Upload Button Icon Add office photos

Filter interviews by

Laxmi Civil Engineering Services Assistant Project Manager Interview Questions and Answers

Updated 3 Mar 2024

Laxmi Civil Engineering Services Assistant Project Manager Interview Experiences

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed in Jul 2023. There was 1 interview round.

Round 1 - HR 

(3 Questions)

  • Q1. Hr compliance & Licences
  • Q2. Minimum wages, PF , ESI
  • Q3. Licenses required

Interview Preparation Tips

Topics to prepare for Gaja Engineering Assistant Manager interview:
  • HR Operations
  • HR Administration
Interview preparation tips for other job seekers - Need to improve your best knowledge in hr compliance
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. Interviewer itself don't know what they are asking
Round 2 - HR 

(1 Question)

  • Q1. Interviewer itself don't know what they are asking
Round 3 - Technical 

(1 Question)

  • Q1. Interviewer itself don't know what they are asking
Round 4 - One-on-one 

(1 Question)

  • Q1. Interviewer itself don't know what they are asking

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't prefer gaja waste of time
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Assignment 

Software or tool test

Round 2 - Technical 

(2 Questions)

  • Q1. Related to technical question about fabrication.
  • Q2. Tool related question
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Feb 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Steel and shuttering releted questions
Round 3 - HR 

(1 Question)

  • Q1. Expectation releted questions

Interview Preparation Tips

Interview preparation tips for other job seekers - This company is very good but management is very bed management was not know how to deal with client and how to deal out staff

I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. What is the height of top guard rails,mid rails and toe board rails?
  • Ans. 

    The height of top guard rails, mid rails, and toe board rails varies depending on the specific application and regulations.

    • The height of top guard rails is typically between 42 and 45 inches above the walking surface.

    • Mid rails are typically located halfway between the top rail and the walking surface.

    • Toe board rails are typically between 4 and 6 inches high and are installed at the base of the guardrail system.

    • Specific...

  • Answered by AI
  • Q2. What is safe working load and formula?
  • Ans. 

    Safe working load is the maximum weight a structure or equipment can safely support without risk of failure.

    • SWL is determined by factors such as material strength, design, and intended use.

    • Formula for SWL varies depending on the type of equipment or structure.

    • For example, the SWL formula for a crane may take into account the boom length, angle, and weight distribution.

    • It is important to always follow the manufacturer's...

  • Answered by AI
  • Q3. Job role and duties of HSE engineer

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview was good and very soon joining offer was given.
Round 1 - HR 

(3 Questions)

  • Q1. What are your strengths and weaknesses?
  • Q2. Tell me about yourself.
  • Q3. Very patience. Salary Neagotation.

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company technicaly sound.
Good management.
Good wellfare.
Over all good.

I applied via Approached by Company and was interviewed before Jul 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Planning for execution and laying of bituminous
  • Ans. 

    Planning for execution and laying of bituminous involves detailed scheduling, coordination, and quality control.

    • Develop a detailed project plan outlining tasks, timelines, and resources required

    • Coordinate with suppliers for timely delivery of materials

    • Ensure proper equipment and manpower are available for the execution

    • Implement quality control measures to ensure the final product meets specifications

    • Regularly monitor p...

  • Answered by AI
  • Q2. About bituminous laying

Interview Preparation Tips

Interview preparation tips for other job seekers - Production and asphalt laying
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Apr 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Coding Test 

It was basic level coding question. you can answer if you strong in basic level of java

Round 3 - HR 

(1 Question)

  • Q1. Why CTS? are u willing to work in any location? expected salary?
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. Why are remove the pile head.
  • Ans. 

    Pile heads are removed to allow for further construction or to ensure proper load transfer to the foundation.

    • To prepare for further construction on top of the piles

    • To ensure proper load transfer to the foundation

    • To facilitate the installation of pile caps or beams

    • To adjust the pile length if necessary

  • Answered by AI
  • Q2. How many deduction of 90 degree angle.
  • Ans. 

    There are four deductions of 90 degree angles.

    • A 90 degree angle is formed when two lines intersect at a right angle.

    • In a square, all four angles are 90 degrees.

    • In a rectangle, opposite angles are 90 degrees.

    • In a right triangle, one angle is always 90 degrees.

  • Answered by AI
  • Q3. What is static load test and dynamic load test.
  • Ans. 

    Static load test is used to measure the load capacity of a structure under a constant load, while dynamic load test is used to measure the response of a structure to varying loads.

    • Static load test involves applying a constant load to a structure and measuring its response over time.

    • Dynamic load test involves applying varying loads to a structure to simulate real-life conditions.

    • Static load test helps determine the maxi...

  • Answered by AI
  • Q4. How many tolerance of pile load test.
  • Ans. 

    The number of tolerance of pile load test depends on the specific project requirements and standards.

    • The number of tolerance of pile load test can vary based on the project specifications and standards.

    • Typically, a tolerance of +/- 5% to +/- 10% is considered acceptable for pile load tests.

    • Some projects may have more stringent tolerance requirements depending on the criticality of the structure.

    • It is important to refer...

  • Answered by AI
  • Q5. What is rang Density of bentonite and why is this use.
  • Ans. 

    Bentonite has a range density of 17-22 lb/gal and is used in civil engineering for drilling fluid, grouting, and sealing purposes.

    • Range density of bentonite is typically between 17-22 lb/gal.

    • Bentonite is used in civil engineering for various purposes such as drilling fluid, grouting, and sealing.

    • The range density of bentonite is important for determining its effectiveness in different applications.

    • Higher range density ...

  • Answered by AI

Skills evaluated in this interview

Laxmi Civil Engineering Services Interview FAQs

How many rounds are there in Laxmi Civil Engineering Services Assistant Project Manager interview?
Laxmi Civil Engineering Services interview process usually has 2 rounds. The most common rounds in the Laxmi Civil Engineering Services interview process are Technical and HR.
How to prepare for Laxmi Civil Engineering Services Assistant Project Manager interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Laxmi Civil Engineering Services. The most common topics and skills that interviewers at Laxmi Civil Engineering Services expect are Irrigation, Pipeline, Project Management, Site Execution and Water Supply.

Tell us how to improve this page.

Laxmi Civil Engineering Services Assistant Project Manager Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

J&F Interview Questions
3.7
 • 30 Interviews
Eversendai Interview Questions
3.7
 • 29 Interviews
J K Fenner Interview Questions
3.9
 • 27 Interviews
View all
Laxmi Civil Engineering Services Assistant Project Manager Salary
based on 4 salaries
₹5.6 L/yr - ₹12.5 L/yr
At par with the average Assistant Project Manager Salary in India
View more details

Laxmi Civil Engineering Services Assistant Project Manager Reviews and Ratings

based on 2 reviews

3.5/5

Rating in categories

2.7

Skill development

2.7

Work-life balance

3.5

Salary

2.7

Job security

3.5

Company culture

2.7

Promotions

3.5

Work satisfaction

Explore 2 Reviews and Ratings
Site Engineer
83 salaries
unlock blur

₹1.8 L/yr - ₹4.5 L/yr

Civil Site Engineer
64 salaries
unlock blur

₹1.4 L/yr - ₹4.9 L/yr

Senior Engineer
41 salaries
unlock blur

₹3 L/yr - ₹8.6 L/yr

Assistant Manager
24 salaries
unlock blur

₹4.5 L/yr - ₹10.7 L/yr

Planning & Billing Engineer
18 salaries
unlock blur

₹2 L/yr - ₹6 L/yr

Explore more salaries
Compare Laxmi Civil Engineering Services with

Patel Infrastructure

3.9
Compare

CTS Consulting & Technical Support

3.7
Compare

J K Fenner

3.9
Compare

Saudi Binladin Group

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview