Laxmi Civil Engineering Services Civil Site Engineer Interview Questions and Answers

Updated 13 Dec 2023

7 Interview questions

A Civil Site Engineer was asked
Q. What is the full form of UTM?
Ans. 

UTM stands for Universal Transverse Mercator.

  • UTM is a coordinate system used to locate positions on the Earth's surface.

  • It divides the Earth into 60 zones, each 6 degrees of longitude wide.

  • Each zone has a central meridian and a scale factor to account for the Earth's curvature.

  • UTM coordinates are expressed in meters and consist of an easting and a northing value.

  • UTM is commonly used in mapping, surveying, and navi...

A Civil Site Engineer was asked
Q. What are the different types of curing methods?
Ans. 

Curing is the process of maintaining moisture and temperature conditions for freshly placed concrete.

  • There are various types of curing methods such as water curing, membrane curing, and steam curing.

  • Water curing involves keeping the concrete surface wet by spraying or ponding water.

  • Membrane curing involves covering the concrete surface with a membrane to prevent moisture loss.

  • Steam curing involves applying heat an...

Civil Site Engineer Interview Questions Asked at Other Companies

Q1. What is the minimum grade of concrete used in RCC works?
Q2. If you have a 10x10 feet room and you have 600x600 mm size tiles, ... read more
asked in TCE
Q3. If your M50 concrete's 28-day cube test result is below 100%, wha ... read more
Q4. 1.What is the thickness of plastering?, 2.What is name of plaster ... read more
Q5. What is the shelf life of an open bag of cement?
A Civil Site Engineer was asked
Q. What is a uniformly distributed load?
Ans. 

Uniformly distributed load refers to a load that is evenly distributed over a given area or length.

  • It is a type of load that is applied uniformly across a surface or structure.

  • The magnitude of the load remains constant throughout the area or length.

  • Examples include the weight of evenly distributed vehicles on a bridge or the weight of soil on a retaining wall.

  • Uniformly distributed load is often represented by a lo...

A Civil Site Engineer was asked
Q. How do you calculate the weight of steel?
Ans. 

Steel weight can be calculated by multiplying the volume of steel with its density.

  • Calculate the volume of steel by multiplying its length, width, and height

  • Determine the density of the specific type of steel being used

  • Multiply the volume of steel by its density to get the weight

  • Example: If the volume of steel is 10 cubic meters and its density is 7850 kg/m^3, then the weight would be 78,500 kg

A Civil Site Engineer was asked
Q. What are the minimum and maximum size requirements for columns?
Ans. 

The minimum and maximum size of a column depends on various factors such as load, height, and material used.

  • The minimum size of a column is typically determined by the structural requirements and load-bearing capacity.

  • The maximum size of a column is often limited by practical considerations such as construction methods and available materials.

  • For example, in residential construction, a common minimum size for a co...

A Civil Site Engineer was asked
Q. What is DPC?
Ans. 

DPC stands for Damp Proof Course, which is a layer of material used to prevent moisture from rising up from the ground into a building.

  • DPC is typically made of materials such as bitumen, asphalt, or plastic.

  • It is installed horizontally in the walls of a building, usually at a height of 150mm above ground level.

  • DPC helps to prevent dampness, which can cause structural damage and health problems.

  • It is an important c...

A Civil Site Engineer was asked
Q. What is the standard cube size used for concrete testing?
Ans. 

Cube size in civil engineering typically refers to the dimensions of concrete test cubes used for strength testing.

  • Standard cube size for concrete testing is 150mm x 150mm x 150mm.

  • Other common sizes include 100mm and 200mm cubes, depending on project specifications.

  • Cube size affects the compressive strength results; larger cubes may yield lower strength values.

  • In some countries, 7-day and 28-day strength tests are...

Are these interview questions helpful?

Laxmi Civil Engineering Services Civil Site Engineer Interview Experiences

2 interviews found

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Nov 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Coding Test 

Good job in Laxmi civil eng. company and this very nice

Round 3 - Technical 

(4 Questions)

  • Q1. All technical work
  • Q2. Irrigation work
  • Q3. All civil work this company
  • Q4. This job my family and my child

Interview Preparation Tips

Interview preparation tips for other job seekers - this job in good job

Interview Questionnaire 

7 Questions

  • Q1. What is uniformly distributed load?
  • Ans. 

    Uniformly distributed load refers to a load that is evenly distributed over a given area or length.

    • It is a type of load that is applied uniformly across a surface or structure.

    • The magnitude of the load remains constant throughout the area or length.

    • Examples include the weight of evenly distributed vehicles on a bridge or the weight of soil on a retaining wall.

    • Uniformly distributed load is often represented by a load pe...

  • Answered by AI
  • Q2. What is DPC ?
  • Ans. 

    DPC stands for Damp Proof Course, which is a layer of material used to prevent moisture from rising up from the ground into a building.

    • DPC is typically made of materials such as bitumen, asphalt, or plastic.

    • It is installed horizontally in the walls of a building, usually at a height of 150mm above ground level.

    • DPC helps to prevent dampness, which can cause structural damage and health problems.

    • It is an important compon...

  • Answered by AI
  • Q3. Minimum & maximum size of column?
  • Ans. 

    The minimum and maximum size of a column depends on various factors such as load, height, and material used.

    • The minimum size of a column is typically determined by the structural requirements and load-bearing capacity.

    • The maximum size of a column is often limited by practical considerations such as construction methods and available materials.

    • For example, in residential construction, a common minimum size for a column ...

  • Answered by AI
  • Q4. How to calculate steel weight?
  • Ans. 

    Steel weight can be calculated by multiplying the volume of steel with its density.

    • Calculate the volume of steel by multiplying its length, width, and height

    • Determine the density of the specific type of steel being used

    • Multiply the volume of steel by its density to get the weight

    • Example: If the volume of steel is 10 cubic meters and its density is 7850 kg/m^3, then the weight would be 78,500 kg

  • Answered by AI
  • Q5. Cube size?
  • Ans. 

    Cube size in civil engineering typically refers to the dimensions of concrete test cubes used for strength testing.

    • Standard cube size for concrete testing is 150mm x 150mm x 150mm.

    • Other common sizes include 100mm and 200mm cubes, depending on project specifications.

    • Cube size affects the compressive strength results; larger cubes may yield lower strength values.

    • In some countries, 7-day and 28-day strength tests are perf...

  • Answered by AI
  • Q6. Full form of UTM?
  • Ans. 

    UTM stands for Universal Transverse Mercator.

    • UTM is a coordinate system used to locate positions on the Earth's surface.

    • It divides the Earth into 60 zones, each 6 degrees of longitude wide.

    • Each zone has a central meridian and a scale factor to account for the Earth's curvature.

    • UTM coordinates are expressed in meters and consist of an easting and a northing value.

    • UTM is commonly used in mapping, surveying, and navigatio...

  • Answered by AI
  • Q7. Type of curing?
  • Ans. 

    Curing is the process of maintaining moisture and temperature conditions for freshly placed concrete.

    • There are various types of curing methods such as water curing, membrane curing, and steam curing.

    • Water curing involves keeping the concrete surface wet by spraying or ponding water.

    • Membrane curing involves covering the concrete surface with a membrane to prevent moisture loss.

    • Steam curing involves applying heat and moi...

  • Answered by AI

Skills evaluated in this interview

Top trending discussions

View All
Interview Tips & Stories
1w (edited)
a team lead
Why are women still asked such personal questions in interview?
I recently went for an interview… and honestly, m still trying to process what just happened. Instead of being asked about my skills, experience, or how I could add value to the company… the questions took a totally unexpected turn. The interviewer started asking things like When are you getting married? Are you engaged? And m sure, if I had said I was married, the next question would’ve been How long have you been married? What does my personal life have to do with the job m applying for? This is where I felt the gender discrimination hit hard. These types of questions are so casually thrown at women during interviews but are they ever asked to men? No one asks male candidates if they’re planning a wedding or how old their kids are. So why is it okay to ask women? Can we please stop normalising this kind of behaviour in interviews? Our careers shouldn’t be judged by our relationship status. Period.
Got a question about Laxmi Civil Engineering Services?
Ask anonymously on communities.

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(5 Questions)

  • Q1. How many years of experience in Bridges
  • Q2. You have to selected for this position
  • Q3. Sr Engineer in maharashtra
  • Q4. Ab aur kya kya likhu
  • Q5. Ye ambition chu-t-iya bnata hau

Interview Preparation Tips

Topics to prepare for D.p. Jain & Co. Infrastructure Pvt . Senior Engineer interview:
  • Pile Foundation
Interview preparation tips for other job seekers - You have to lurn more the other
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Questions will be asked on previous company roles and responsibilities.
  • Q2. Depends upon previous experience.
Round 2 - Technical 

(2 Questions)

  • Q1. Basics on structure and finishings
  • Q2. Questions on structure and finishings

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared for what u wrote in resume.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jan 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. What was your previous salary what is your expect
  • Ans. 

    I am unable to provide my previous salary as it is confidential. However, I am expecting a competitive salary based on my qualifications and experience.

    • My previous salary is confidential and I am unable to disclose it.

    • I am expecting a salary that is commensurate with my qualifications and experience.

    • I am open to discussing salary expectations during the negotiation process.

    • I believe that a competitive salary is importa...

  • Answered by AI
  • Q2. Previous salary 1 expected salary 2 whatever.
  • Q3. Educational mass card certificate documents previous salary certificate if you worked

Interview Preparation Tips

Interview preparation tips for other job seekers - Before going to interview take your food eat well don't be scared that person also a human
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Site experiance
  • Q2. Calculation site

Interview Preparation Tips

Interview preparation tips for other job seekers - please call hr
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
-
Result
Selected Selected
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. As per site Question
  • Q2. Just like Crust layer.
  • Q3. Sub base as CTSB CTB AIL DBM BC.
Are these interview questions helpful?
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Mar 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. Site related questions
  • Q2. How to calculate quantity of PQC
  • Ans. 

    Quantity of PQC can be calculated by multiplying area with thickness

    • PQC stands for Pavement Quality Concrete

    • Area is calculated by measuring length and width of the pavement

    • Thickness is usually 150 mm for highways

    • Quantity = Area x Thickness

  • Answered by AI
  • Q3. How to calculate quantity of DBM
  • Ans. 

    Quantity of DBM can be calculated by using the formula: Volume of DBM = Area x Thickness

    • Calculate the area of the road surface to be covered with DBM

    • Determine the required thickness of the DBM layer

    • Multiply the area by the thickness to get the volume of DBM required

    • Consider the wastage factor while calculating the quantity of DBM

    • Use appropriate units of measurement for accuracy

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - You can read MORTH for more information in interview

I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. What is the height of top guard rails,mid rails and toe board rails?
  • Ans. 

    The height of top guard rails, mid rails, and toe board rails varies depending on the specific application and regulations.

    • The height of top guard rails is typically between 42 and 45 inches above the walking surface.

    • Mid rails are typically located halfway between the top rail and the walking surface.

    • Toe board rails are typically between 4 and 6 inches high and are installed at the base of the guardrail system.

    • Specific...

  • Answered by AI
  • Q2. What is safe working load and formula?
  • Ans. 

    Safe working load is the maximum weight a structure or equipment can safely support without risk of failure.

    • SWL is determined by factors such as material strength, design, and intended use.

    • Formula for SWL varies depending on the type of equipment or structure.

    • For example, the SWL formula for a crane may take into account the boom length, angle, and weight distribution.

    • It is important to always follow the manufacturer's...

  • Answered by AI
  • Q3. Job role and duties of HSE engineer
  • Ans. 

    HSE engineers ensure health, safety, and environmental standards are met in various industries to protect workers and the environment.

    • Conduct risk assessments to identify potential hazards in the workplace.

    • Develop and implement safety policies and procedures, such as emergency response plans.

    • Monitor compliance with health and safety regulations, ensuring adherence to local and international standards.

    • Provide training a...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview was good and very soon joining offer was given.

Interview Questionnaire 

6 Questions

  • Q1. They were asked about previous work experience in detail.
  • Q2. Previous Project details.
  • Ans. 

    I have worked on various civil engineering projects, including bridges, highways, and residential buildings, focusing on sustainability.

    • Led the construction of a 500-meter pedestrian bridge, enhancing community connectivity.

    • Managed a highway expansion project that improved traffic flow by 30%.

    • Designed a sustainable residential complex with energy-efficient systems.

    • Collaborated with architects on a mixed-use development...

  • Answered by AI
  • Q3. Previous projects shuttering area and type of formwork
  • Ans. 

    The previous projects involved various types of formwork with a total shuttering area of approximately 10,000 square meters.

    • Used traditional timber formwork for a residential building project

    • Implemented modular steel formwork for a commercial complex

    • Utilized aluminum formwork for a high-rise construction

    • Employed tunnel formwork for an underground structure

  • Answered by AI
  • Q4. Build-up area
  • Q5. About subcontractors billing.
  • Ans. 

    Subcontractor billing involves invoicing for completed work, ensuring accuracy and compliance with contract terms.

    • Review the subcontractor's work against the contract to ensure all billed items are completed.

    • Verify quantities and rates in the invoice match the agreed terms.

    • Ensure that any change orders are documented and included in the billing.

    • Example: If a subcontractor billed for 100 cubic yards of concrete, confirm...

  • Answered by AI
  • Q6. Formwork,steel and masonry work daily productive

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared about your work.

Laxmi Civil Engineering Services Interview FAQs

How many rounds are there in Laxmi Civil Engineering Services Civil Site Engineer interview?
Laxmi Civil Engineering Services interview process usually has 3 rounds. The most common rounds in the Laxmi Civil Engineering Services interview process are Resume Shortlist, Coding Test and Technical.
What are the top questions asked in Laxmi Civil Engineering Services Civil Site Engineer interview?

Some of the top questions asked at the Laxmi Civil Engineering Services Civil Site Engineer interview -

  1. What is uniformly distributed loa...read more
  2. How to calculate steel weigh...read more
  3. Minimum & maximum size of colum...read more

Tell us how to improve this page.

Overall Interview Experience Rating

4.5/5

based on 2 interview experiences

Difficulty level

Easy 100%

Duration

Less than 2 weeks 100%
View more
Laxmi Civil Engineering Services Civil Site Engineer Salary
based on 64 salaries
₹1.9 L/yr - ₹4.9 L/yr
7% less than the average Civil Site Engineer Salary in India
View more details

Laxmi Civil Engineering Services Civil Site Engineer Reviews and Ratings

based on 18 reviews

4.5/5

Rating in categories

4.1

Skill development

4.2

Work-life balance

2.9

Salary

3.9

Job security

4.5

Company culture

3.1

Promotions

4.3

Work satisfaction

Explore 18 Reviews and Ratings
Site Engineer
83 salaries
unlock blur

₹1.8 L/yr - ₹4.5 L/yr

Civil Site Engineer
64 salaries
unlock blur

₹1.9 L/yr - ₹4.9 L/yr

Senior Engineer
41 salaries
unlock blur

₹3.4 L/yr - ₹8.2 L/yr

Assistant Manager
23 salaries
unlock blur

₹4.5 L/yr - ₹10.6 L/yr

Project Manager
21 salaries
unlock blur

₹10 L/yr - ₹17.9 L/yr

Explore more salaries
Compare Laxmi Civil Engineering Services with

Patel Infrastructure

3.8
Compare

CTS Consulting & Technical Support

3.7
Compare

J K Fenner

3.9
Compare

Saudi Binladin Group

4.1
Compare
write
Share an Interview