Upload Button Icon Add office photos

Filter interviews by

Laxmi Civil Engineering Services Civil Site Engineer Interview Questions, Process, and Tips

Updated 13 Dec 2023

Top Laxmi Civil Engineering Services Civil Site Engineer Interview Questions and Answers

View all 6 questions

Laxmi Civil Engineering Services Civil Site Engineer Interview Experiences

2 interviews found

Interview Questionnaire 

7 Questions

  • Q1. What is uniformly distributed load?
  • Ans. 

    Uniformly distributed load refers to a load that is evenly distributed over a given area or length.

    • It is a type of load that is applied uniformly across a surface or structure.

    • The magnitude of the load remains constant throughout the area or length.

    • Examples include the weight of evenly distributed vehicles on a bridge or the weight of soil on a retaining wall.

    • Uniformly distributed load is often represented by a load pe

  • Answered by AI
  • Q2. What is DPC ?
  • Ans. 

    DPC stands for Damp Proof Course, which is a layer of material used to prevent moisture from rising up from the ground into a building.

    • DPC is typically made of materials such as bitumen, asphalt, or plastic.

    • It is installed horizontally in the walls of a building, usually at a height of 150mm above ground level.

    • DPC helps to prevent dampness, which can cause structural damage and health problems.

    • It is an important compon...

  • Answered by AI
  • Q3. Minimum & maximum size of column?
  • Ans. 

    The minimum and maximum size of a column depends on various factors such as load, height, and material used.

    • The minimum size of a column is typically determined by the structural requirements and load-bearing capacity.

    • The maximum size of a column is often limited by practical considerations such as construction methods and available materials.

    • For example, in residential construction, a common minimum size for a column ...

  • Answered by AI
  • Q4. How to calculate steel weight?
  • Ans. 

    Steel weight can be calculated by multiplying the volume of steel with its density.

    • Calculate the volume of steel by multiplying its length, width, and height

    • Determine the density of the specific type of steel being used

    • Multiply the volume of steel by its density to get the weight

    • Example: If the volume of steel is 10 cubic meters and its density is 7850 kg/m^3, then the weight would be 78,500 kg

  • Answered by AI
  • Q5. Cube size?
  • Q6. Full form of UTM?
  • Ans. 

    UTM stands for Universal Transverse Mercator.

    • UTM is a coordinate system used to locate positions on the Earth's surface.

    • It divides the Earth into 60 zones, each 6 degrees of longitude wide.

    • Each zone has a central meridian and a scale factor to account for the Earth's curvature.

    • UTM coordinates are expressed in meters and consist of an easting and a northing value.

    • UTM is commonly used in mapping, surveying, and navigatio

  • Answered by AI
  • Q7. Type of curing?
  • Ans. 

    Curing is the process of maintaining moisture and temperature conditions for freshly placed concrete.

    • There are various types of curing methods such as water curing, membrane curing, and steam curing.

    • Water curing involves keeping the concrete surface wet by spraying or ponding water.

    • Membrane curing involves covering the concrete surface with a membrane to prevent moisture loss.

    • Steam curing involves applying heat and moi...

  • Answered by AI

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Nov 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Coding Test 

Good job in Laxmi civil eng. company and this very nice

Round 3 - Technical 

(4 Questions)

  • Q1. All technical work
  • Q2. Irrigation work
  • Q3. All civil work this company
  • Q4. This job my family and my child

Interview Preparation Tips

Interview preparation tips for other job seekers - this job in good job

Civil Site Engineer Interview Questions Asked at Other Companies

Q1. What is the minimum Grade of Concrete used in R.C.C. works?
Q2. If you have 10x10 feet room and you have 600x600 mm size tiles th ... read more
asked in TCE
Q3. If your concrete is M50 and 28 days cube test result is below 100 ... read more
Q4. 1.What is the thickness of plastering?, 2.What is name of plaster ... read more
Q5. What is the time period of open bag cement

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. Why are remove the pile head.
  • Ans. 

    Pile heads are removed to allow for further construction or to ensure proper load transfer to the foundation.

    • To prepare for further construction on top of the piles

    • To ensure proper load transfer to the foundation

    • To facilitate the installation of pile caps or beams

    • To adjust the pile length if necessary

  • Answered by AI
  • Q2. How many deduction of 90 degree angle.
  • Ans. 

    There are four deductions of 90 degree angles.

    • A 90 degree angle is formed when two lines intersect at a right angle.

    • In a square, all four angles are 90 degrees.

    • In a rectangle, opposite angles are 90 degrees.

    • In a right triangle, one angle is always 90 degrees.

  • Answered by AI
  • Q3. What is static load test and dynamic load test.
  • Ans. 

    Static load test is used to measure the load capacity of a structure under a constant load, while dynamic load test is used to measure the response of a structure to varying loads.

    • Static load test involves applying a constant load to a structure and measuring its response over time.

    • Dynamic load test involves applying varying loads to a structure to simulate real-life conditions.

    • Static load test helps determine the maxi...

  • Answered by AI
  • Q4. How many tolerance of pile load test.
  • Ans. 

    The number of tolerance of pile load test depends on the specific project requirements and standards.

    • The number of tolerance of pile load test can vary based on the project specifications and standards.

    • Typically, a tolerance of +/- 5% to +/- 10% is considered acceptable for pile load tests.

    • Some projects may have more stringent tolerance requirements depending on the criticality of the structure.

    • It is important to refer...

  • Answered by AI
  • Q5. What is rang Density of bentonite and why is this use.
  • Ans. 

    Bentonite has a range density of 17-22 lb/gal and is used in civil engineering for drilling fluid, grouting, and sealing purposes.

    • Range density of bentonite is typically between 17-22 lb/gal.

    • Bentonite is used in civil engineering for various purposes such as drilling fluid, grouting, and sealing.

    • The range density of bentonite is important for determining its effectiveness in different applications.

    • Higher range density ...

  • Answered by AI

Skills evaluated in this interview

Interview experience
1
Bad
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jul 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. How much your Salary
  • Ans. 

    My salary is competitive and based on my experience, qualifications, and the current market rates for Civil Site Engineers.

    • My salary is determined by factors such as my level of experience in the field.

    • Qualifications and certifications also play a role in determining my salary.

    • Market rates for Civil Site Engineers in the specific location where I work also influence my salary.

    • I am open to discussing salary expectations

  • Answered by AI
  • Q2. When you Join, We need urgent requirement

Interview Preparation Tips

Interview preparation tips for other job seekers - Bakwas
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Sep 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. 1. Self indirection ? 2. What about the fall ceiling work ? 3. What kind of material using for waterproofing ? 4. What meaning of PPM ? 5. He was supervisor one door key is missing so what can you do ? 6. ...
  • Ans. 

    I am Loganathan Gangadharan I Finished diploma in civil engineering with 10 years experience in Construction Field. Building background to eat not come down

  • Answered Anonymously
Round 3 - Technical 

(4 Questions)

  • Q1. 1. 12 mm Steel Rod using for construction ok that lapping length how much
  • Ans. 

    The lapping length for a 12 mm steel rod used in construction is typically 60 times the diameter of the rod.

    • Lapping length is usually 60 times the diameter of the steel rod

    • For a 12 mm steel rod, the lapping length would be 12 mm x 60 = 720 mm

    • Lapping is done to ensure continuity and strength in the reinforcement

  • Answered by AI
  • Q2. What type of footting using the oman country
  • Ans. 

    In Oman, commonly used footings include spread footings, strip footings, and raft footings.

    • Spread footings are used for individual columns or walls and distribute the load over a larger area.

    • Strip footings are continuous footings that support a line of columns or walls.

    • Raft footings are used for large or irregularly shaped structures to distribute the load over a wider area.

    • In Oman, due to the sandy soil conditions, de...

  • Answered by AI
  • Q3. One concrete floor for broken so rectify the floor what kind of material using
  • Ans. 

    To rectify a broken concrete floor, materials like concrete mix, epoxy resin, or self-leveling compound can be used.

    • Use concrete mix to fill in the broken areas and level the floor.

    • Apply epoxy resin to seal cracks and strengthen the floor.

    • Consider using self-leveling compound for a smooth and even surface.

    • Ensure proper preparation and cleaning of the floor before applying any material.

    • Consult with a structural engineer

  • Answered by AI
  • Q4. Concrete setting times how many days
  • Ans. 

    Concrete setting times can vary depending on factors like temperature and mix design.

    • Concrete typically sets within 24-48 hours, but continues to harden over time.

    • Factors affecting setting time include temperature, humidity, and mix design.

    • For example, in hot weather, concrete may set faster, while in cold weather it may take longer.

    • Accelerators or retarders can be added to the mix to adjust setting times as needed.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Only one advice strong answer
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Dec 2023. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Plz brief himself
Round 2 - Technical 

(2 Questions)

  • Q1. Which type of foundation you done?
  • Ans. 

    I have experience with various types of foundations including shallow foundations, deep foundations, and pile foundations.

    • Shallow foundations: These are used when the soil is stable and can support the load of the structure. Examples include spread footings and mat foundations.

    • Deep foundations: These are used when the soil near the surface is not suitable for supporting the load. Examples include pile foundations and d...

  • Answered by AI
  • Q2. Open foundation or pile foundation

Interview Preparation Tips

Topics to prepare for Patel Infrastructure Civil Site Engineer interview:
  • Foundation
  • Girder
  • Piling
  • Mnb
  • Mjb
  • culverts
  • Flyovers
  • Casting yard
  • Reinforcement
  • Site Execution
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
Selected Selected
Round 1 - Technical 

(5 Questions)

  • Q1. Technical question
  • Q2. Water line Drawing wate tank
  • Q3. Concrete grade & mixing
  • Q4. Slump testing & cube strength
  • Q5. Measurement & drawing map making

Interview Questionnaire 

6 Questions

  • Q1. They were asked about previous work experience in detail.
  • Q2. Previous Project details.
  • Q3. Previous projects shuttering area and type of formwork
  • Ans. 

    The previous projects involved various types of formwork with a total shuttering area of approximately 10,000 square meters.

    • Used traditional timber formwork for a residential building project

    • Implemented modular steel formwork for a commercial complex

    • Utilized aluminum formwork for a high-rise construction

    • Employed tunnel formwork for an underground structure

  • Answered by AI
  • Q4. Build-up area
  • Q5. About subcontractors billing.
  • Q6. Formwork,steel and masonry work daily productive

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared about your work.
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Fair and was interviewed before Jan 2022. There were 7 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. Hard work,.road line..pipe line.. others
  • Q2. Hard work.. road line..pipe line..others
  • Q3. Hard work..road line
Round 2 - Assignment 

Hard work and pipeline roadlines work...

Round 3 - Civil foreman 

(4 Questions)

  • Q1. Hard work..road line pipe line
  • Ans. 

    All machine.(bom loader.jcb.oather) old pipe line area.. new pipe line coverage

  • Answered Anonymously
  • Q2. Hard work..road line pipe line work
  • Q3. Hard work..road line pipe line work ...
  • Q4. Hard work pipe line work
Round 4 - Assignment 

Hard work and pipeline roadlines work..

Round 5 - Technical 

(15 Questions)

  • Q1. Hard work and pipeline roadlines
  • Q2. Hard work and pipeline ..roadlines
  • Q3. Hard work and pipeline roadlines work.
  • Q4. Hard work and pipeline roadlines work..
  • Q5. JCB work road line pipe..
  • Q6. Hard work and pipeline ..roadlines work..
  • Q7. Hard work.. pipe line work..
  • Q8. Hard work and pipeline roadlines ok
  • Q9. Civil foreman complete documents and..
  • Q10. Hard work and JCB work road line pipe line..
  • Q11. Road line pipe line.
  • Q12. Hard work pipe line pipe line
  • Q13. Hard work pipe line..
  • Q14. Hard work road line..
  • Q15. JCB work road line..
Round 6 - Coding Test 

Hard work and pipeline roadlines work..

Round 7 - Coding Test 

Hard work and pipeline roadlines

Interview Preparation Tips

Topics to prepare for Archirodon Civil Foreman interview:
  • Civil foreman
  • Graduate
Interview preparation tips for other job seekers - Civil foreman complete documents and please let me
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jan 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. What was your previous salary what is your expect
  • Ans. 

    I am unable to provide my previous salary as it is confidential. However, I am expecting a competitive salary based on my qualifications and experience.

    • My previous salary is confidential and I am unable to disclose it.

    • I am expecting a salary that is commensurate with my qualifications and experience.

    • I am open to discussing salary expectations during the negotiation process.

    • I believe that a competitive salary is importa...

  • Answered by AI
  • Q2. Previous salary 1 expected salary 2 whatever.
  • Q3. Educational mass card certificate documents previous salary certificate if you worked

Interview Preparation Tips

Interview preparation tips for other job seekers - Before going to interview take your food eat well don't be scared that person also a human

Laxmi Civil Engineering Services Interview FAQs

How many rounds are there in Laxmi Civil Engineering Services Civil Site Engineer interview?
Laxmi Civil Engineering Services interview process usually has 3 rounds. The most common rounds in the Laxmi Civil Engineering Services interview process are Resume Shortlist, Coding Test and Technical.
What are the top questions asked in Laxmi Civil Engineering Services Civil Site Engineer interview?

Some of the top questions asked at the Laxmi Civil Engineering Services Civil Site Engineer interview -

  1. What is uniformly distributed loa...read more
  2. How to calculate steel weigh...read more
  3. Minimum & maximum size of colum...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 Laxmi Civil Engineering Services interview
Job Portal
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.

Interview Questions from Similar Companies

J&F Interview Questions
3.9
 • 29 Interviews
Eversendai Interview Questions
3.9
 • 27 Interviews
J K Fenner Interview Questions
3.9
 • 26 Interviews
View all
Laxmi Civil Engineering Services Civil Site Engineer Salary
based on 63 salaries
₹1.4 L/yr - ₹4.9 L/yr
At par with the average Civil Site Engineer Salary in India
View more details

Laxmi Civil Engineering Services Civil Site Engineer Reviews and Ratings

based on 17 reviews

4.4/5

Rating in categories

4.5

Skill development

4.0

Work-Life balance

3.4

Salary & Benefits

3.9

Job Security

4.3

Company culture

3.6

Promotions/Appraisal

4.1

Work Satisfaction

Explore 17 Reviews and Ratings
Site Engineer
80 salaries
unlock blur

₹1.8 L/yr - ₹4.5 L/yr

Civil Site Engineer
70 salaries
unlock blur

₹1.5 L/yr - ₹4.9 L/yr

Senior Engineer
39 salaries
unlock blur

₹3 L/yr - ₹9.4 L/yr

Assistant Manager
18 salaries
unlock blur

₹4.8 L/yr - ₹8.6 L/yr

Planning & Billing Engineer
16 salaries
unlock blur

₹2 L/yr - ₹6 L/yr

Explore more salaries
Compare Laxmi Civil Engineering Services with

CTS Consulting & Technical Support

3.8
Compare

Patel Infrastructure

3.9
Compare

J K Fenner

3.9
Compare

Saudi Binladin Group

4.2
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview