Upload Button Icon Add office photos

Filter interviews by

Larsen & Toubro Group Civil Site Engineer Interview Questions and Answers

Updated 28 Sep 2022

Larsen & Toubro Group Civil Site Engineer Interview Experiences

2 interviews found

I applied via Walk-in and was interviewed in Aug 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Pile foundation flyover pile cap peircap
  • Q2. Pile foundation pile cap paircap pair
  • Q3. Foundation structure
Round 3 - Technical 

(3 Questions)

  • Q1. Pile foundation pairs paircap
  • Q2. Structure related flyover
  • Q3. Site excavations pile

Interview Preparation Tips

Interview preparation tips for other job seekers - Decision-making
Project planning
Task delegation
Team communication
Team leadership
Round 1 - Technical 

(2 Questions)

  • Q1. Related to codes related to morth
  • Q2. Site knowledge & management skills

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident always , take your time to answer .. tension free

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. How many types of the grades of concrete
  • Ans. 

    There are different grades of concrete used in construction based on strength and durability requirements.

    • Concrete grades are classified based on their compressive strength, such as M20, M30, etc.

    • The 'M' stands for mix design, followed by the compressive strength in N/mm^2.

    • Higher grade concrete is used for structures requiring higher strength, such as bridges and high-rise buildings.

    • Lower grade concrete is used for non...

  • Answered by AI
  • Q2. What is honeycomb
  • Ans. 

    Honeycomb is a structure made up of hexagonal cells, similar to those found in beehives.

    • Honeycomb structures are commonly used in engineering for their strength and light weight.

    • The hexagonal shape of honeycomb cells allows for efficient use of material.

    • Examples of honeycomb structures include honeycomb core panels used in aerospace industry and honeycomb grids used in civil engineering for soil stabilization.

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Larsen & Toubro Limited Civil Site Engineer interview:
  • Building materials
Interview preparation tips for other job seekers - I want to work and gain skills from construction field.
Interview experience
3
Average
Difficulty level
Easy
Process Duration
-
Result
Selected Selected

I applied via Campus Placement

Round 1 - Technical 

(2 Questions)

  • Q1. What is the overlap
  • Ans. 

    Overlap refers to the area where two or more elements share common space or features.

    • Overlap occurs when two or more elements occupy the same physical space or have common characteristics.

    • In civil engineering, overlap can refer to the area where two construction elements meet, such as overlapping rebar in a concrete structure.

    • Overlap can also occur in surveying when two survey lines intersect or overlap each other.

    • Prop...

  • Answered by AI
  • Q2. Why do you overlap
  • Ans. 

    Overlapping in civil engineering is done to ensure proper continuity and strength in construction.

    • Overlapping is done to ensure continuity of reinforcement bars in concrete structures.

    • It helps in distributing the load evenly and prevents sudden failure.

    • Overlapping also helps in providing the required strength to the structure.

    • Proper overlapping ensures that the structure can withstand various stresses and forces.

    • For ex...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Jun 2024. There were 2 interview rounds.

Round 1 - Group Discussion 

Face to face interview

Round 2 - Technical 

(5 Questions)

  • Q1. What is the BBS and Survey
  • Ans. 

    BBS stands for Bar Bending Schedule and Survey refers to the process of measuring and mapping an area.

    • BBS is a document that provides details of reinforcement cutting length, type, and bending shape for construction.

    • Survey involves measuring and mapping land to determine boundaries, elevations, and other important information.

    • Both BBS and Survey are crucial in the construction industry to ensure accurate and efficient

  • Answered by AI
  • Q2. What is the estimation
  • Ans. 

    Estimation is the process of calculating the quantities and costs of materials, labor, and equipment required for a construction project.

    • Estimation involves determining the quantities of materials needed for a project.

    • It also includes calculating the labor hours required for the project.

    • Estimation considers the costs of equipment and other resources needed for the project.

    • Estimation helps in creating a budget and timel

  • Answered by AI
  • Q3. What is the soil test
  • Ans. 

    Soil test is a process of analyzing the properties of soil to determine its suitability for construction purposes.

    • Soil tests help in determining the strength, permeability, compaction, and other important properties of soil.

    • Different types of soil tests include sieve analysis, moisture content test, proctor compaction test, etc.

    • Results of soil tests help in designing foundations, pavements, retaining walls, and other s...

  • Answered by AI
  • Q4. What is the RCC
  • Ans. 

    RCC stands for Reinforced Cement Concrete, a composite material made of concrete and steel reinforcement.

    • RCC is a versatile construction material used in buildings, bridges, dams, etc.

    • It combines the compressive strength of concrete with the tensile strength of steel reinforcement.

    • RCC elements include beams, columns, slabs, and foundations.

    • Example: RCC beams are used to support the load of the structure and transfer it...

  • Answered by AI
  • Q5. What is the DPR
  • Ans. 

    DPR stands for Detailed Project Report, which is a comprehensive document that outlines the details of a construction project.

    • DPR includes information on project scope, objectives, cost estimates, timelines, resources, and potential risks.

    • It serves as a roadmap for the project, guiding the engineers and stakeholders throughout the construction process.

    • DPR is crucial for obtaining approvals, funding, and ensuring the su...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
Selected Selected

I applied via Company Website

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(6 Questions)

  • Q1. The in - person interviews usually begin with a one on one interview with the hiring manager
  • Ans. Early interviews are typically one on one in person interviews between the application and the hiring manager.
  • Answered Anonymously
  • Q2. Introduce yourself.
  • Ans. 

    I am a Civil Site Engineer with experience in managing construction projects and ensuring their successful completion.

    • I have a Bachelor's degree in Civil Engineering from XYZ University.

    • I have worked on various construction projects, including residential and commercial buildings.

    • I am proficient in using AutoCAD and other design software.

    • I have strong project management skills and can effectively coordinate with contra...

  • Answered by AI
  • Q3. Helps to make the candidate friendly with the environment.
  • Q4. What is safety equipment .use for site.
  • Ans. 

    Safety equipment is used on construction sites to protect workers from potential hazards and accidents.

    • Personal protective equipment (PPE) such as hard hats, safety glasses, and gloves

    • Safety harnesses and fall protection systems for working at heights

    • Earplugs or earmuffs to protect against loud noises

    • Respirators or masks for protection against dust, fumes, or hazardous substances

    • Safety signs and barricades to warn and ...

  • Answered by AI
  • Q5. What are the standards used for plant layout in reference.
  • Ans. 

    Standards for plant layout in civil engineering include OSHA regulations, industry best practices, and client requirements.

    • OSHA regulations set guidelines for safety in plant layout design

    • Industry best practices ensure efficient use of space and resources

    • Client requirements may include specific equipment placement or workflow needs

  • Answered by AI
  • Q6. What we do for shortage of material received.
  • Ans. 

    In case of shortage of material received, we can take the following actions:

    • Contact the supplier to inquire about the shortage and request immediate delivery of the remaining material.

    • Check if there are any alternative suppliers who can provide the required material.

    • Evaluate the possibility of using substitute materials or adjusting the design to accommodate the shortage.

    • Prioritize the use of available material for cri...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Highlight your relevant experience and skills that match the job description.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Not Selected

I applied via Company Website and was interviewed in Apr 2024. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. What is the nominal brick size?
  • Ans. 

    The nominal brick size is typically 90 mm x 90 mm x 90 mm.

    • Nominal brick size is commonly 90 mm x 90 mm x 90 mm.

    • It may vary slightly depending on the country or region.

    • Brick sizes are standardized for construction purposes.

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Mar 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. I B. Tech degree I tunnel work for 4 years work experience I hard work of duty
  • Q2. I waiting for megha engineering and infrastructure
  • Q3. I will b resume send megha engineering and infrastructure and response me
  • Q4. I waiting megha engineering and infrastructure

Interview Preparation Tips

Topics to prepare for Afcons Infrastructure Civil Site Engineer interview:
  • 4 years
Interview preparation tips for other job seekers - I am interested job civil site engineer
Tunnel work
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Oct 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - Aptitude Test 

Online exam 50 marks in VC.

Round 3 - HR 

(2 Questions)

  • Q1. Current job responsibilities, CTC.
  • Q2. Methodology about Finishing work like Tiles work, Paint, False ceiling.

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical knowledge about your branches.
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Sir B.E civil engineer hai Mere job nhi laga DBL company me training deye RE Wall Four lanning of mangalwedh_Solapur section of NH_166 Pkg in the state of Maharashtra
  • Q2. Mere DBL company me job nhi laga

Interview Preparation Tips

Interview preparation tips for other job seekers - Hindi

Larsen & Toubro Group Interview FAQs

How many rounds are there in Larsen & Toubro Group Civil Site Engineer interview?
Larsen & Toubro Group interview process usually has 2 rounds. The most common rounds in the Larsen & Toubro Group interview process are Technical, Resume Shortlist and HR.
What are the top questions asked in Larsen & Toubro Group Civil Site Engineer interview?

Some of the top questions asked at the Larsen & Toubro Group Civil Site Engineer interview -

  1. Related to codes related to mo...read more
  2. Pile foundation flyover pile cap peir...read more
  3. Pile foundation pile cap paircap p...read more

Tell us how to improve this page.

People are getting interviews through

based on 1 Larsen & Toubro Group interview
WalkIn
100%
Low Confidence
?
Low Confidence means the data is based on a small number of responses received from the candidates.
Larsen & Toubro Group Civil Site Engineer Salary
based on 9 salaries
₹3 L/yr - ₹7.5 L/yr
64% more than the average Civil Site Engineer Salary in India
View more details

Larsen & Toubro Group Civil Site Engineer Reviews and Ratings

based on 2 reviews

4.6/5

Rating in categories

4.6

Skill development

4.6

Work-Life balance

4.2

Salary & Benefits

3.5

Job Security

4.2

Company culture

4.2

Promotions/Appraisal

5.0

Work Satisfaction

Explore 2 Reviews and Ratings
Graduate Engineer Trainee (Get)
48 salaries
unlock blur

₹5 L/yr - ₹7 L/yr

Assistant Manager
37 salaries
unlock blur

₹6.2 L/yr - ₹19.7 L/yr

Senior Software Engineer
28 salaries
unlock blur

₹9 L/yr - ₹25.1 L/yr

Software Engineer
20 salaries
unlock blur

₹4.8 L/yr - ₹24 L/yr

Senior Engineer
19 salaries
unlock blur

₹5.6 L/yr - ₹12.1 L/yr

Explore more salaries
Compare Larsen & Toubro Group with

Tata Group

4.2
Compare

Reliance Industries

4.0
Compare

Adani Group

3.9
Compare

Mahindra & Mahindra

4.1
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview