Upload Button Icon Add office photos

Filter interviews by

L&T Construction Welding Foreman Interview Questions and Answers

Updated 11 Dec 2023

L&T Construction Welding Foreman Interview Experiences

1 interview found

Welding Foreman Interview Questions & Answers

user image Gaurishankar Yadav

posted on 11 Dec 2023

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Welding quality related

Round 3 - Technical 

(2 Questions)

  • Q1. Wedding related
  • Q2. Welding qc related

Interview Preparation Tips

Interview preparation tips for other job seekers - Welding quality qc

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Mar 2024. There were 3 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. How to check beam reinforcement?
  • Ans. 

    Beam reinforcement can be checked by visually inspecting the placement, size, and spacing of the steel bars within the beam.

    • Visually inspect the placement of steel bars within the beam to ensure they are in the correct position as per the design drawings.

    • Check the size of the steel bars to ensure they meet the specifications outlined in the structural drawings.

    • Verify the spacing between the steel bars to ensure they ar...

  • Answered by AI
  • Q2. What is the minimum dia rebar of column?
  • Ans. 

    The minimum diameter of rebar for a column depends on the structural design and load requirements.

    • The minimum diameter of rebar for a column is typically specified in the structural drawings or design documents.

    • Common minimum diameters for column rebars range from 12mm to 25mm, depending on the size and load-bearing capacity of the column.

    • The minimum diameter of rebar is important for ensuring the structural integrity ...

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. Cover of reinforcement of slab?
  • Ans. 

    Cover of reinforcement of slab refers to the distance between the outer surface of the concrete and the reinforcement bars.

    • The cover of reinforcement is important for protecting the reinforcement from corrosion and ensuring structural integrity.

    • The typical cover of reinforcement for slabs is around 20-30mm, but it can vary depending on the design requirements.

    • Factors such as exposure conditions, concrete quality, and l...

  • Answered by AI
  • Q2. How to calculate of concrete quantity?
  • Ans. 

    Concrete quantity can be calculated by multiplying the volume of the area to be filled by the density of the concrete.

    • Calculate the volume of the area to be filled (length x width x height)

    • Determine the density of the concrete (usually around 2400 kg/m^3)

    • Multiply the volume by the density to get the total concrete quantity needed

    • Consider adding a percentage for wastage or spillage

  • Answered by AI
Round 3 - Technical 

(2 Questions)

  • Q1. Type of bricks joint?
  • Ans. 

    There are various types of brick joints used in construction, such as flush joint, raked joint, weathered joint, and v-joint.

    • Flush joint is a joint where the mortar is flush with the face of the brick.

    • Raked joint is a joint where the mortar is recessed slightly from the face of the brick.

    • Weathered joint is a joint where the mortar is sloped to allow water to run off.

    • V-joint is a joint where the mortar is shaped like a

  • Answered by AI
  • Q2. Type of bricks,?
  • Ans. 

    There are various types of bricks used in construction, such as clay bricks, concrete bricks, and fire bricks.

    • Clay bricks are made from clay and are commonly used for construction.

    • Concrete bricks are made from concrete and are known for their strength and durability.

    • Fire bricks are made to withstand high temperatures and are used in fireplaces and kilns.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - I know the civil work. It' s very good.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(1 Question)

  • Q1. How many type gaskets
  • Ans. 

    There are several types of gaskets used in piping, including spiral wound, ring joint, and sheet gaskets.

    • Spiral wound gaskets are commonly used for high pressure and temperature applications.

    • Ring joint gaskets are used in high pressure and high temperature applications, typically in oil and gas industries.

    • Sheet gaskets are versatile and come in various materials such as rubber, cork, and graphite.

  • Answered by AI

I applied via Company Website and was interviewed in Nov 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Sariya setting

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview date and time.

I applied via Approached by company and was interviewed before Jan 2021. There were 7 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(2 Questions)

  • Q1. Tell me about yourself.
  • Q2. What are your salary expected
Round 3 - Group Discussion 

Before work with him

Round 4 - HR 

(2 Questions)

  • Q1. Share details of your previous job.
  • Q2. Power project complete
Round 5 - HR 

(3 Questions)

  • Q1. Tell me about yourself.
  • Q2. Manoj roy civil foreman
  • Q3. Before work with us?
Round 6 - Technical 

(3 Questions)

  • Q1. How many labour you control?
  • Ans. 

    I currently supervise a team of 15 skilled and unskilled labourers.

    • I am responsible for managing the work of 15 labourers.

    • I ensure that they are following safety protocols and completing tasks on time.

    • I assign tasks to each labourer based on their skills and experience.

    • I provide training and guidance to new labourers.

    • I maintain a positive and productive work environment.

    • Examples: I have supervised teams of up to 50 lab...

  • Answered by AI
  • Q2. Me minimum 100 labour
  • Q3. Very good thanks you
Round 7 - HR 

(2 Questions)

  • Q1. Tell me about yourself.
  • Q2. What about your site work

Interview Preparation Tips

Interview preparation tips for other job seekers - I will give best my knowledge

I applied via Recruitment Consultant and was interviewed before Apr 2020. There was 1 interview round.

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview Technical so need good knowledge and communication and Experience
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(3 Questions)

  • Q1. Casting ke liye kya chahiye
  • Q2. Sariya ka daya kitne hote hai
  • Q3. Setring ko kaise redi karte hai
Round 2 - One-on-one 

(1 Question)

  • Q1. Igadar kya hai aur t gatar me antar

Interview Questionnaire 

3 Questions

  • Q1. Road me civil structural engineering
  • Q2. Road civil structural
  • Q3. Sheet piling

Interview Preparation Tips

Interview preparation tips for other job seekers - Road safety and structural all questions
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Walk-in and was interviewed in Jul 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Shuttering releted
Round 3 - One-on-one 

(6 Questions)

  • Q1. Shuttering for foundation & slab
  • Ans. 

    Shuttering is a temporary structure used to support concrete while it sets for foundation & slab construction.

    • Shuttering is also known as formwork and is typically made of wood, steel, or plastic.

    • It is essential for creating the desired shape and structure of the foundation and slab.

    • Properly installed shuttering ensures the concrete is poured and cured correctly.

    • Examples of shuttering materials include plywood, timber

  • Answered by AI
  • Q2. Wooden shuttering
  • Q3. Column shuttering & suporting
  • Q4. Supervision & technically guide
  • Q5. One day target completion
  • Ans. 

    The one day target completion refers to completing a specific task within a 24-hour period.

    • Set clear and achievable goals for the day

    • Prioritize tasks based on urgency and importance

    • Delegate tasks if necessary to meet the deadline

    • Monitor progress throughout the day and make adjustments as needed

  • Answered by AI
  • Q6. Site management
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. CS material code
  • Q2. Use CS electrodes code
  • Ans. 

    CS electrodes are used for welding carbon steel materials according to specific codes.

    • CS electrodes are classified based on the American Welding Society (AWS) code, such as E6010, E7018, etc.

    • CS electrodes are used for welding carbon steel materials in various industries like construction, manufacturing, and infrastructure.

    • CS electrodes must be selected based on the specific requirements of the welding project, includin...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Read learn and crack interview

L&T Construction Interview FAQs

How many rounds are there in L&T Construction Welding Foreman interview?
L&T Construction interview process usually has 3 rounds. The most common rounds in the L&T Construction interview process are Resume Shortlist, Aptitude Test and Technical.
What are the top questions asked in L&T Construction Welding Foreman interview?

Some of the top questions asked at the L&T Construction Welding Foreman interview -

  1. Wedding rela...read more
  2. Welding qc rela...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.3
 • 400 Interviews
Dilip Buildcon Interview Questions
4.0
 • 138 Interviews
G R Infraprojects Interview Questions
4.1
 • 128 Interviews
AtkinsRealis Interview Questions
4.0
 • 84 Interviews
GMR Group Interview Questions
4.1
 • 75 Interviews
View all
L&T Construction Welding Foreman Salary
based on 4 salaries
₹1 L/yr - ₹8 L/yr
At par with the average Welding Foreman Salary in India
View more details
Assistant Manager
1.1k salaries
unlock blur

₹6 L/yr - ₹18.2 L/yr

Senior Engineer
662 salaries
unlock blur

₹3 L/yr - ₹12 L/yr

Assistant Construction Manager
528 salaries
unlock blur

₹5.4 L/yr - ₹17.5 L/yr

Civil Site Engineer
383 salaries
unlock blur

₹1.2 L/yr - ₹8.4 L/yr

Assistant Engineering Manager
321 salaries
unlock blur

₹6 L/yr - ₹17 L/yr

Explore more salaries
Compare L&T Construction with

Tata Projects

4.3
Compare

Shapoorji Pallonji Group

4.2
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.9
Compare

Calculate your in-hand salary

Confused about how your in-hand salary is calculated? Enter your annual salary (CTC) and get your in-hand salary
Did you find this page helpful?
Yes No
write
Share an Interview