) helps to distribute the load of the bridge evenly.

    • It reduces the amount of material required for construction.

    • It also helps to improve the stability of the bridge.

    • Cable (stress) is commonly used in suspension bridges.

    • It allows for longer spans to be constructed without the need for additional support.

    • Cab...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Please all questions answer say with confidently to interviewer .
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Jan 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Basic questions such as experience, last salary, etc
Round 3 - One-on-one 

(1 Question)

  • Q1. Technical Interview usually by manager or higher management. Questions about previous job experience and how well you know your field

Interview Preparation Tips

Interview preparation tips for other job seekers - Good Company for freshers. Can build and boost your career in 3 years.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected

I applied via Walk-in and was interviewed before Jan 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Difference between lap length and development length
  • Ans. 

    Lap length is the overlap of reinforcement bars in concrete, while development length is the length of bar required to transfer stress to concrete.

    • Lap length is used to ensure continuity of reinforcement across a joint or splice in concrete elements.

    • Development length is required to develop the full strength of the reinforcement bar and transfer it to the surrounding concrete.

    • Lap length is typically specified in terms ...

  • Answered by AI
  • Q2. Solid block size 400*400*200mm what is the weight and define
  • Ans. 

    The weight of a solid block with dimensions 400*400*200mm depends on the material it is made of.

    • The weight can be calculated by multiplying the volume of the block by the density of the material.

    • Different materials have different densities, so the weight will vary depending on the material.

    • To calculate the volume, multiply the length, width, and height of the block.

    • To find the weight, multiply the volume by the density...

  • Answered by AI

I applied via Campus Placement and was interviewed in Aug 2021. There were 3 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Civil basic concepts
  • Q2. What isM20,What are the types of steel,Harbour topics etc
  • Ans. 

    M20 is a grade of concrete used in construction. Steel types include mild steel, high tensile steel, and stainless steel. Harbour topics may include dredging, breakwaters, and port design.

    • M20 is a mix of concrete with a compressive strength of 20 MPa

    • Mild steel is commonly used in construction for reinforcement

    • High tensile steel has a higher strength and is used in structures with greater stress

    • Stainless steel is corros...

  • Answered by AI
Round 2 - Technical 

(1 Question)

  • Q1. Types of steel & design codes of construction materials,
  • Ans. 

    Various types of steel and design codes are used in construction materials.

    • Common types of steel include carbon steel, stainless steel, and alloy steel.

    • Design codes for construction materials include ACI, AISC, ASCE, and ASTM.

    • ACI (American Concrete Institute) provides codes for concrete design.

    • AISC (American Institute of Steel Construction) provides codes for steel design.

    • ASCE (American Society of Civil Engineers) prov...

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. Why should we hire you?

Interview Preparation Tips

Topics to prepare for Navayuga Engineering Company Site Engineer interview:
  • Concrete technology
  • Types of machines used in site
  • Strength of materials
Interview preparation tips for other job seekers - We are all well known about our stream basic concepts & Right or wrong be frank open your tongue to answer the interviewer qns
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is the hydrotest pressure? Ans:- 1.5 times of design pressure.
  • Ans. 

    The hydrotest pressure is 1.5 times the design pressure.

    • Hydrotest pressure is the pressure applied to a vessel or pipeline to check for leaks or defects.

    • It is usually done before commissioning the system.

    • For example, if the design pressure is 100 psi, the hydrotest pressure would be 150 psi.

  • Answered by AI
  • Q2. Q:- What is the procedure for fit up inspection? Ans:- Base metal Classification, cleaning, Alignment, Root gap, root face, Bevel angle & mismatch or overlap.
  • Ans. 

    The procedure for fit up inspection includes classification, cleaning, alignment, root gap, root face, bevel angle, and mismatch or overlap.

    • Classify the base metal

    • Clean the surface

    • Align the parts to be joined

    • Check the root gap and root face

    • Measure the bevel angle

    • Check for any mismatch or overlap

    • Ensure all specifications are met

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - You was achieved goal in oil and gas sector and pipe line construction project of CGD.

Brick&Bolt Interview FAQs

How many rounds are there in Brick&Bolt Site Engineer interview?
Brick&Bolt interview process usually has 1 rounds. The most common rounds in the Brick&Bolt interview process are Technical.
How to prepare for Brick&Bolt Site Engineer interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Brick&Bolt. The most common topics and skills that interviewers at Brick&Bolt expect are Site Engineering, Site Execution, AutoCAD 2D, Civil Engineering and Communication Skills.

Tell us how to improve this page.

Brick&Bolt Site Engineer Interview Process

based on 2 interviews

Interview experience

4.5
  
Good
View more
Brick&Bolt Site Engineer Salary
based on 34 salaries
₹3 L/yr - ₹5.2 L/yr
22% more than the average Site Engineer Salary in India
View more details

Brick&Bolt Site Engineer Reviews and Ratings

based on 9 reviews

3.9/5

Rating in categories

3.8

Skill development

3.8

Work-life balance

3.8

Salary

3.7

Job security

3.9

Company culture

3.7

Promotions

3.8

Work satisfaction

Explore 9 Reviews and Ratings
Site Engineer

Pune,

Chennai

+1

2-5 Yrs

₹ 2-3.5 LPA

Explore more jobs
Site Engineer
34 salaries
unlock blur

₹3 L/yr - ₹5.2 L/yr

Project Manager
28 salaries
unlock blur

₹4 L/yr - ₹7.5 L/yr

Sales Manager
25 salaries
unlock blur

₹6.5 L/yr - ₹12.6 L/yr

Technical Consultant
19 salaries
unlock blur

₹6 L/yr - ₹9 L/yr

Civil Site Engineer
18 salaries
unlock blur

₹2.4 L/yr - ₹4.8 L/yr

Explore more salaries
Compare Brick&Bolt with

LivSpace

3.6
Compare

Houzz

4.8
Compare

Urban Company

3.4
Compare

HomeLane

3.5
Compare
Did you find this page helpful?
Yes No
write
Share an Interview