Filter interviews by
I was interviewed in Aug 2019.
There are various types of structures, including buildings, bridges, dams, tunnels, and towers.
Structures can be classified based on their purpose, design, and materials used.
Buildings can be further classified into residential, commercial, and industrial structures.
Bridges can be classified into beam, arch, suspension, and cable-stayed bridges.
Dams can be classified into gravity, arch, buttress, and embankment dams.
Tu...
Density is the measure of mass per unit volume of a substance.
It is a physical property of matter.
It is calculated by dividing the mass of a substance by its volume.
Units of density include kg/mÂł, g/cmÂł, and lb/ftÂł.
Density can be used to identify substances and determine their purity.
For example, gold has a density of 19.3 g/cmÂł, while aluminum has a density of 2.7 g/cmÂł.
There are two types of density construction: compacted and loose.
Compacted density construction involves compressing the material to increase its density, such as in road construction.
Loose density construction involves leaving the material in its natural state, such as in landscaping.
The type of density construction used depends on the intended use of the material and the desired level of compaction.
Other factors that...
Tests for construction joints include visual inspection, water tightness test, and load transfer test.
Visual inspection to check for proper joint alignment and sealant application
Water tightness test to ensure no water leakage through the joint
Load transfer test to verify the joint can handle the intended load
Other tests may include pull-out test, shear test, and compression test
Testing frequency and methods may vary d...
I was interviewed in Dec 2024.
I am a Senior Engineer with 10+ years of experience in software development and project management.
10+ years of experience in software development
Strong project management skills
Proficient in multiple programming languages such as Java, Python, and C++
Designing and implementing complex software solutions for various projects.
Leading a team of engineers to develop new features and enhancements.
Collaborating with cross-functional teams to ensure project success.
Troubleshooting and resolving technical issues in a timely manner.
Participating in code reviews and providing constructive feedback.
Staying up-to-date with industry trends and technologies to improve processes.
I am a Senior Engineer with 10+ years of experience in software development, specializing in backend systems and cloud technologies.
10+ years of experience in software development
Specialize in backend systems and cloud technologies
Strong problem-solving skills
Experience with languages such as Java, Python, and SQL
Seeking new challenges and growth opportunities
Desire for career advancement
Limited growth potential in current role
Seeking new challenges and projects
Interested in working with new technologies or industries
L&T Construction interview questions for popular designations
Good ssjjdd jdhd dhebd dhdjd dhdhe jsjs HD shhd
I am a recent graduate with a degree in Business Administration and a passion for marketing and project management.
Recent graduate with a degree in Business Administration
Passionate about marketing and project management
Strong communication and organizational skills
Experience in internships and extracurricular activities
Materials used in road construction include asphalt, concrete, gravel, and crushed stone.
Asphalt is a common material used for road surfaces due to its durability and flexibility.
Concrete is often used for highways and major roads because of its strength and longevity.
Gravel is used for rural roads and driveways as a cost-effective option.
Crushed stone is used as a base layer for roads to provide stability and drainage...
Strength required for construction of a bridge includes structural stability, load-bearing capacity, and durability.
Structural stability to withstand various forces such as wind, traffic, and seismic activity
Load-bearing capacity to support the weight of vehicles, pedestrians, and other loads
Durability to resist corrosion, weathering, and wear over time
Materials like steel, concrete, and composite materials are commonl
General instructions for building construction involve following safety regulations, using proper materials, and ensuring structural integrity.
Ensure compliance with building codes and regulations
Use quality materials to ensure durability and longevity
Follow proper construction techniques to ensure structural integrity
Ensure proper foundation and support for the building
Consider environmental factors and sustainability...
The tallest height is the highest point above a given level or surface.
Height is a measurement of how tall something is
The tallest height on Earth is the summit of Mount Everest at 29,032 feet
Height can also refer to the highest point reached by something like a rocket or airplane
Get interview-ready with Top L&T Construction Interview Questions
I was interviewed in Feb 2025.
Reasoning and English
My favorite subject is Mechanical Engineering because I enjoy learning about how machines work and designing new technologies.
I have always been fascinated by the principles of mechanics and thermodynamics
I enjoy working on projects that involve designing and building machines
I find the process of problem-solving in mechanical engineering to be challenging and rewarding
I was interviewed in Jan 2025.
Traversing in data structures or algorithms refers to visiting and processing each element in a data structure in a specific order.
Traversing a binary tree involves visiting each node in a specific order such as in-order, pre-order, or post-order traversal.
In array traversal, each element of the array is accessed and processed sequentially.
Graph traversal algorithms like Depth First Search (DFS) and Breadth First Searc...
Level shifting is the process of changing the voltage level of a signal from one level to another.
Level shifting is commonly used in electronics to ensure compatibility between different components or systems.
It can involve using voltage level shifters or simple resistor networks.
For example, shifting a 3.3V signal to a 5V signal for proper communication between devices.
The list count of ts refers to the number of occurrences of the letter 't' followed by the letter 's' in a given list.
Count the number of times 'ts' appears in the list
Ignore cases where 't' and 's' are not directly next to each other
Example: ['cats', 'dogs', 'tsunami'] would have a list count of 1
I was interviewed in Jan 2025.
I am motivated to join your company because of its strong reputation in the industry, opportunities for growth and development, and the chance to work on challenging projects.
Strong reputation in the industry
Opportunities for growth and development
Challenging projects
I am looking for new challenges and opportunities for growth in a different company like L&T Construction.
Seeking new challenges and opportunities for growth
Interested in the projects and work culture at L&T Construction
Want to broaden my skill set and experience by working in a different environment
Local problems like administration, political interference, permissions in a project within a municipal corporation area can be managed through effective communication and collaboration.
Establish strong relationships with local administration officials and politicians to address any issues that may arise
Clearly communicate the project's goals and benefits to gain support from local stakeholders
Ensure all necessary perm...
I was interviewed in Jan 2025.
I am a safety officer, I have 2 years of experience, currently I am working in Hyundai construction equipment Pune.
I have done fire industrial safety management course from National Technical Institute in Jamshedpur and have completed my 12th, basic courses ADCA Excel MS office MS PowerPoint etc.
It is a construction line.
Construction line involves building structures like houses, roads, bridges, etc.
Industrial line typically refers to manufacturing processes in factories.
Examples of construction line companies: Bechtel, Fluor Corporation
Examples of industrial line companies: General Electric, Toyota
Safety assignments can involve identifying hazards, assessing risks, and developing safety procedures.
Identifying hazards Identify potential hazards, Decide who might be harmed and how, and Evaluate the risks.
Top trending discussions
The duration of L&T Construction interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 846 interviews
Interview experience
based on 6k reviews
Rating in categories
Assistant Manager
1.1k
salaries
| â‚ą0 L/yr - â‚ą0 L/yr |
Senior Engineer
703
salaries
| â‚ą0 L/yr - â‚ą0 L/yr |
Assistant Construction Manager
504
salaries
| â‚ą0 L/yr - â‚ą0 L/yr |
Civil Site Engineer
393
salaries
| â‚ą0 L/yr - â‚ą0 L/yr |
Assistant Engineering Manager
323
salaries
| â‚ą0 L/yr - â‚ą0 L/yr |
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company
GAMMON INDIA