Filter interviews by
Uniformly distributed load refers to a load that is evenly distributed over a given area or length.
It is a type of load that is applied uniformly across a surface or structure.
The magnitude of the load remains constant throughout the area or length.
Examples include the weight of evenly distributed vehicles on a bridge or the weight of soil on a retaining wall.
Uniformly distributed load is often represented by a load pe
DPC stands for Damp Proof Course, which is a layer of material used to prevent moisture from rising up from the ground into a building.
DPC is typically made of materials such as bitumen, asphalt, or plastic.
It is installed horizontally in the walls of a building, usually at a height of 150mm above ground level.
DPC helps to prevent dampness, which can cause structural damage and health problems.
It is an important compon...
The minimum and maximum size of a column depends on various factors such as load, height, and material used.
The minimum size of a column is typically determined by the structural requirements and load-bearing capacity.
The maximum size of a column is often limited by practical considerations such as construction methods and available materials.
For example, in residential construction, a common minimum size for a column ...
Steel weight can be calculated by multiplying the volume of steel with its density.
Calculate the volume of steel by multiplying its length, width, and height
Determine the density of the specific type of steel being used
Multiply the volume of steel by its density to get the weight
Example: If the volume of steel is 10 cubic meters and its density is 7850 kg/m^3, then the weight would be 78,500 kg
UTM stands for Universal Transverse Mercator.
UTM is a coordinate system used to locate positions on the Earth's surface.
It divides the Earth into 60 zones, each 6 degrees of longitude wide.
Each zone has a central meridian and a scale factor to account for the Earth's curvature.
UTM coordinates are expressed in meters and consist of an easting and a northing value.
UTM is commonly used in mapping, surveying, and navigatio
Curing is the process of maintaining moisture and temperature conditions for freshly placed concrete.
There are various types of curing methods such as water curing, membrane curing, and steam curing.
Water curing involves keeping the concrete surface wet by spraying or ponding water.
Membrane curing involves covering the concrete surface with a membrane to prevent moisture loss.
Steam curing involves applying heat and moi...
I applied via Naukri.com and was interviewed in Nov 2023. There were 3 interview rounds.
Good job in Laxmi civil eng. company and this very nice
Top trending discussions
Pile heads are removed to allow for further construction or to ensure proper load transfer to the foundation.
To prepare for further construction on top of the piles
To ensure proper load transfer to the foundation
To facilitate the installation of pile caps or beams
To adjust the pile length if necessary
There are four deductions of 90 degree angles.
A 90 degree angle is formed when two lines intersect at a right angle.
In a square, all four angles are 90 degrees.
In a rectangle, opposite angles are 90 degrees.
In a right triangle, one angle is always 90 degrees.
Static load test is used to measure the load capacity of a structure under a constant load, while dynamic load test is used to measure the response of a structure to varying loads.
Static load test involves applying a constant load to a structure and measuring its response over time.
Dynamic load test involves applying varying loads to a structure to simulate real-life conditions.
Static load test helps determine the maxi...
The number of tolerance of pile load test depends on the specific project requirements and standards.
The number of tolerance of pile load test can vary based on the project specifications and standards.
Typically, a tolerance of +/- 5% to +/- 10% is considered acceptable for pile load tests.
Some projects may have more stringent tolerance requirements depending on the criticality of the structure.
It is important to refer...
Bentonite has a range density of 17-22 lb/gal and is used in civil engineering for drilling fluid, grouting, and sealing purposes.
Range density of bentonite is typically between 17-22 lb/gal.
Bentonite is used in civil engineering for various purposes such as drilling fluid, grouting, and sealing.
The range density of bentonite is important for determining its effectiveness in different applications.
Higher range density ...
posted on 10 Aug 2024
I applied via Naukri.com and was interviewed in Jul 2024. There was 1 interview round.
My salary is competitive and based on my experience, qualifications, and the current market rates for Civil Site Engineers.
My salary is determined by factors such as my level of experience in the field.
Qualifications and certifications also play a role in determining my salary.
Market rates for Civil Site Engineers in the specific location where I work also influence my salary.
I am open to discussing salary expectations
posted on 27 Oct 2023
I applied via Walk-in and was interviewed in Sep 2023. There were 3 interview rounds.
I am Loganathan Gangadharan I Finished diploma in civil engineering with 10 years experience in Construction Field. Building background to eat not come down
The lapping length for a 12 mm steel rod used in construction is typically 60 times the diameter of the rod.
Lapping length is usually 60 times the diameter of the steel rod
For a 12 mm steel rod, the lapping length would be 12 mm x 60 = 720 mm
Lapping is done to ensure continuity and strength in the reinforcement
In Oman, commonly used footings include spread footings, strip footings, and raft footings.
Spread footings are used for individual columns or walls and distribute the load over a larger area.
Strip footings are continuous footings that support a line of columns or walls.
Raft footings are used for large or irregularly shaped structures to distribute the load over a wider area.
In Oman, due to the sandy soil conditions, de...
To rectify a broken concrete floor, materials like concrete mix, epoxy resin, or self-leveling compound can be used.
Use concrete mix to fill in the broken areas and level the floor.
Apply epoxy resin to seal cracks and strengthen the floor.
Consider using self-leveling compound for a smooth and even surface.
Ensure proper preparation and cleaning of the floor before applying any material.
Consult with a structural engineer
Concrete setting times can vary depending on factors like temperature and mix design.
Concrete typically sets within 24-48 hours, but continues to harden over time.
Factors affecting setting time include temperature, humidity, and mix design.
For example, in hot weather, concrete may set faster, while in cold weather it may take longer.
Accelerators or retarders can be added to the mix to adjust setting times as needed.
posted on 29 Jan 2024
I applied via Recruitment Consulltant and was interviewed in Dec 2023. There were 2 interview rounds.
I have experience with various types of foundations including shallow foundations, deep foundations, and pile foundations.
Shallow foundations: These are used when the soil is stable and can support the load of the structure. Examples include spread footings and mat foundations.
Deep foundations: These are used when the soil near the surface is not suitable for supporting the load. Examples include pile foundations and d...
posted on 2 Mar 2024
The previous projects involved various types of formwork with a total shuttering area of approximately 10,000 square meters.
Used traditional timber formwork for a residential building project
Implemented modular steel formwork for a commercial complex
Utilized aluminum formwork for a high-rise construction
Employed tunnel formwork for an underground structure
I applied via Job Fair and was interviewed before Jan 2022. There were 7 interview rounds.
Hard work and pipeline roadlines work...
All machine.(bom loader.jcb.oather) old pipe line area.. new pipe line coverage
Hard work and pipeline roadlines work..
Hard work and pipeline roadlines work..
Hard work and pipeline roadlines
I applied via Walk-in and was interviewed before Jan 2022. There were 2 interview rounds.
I am unable to provide my previous salary as it is confidential. However, I am expecting a competitive salary based on my qualifications and experience.
My previous salary is confidential and I am unable to disclose it.
I am expecting a salary that is commensurate with my qualifications and experience.
I am open to discussing salary expectations during the negotiation process.
I believe that a competitive salary is importa...
based on 17 reviews
Rating in categories
Site Engineer
80
salaries
| ₹1.8 L/yr - ₹4.5 L/yr |
Civil Site Engineer
70
salaries
| ₹1.5 L/yr - ₹4.9 L/yr |
Senior Engineer
39
salaries
| ₹3 L/yr - ₹9.4 L/yr |
Assistant Manager
18
salaries
| ₹4.8 L/yr - ₹8.6 L/yr |
Planning & Billing Engineer
16
salaries
| ₹2 L/yr - ₹6 L/yr |
CTS Consulting & Technical Support
Patel Infrastructure
J K Fenner
Saudi Binladin Group