Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by L&T Transportation Infrastructure Team. If you also belong to the team, you can get access from here

L&T Transportation Infrastructure Verified Tick

Compare button icon Compare button icon Compare
4.6

based on 269 Reviews

Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards

zig zag pattern zig zag pattern

Filter interviews by

L&T Transportation Infrastructure Interview Questions and Answers

Updated 22 Jan 2025

L&T Transportation Infrastructure Interview Experiences

Popular Designations

7 interviews found

Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via lnt and was interviewed in Nov 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. About job experience and machine knowldege

Interview Preparation Tips

Interview preparation tips for other job seekers - get expert in your field.

Senior Manager Interview Questions asked at other Companies

Q1. 1. What you understand the requirement of shuttering material at project site?
View answer (19)

MEP Supervisor Interview Questions & Answers

user image MOHAMMAD ASIF

posted on 20 Jun 2023

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in May 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Group Discussion 

1. Discussion on how to lead group and manage a group.
2. How to achieve and reach organization goal and aim

Round 3 - HR 

(3 Questions)

  • Q1. Why we are hiring you?
  • Ans. It's your right to know who am I and what is my capability, I am seeking job and I get it, my academic knowledge and technical skill provide me best for this position, most important think for me be honest to our organization and fullfill the organization requirement and and work with full dedication.
  • Answered by MOHAMMAD ASIF
  • Q2. If we are rejected you, what you want to do?
  • Ans. Thank you very much for giving me a change to show me what I am, what is my capabilities and what I know. I will prepare more and also upgrade my technical skills to fit out for this position. It's promise to myself I will more stronger.
  • Answered by MOHAMMAD ASIF
  • Q3. What you will do, if your project or site have delay by committing date.
  • Ans. It's my thought, First find out root cause, where we are late or delay, after that we plan properly with force of work man and needed materials and collect the progressive and productivity reports daily.
  • Answered by MOHAMMAD ASIF

Interview Preparation Tips

Interview preparation tips for other job seekers - Be natural don't over thinking.
Always upgrade your knowledge and skill.

MEP Supervisor Interview Questions asked at other Companies

Q1. What is the name of fire alarm cable and why we need to use of it ?
View answer (1)
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Tell me about a time you made a mistake and how you dealt with it.Describe a time you dealt with a difficult colleague and how you resolve it.
  • Q2. If a mistake is made,a lesson should be learned from it but the same mistake should not be repeated

Electrical Supervisor Interview Questions asked at other Companies

Q1. Tell me about HT LT and Dg Transformer, how to do load changeover
View answer (1)
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Jan 2024.

Round 1 - HR 

(2 Questions)

  • Q1. Where do you work at present?
  • Ans. 

    I currently work as a research assistant at a university lab.

    • Conducting experiments and collecting data

    • Assisting with research projects

    • Collaborating with other team members

    • Analyzing results and writing reports

  • Answered by AI
  • Q2. What work are you doing?
  • Ans. 

    I am currently working on designing and testing a new software system for a manufacturing company.

    • Designing a software system for a manufacturing company

    • Testing the functionality and performance of the software

    • Collaborating with team members to ensure project success

  • Answered by AI
Round 2 - Group Discussion 

Pollution is the introduction of harmful materials into the environment. These harmful materials are called pollutants. Pollutants can be natural, such as volcanic ash. They can also be created by human activity, such as trash or runoff produced by factories. Pollutants damage the quality of air, water, and land

Round 3 - Technical 

(2 Questions)

  • Q1. The motion of the cam is transferred to the valves through
  • Q2. Which of the following symptom is caused as a result of brake disc run out ?
  • Ans. 

    Vibration while braking

    • Vibration felt in the steering wheel

    • Uneven wear on brake pads

    • Squealing noise while braking

  • Answered by AI

Engineering Intern Interview Questions asked at other Companies

Q1. What the final product of blast furnace? What is the composition of the iron produced and the source of high content of P? And how to reduce the content?
View answer (1)

L&T Transportation Infrastructure interview questions for popular designations

 Construction Manager Civil

 (1)

 Deputy General Manager HR

 (1)

 Electrical Supervisor

 (1)

 Engineering Intern

 (1)

 MEP Supervisor

 (1)

 QA/QC Civil Engineer

 (1)

 Senior Manager

 (1)

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via L&T and was interviewed before Jan 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. All technical aspect of road design were covered.

Construction Manager Civil Interview Questions asked at other Companies

Q1. How much cost it would be for 25 acre land boundary wall
View answer (1)

I applied via Campus Placement and was interviewed before Sep 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Aptitude Test 

Easy to moderate type non verbal reasoning.

Round 3 - One-on-one 

(2 Questions)

  • Q1. HR Round: Basic questions like introduction, able to relocate or not etc.
  • Q2. Technical: Basic questions (easy to moderate level) from RCC Design, Concrete Technology , SOM , Highway Engg etc

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep your basic concepts clear on your domain. Be confident, don't get nervous. Answer to the point and be straight forward.
Good luck!!

QA/QC Civil Engineer Interview Questions asked at other Companies

Q1. What to do when any building material come at site, and their testing.
View answer (1)

I applied via Job Portal and was interviewed before Jun 2021. There were 2 interview rounds.

Round 1 - Technical 

(4 Questions)

  • Q1. About your family background, education, experience
  • Q2. Which is you area of interest in HR
  • Q3. What are your achievements that you are proud of?
  • Q4. How do you manage your stake holders
Round 2 - Meeting With Board Member 

(1 Question)

  • Q1. Casual interaction with head of business.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident
Do not beat around the bush if you could not answer

Deputy General Manager HR Interview Questions asked at other Companies

Q1. Can you know the legal entity in handling the employees
View answer (1)

Interview questions from similar companies

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(5 Questions)

  • Q1. What are the standards for scaffolding codes?
  • Q2. What are the different types of scaffolding erection?
  • Q3. What type of use material for safety purchase
  • Q4. How to safe Erection
  • Q5. Identify risk and hazard

Interview Preparation Tips

Interview preparation tips for other job seekers - We are erecting scaffolding according to the company's standards.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Company Website and was interviewed in Dec 2024. There were 2 interview rounds.

Round 1 - Assignment 

Proper reconciliation weakly and monthly Achive target

Round 2 - Technical 

(11 Questions)

  • Q1. All pendency work clear any way
  • Q2. Proper Quality with safty PPEs
  • Q3. Who to increase team for work
  • Q4. No leave without information
  • Q5. Achive your target
  • Q6. Completed target with time monthly
  • Q7. Performance with your senior is good and respected
  • Q8. Achive my target with time period
  • Q9. Maintain all work with Group discous
  • Q10. Achive target with Team work
  • Q11. Submitted data all with senior and company

Interview Preparation Tips

Interview preparation tips for other job seekers - Pls consider my Resume Dear mam's/ Sir

If there is any vacancy then please consider my resume.

Deputy Regional Planning Manager Interview Questions & Answers

Shapoorji Pallonji Group user image Anonymous

posted on 7 Dec 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via Naukri.com

Round 1 - Technical 

(10 Questions)

  • Q1. Brief about your education, career, previous projects handled, and role & responsibility in past organisations?
  • Q2. Current roles & responsibilities and value addition done by you and your team?
  • Q3. Process flow for planning throughout project life-cycle?
  • Q4. Critical/concerning areas to be monitored?
  • Q5. Productivity and permissible material wastage, process to prepare material reconciliation?
  • Q6. Understanding about claim and type of claim raised/supported to raise in past experience?
  • Q7. Experience of technical aspects and planning assessment required at tendering stage, capabilities to prepare tender submittals and proving insights to management on same?
  • Q8. Necessity of providing PMO support to management?
  • Q9. Understanding about role & responsibility of regional planning manager?
  • Q10. MIS and type of reports prepared in past and their significance for Top managemennt?

L&T Transportation Infrastructure Interview FAQs

How many rounds are there in L&T Transportation Infrastructure interview?
L&T Transportation Infrastructure interview process usually has 2-3 rounds. The most common rounds in the L&T Transportation Infrastructure interview process are Technical, Resume Shortlist and HR.
What are the top questions asked in L&T Transportation Infrastructure interview?

Some of the top questions asked at the L&T Transportation Infrastructure interview -

  1. Which of the following symptom is caused as a result of brake disc run ou...read more
  2. If a mistake is made,a lesson should be learned from it but the same mistake sh...read more
  3. Technical: Basic questions (easy to moderate level) from RCC Design, Concrete T...read more

Tell us how to improve this page.

L&T Transportation Infrastructure Interview Process

based on 7 interviews

Interview experience

4.6
  
Excellent
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 411 Interviews
GMR Group Interview Questions
4.1
 • 76 Interviews
Ashoka Buildcon Interview Questions
4.1
 • 64 Interviews
View all

L&T Transportation Infrastructure Reviews and Ratings

based on 269 reviews

4.6/5

Rating in categories

4.6

Skill development

4.0

Work-life balance

4.2

Salary

4.6

Job security

4.3

Company culture

4.2

Promotions

4.3

Work satisfaction

Explore 269 Reviews and Ratings
Assistant Construction Manager
8 salaries
unlock blur

₹6.7 L/yr - ₹20 L/yr

Senior Civil Engineer
5 salaries
unlock blur

₹2.7 L/yr - ₹6.5 L/yr

Civil Engineer
5 salaries
unlock blur

₹2.2 L/yr - ₹6.2 L/yr

Senior Design Engineer
5 salaries
unlock blur

₹5.5 L/yr - ₹6.8 L/yr

Planning Manager
5 salaries
unlock blur

₹15 L/yr - ₹18 L/yr

Explore more salaries
Compare L&T Transportation Infrastructure with

Reliance Infrastructure

4.1
Compare

GMR Group

4.1
Compare

Adani Ports and SEZ

3.9
Compare

IRB Infrastructure

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview