Upload Button Icon Add office photos

Filter interviews by

L&T Construction System Analyst Interview Questions and Answers

Updated 15 Mar 2024

L&T Construction System Analyst Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via campus placement at GMR Institute of Technology, Srikakulam and was interviewed before Mar 2023. There were 3 interview rounds.

Round 1 - Aptitude Test 

Logical reasoning, Verbal, and some physics related questions

Round 2 - Technical 

(1 Question)

  • Q1. Technical skills
Round 3 - HR 

(1 Question)

  • Q1. Personality test

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Profession ......................
  • Q2. Education..............

Interview Preparation Tips

Interview preparation tips for other job seekers - good

I applied via Referral and was interviewed in May 2021. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. Basically it is a one of the largest constraction company in india today.and it have so many toll plaza.and I am selected for an toll plaza system basically toll plaza related questions asked like your cur...
  • Q2. What is the reason of blacklist vehicle.what is new in ICD 2.5,cross tag cound,duplicated count,boom barrier connection,AVC related questions everything about your corrent organization system.
  • Ans. 

    Blacklisting vehicles is done for security reasons. ICD 2.5 introduces new features like cross tag count and boom barrier connection.

    • Blacklisting vehicles is done to prevent security threats.

    • ICD 2.5 has new features like cross tag count and boom barrier connection.

    • Duplicated count helps in identifying duplicate tags.

    • AVC related questions are related to Automatic Vehicle Classification.

    • Our current organization system fo

  • Answered by AI
  • Q3. Your current salary your expectations?

Interview Preparation Tips

Interview preparation tips for other job seekers - Knows all your current organization systems related information and all updated thing,be confident and positive.

Interview Questionnaire 

3 Questions

  • Q1. What is TCP ip
  • Ans. 

    TCP/IP is a set of protocols that allows computers to communicate over the internet.

    • TCP/IP stands for Transmission Control Protocol/Internet Protocol.

    • It is a suite of communication protocols that enables reliable and secure data transmission.

    • TCP/IP provides addressing, routing, and error-checking capabilities.

    • It is the foundation of the internet and is used for various applications like web browsing, email, file transf...

  • Answered by AI
  • Q2. How to add an ip in system
  • Ans. 

    To add an IP in a system, you can use the network settings or command line tools.

    • In Windows, go to Control Panel > Network and Internet > Network and Sharing Center > Change adapter settings. Right-click on the network adapter and select Properties. Double-click on Internet Protocol Version 4 (TCP/IPv4) and enter the IP address.

    • In Linux, open the terminal and use the ifconfig or ip command to add an IP address to a net...

  • Answered by AI
  • Q3. Equipment power input and working

Skills evaluated in this interview

I applied via Naukri.com and was interviewed before Sep 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Technical questions and scenarios

Interview Preparation Tips

Interview preparation tips for other job seekers - If you are good in technical knowledge you can crack interview easily.

L&T Construction Interview FAQs

How many rounds are there in L&T Construction System Analyst interview?
L&T Construction interview process usually has 3 rounds. The most common rounds in the L&T Construction interview process are Technical, HR and Aptitude Test.
What are the top questions asked in L&T Construction System Analyst interview?

Some of the top questions asked at the L&T Construction System Analyst interview -

  1. Technical ski...read more
  2. Personality t...read more

Tell us how to improve this page.

L&T Construction System Analyst Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 414 Interviews
Dilip Buildcon Interview Questions
4.0
 • 139 Interviews
G R Infraprojects Interview Questions
4.1
 • 130 Interviews
AtkinsRealis Interview Questions
4.0
 • 84 Interviews
GMR Group Interview Questions
4.1
 • 80 Interviews
View all
L&T Construction System Analyst Salary
based on 13 salaries
₹6 L/yr - ₹11 L/yr
35% less than the average System Analyst Salary in India
View more details

L&T Construction System Analyst Reviews and Ratings

based on 3 reviews

3.4/5

Rating in categories

3.6

Skill development

2.8

Work-life balance

2.5

Salary

5.0

Job security

2.1

Company culture

2.5

Promotions

3.6

Work satisfaction

Explore 3 Reviews and Ratings
Assistant Manager
1.1k salaries
unlock blur

₹6 L/yr - ₹18.2 L/yr

Senior Engineer
710 salaries
unlock blur

₹3 L/yr - ₹12 L/yr

Assistant Construction Manager
523 salaries
unlock blur

₹5.4 L/yr - ₹17 L/yr

Assistant Engineering Manager
326 salaries
unlock blur

₹6 L/yr - ₹17 L/yr

Civil Site Engineer
315 salaries
unlock blur

₹1.2 L/yr - ₹8.3 L/yr

Explore more salaries
Compare L&T Construction with

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview