L&T Construction Project Trainee Interview Questions and Answers

Updated 17 Aug 2024

L&T Construction Project Trainee Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Jul 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

Nice. It's very good

Round 2 - Coding Test 

2 questions based on DSA. THEN INTERVIEW

Interview Preparation Tips

Interview preparation tips for other job seekers - Learn DSA and Core subjects.

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via LinkedIn and was interviewed in Feb 2024. There was 1 interview round.

Round 1 - Technical 

(6 Questions)

  • Q1. General Introduction
  • Q2. Questions related to previous experience
  • Q3. MS Project questions
  • Q4. Contract Management
  • Q5. Earned value management
  • Q6. Concrete technology, IS codes, mix design,productivity analysis

Interview Preparation Tips

Interview preparation tips for other job seekers - Questions from basics to detailed were asked
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Mar 2024. There was 1 interview round.

Round 1 - One-on-one 

(3 Questions)

  • Q1. Tell me about yourself
  • Q2. What is key things to start a project
  • Q3. WCC and it helps
  • Ans. 

    WCC stands for Work Control Center and it helps in coordinating and managing project tasks efficiently.

    • WCC serves as a central hub for project information and communication

    • It helps in assigning tasks, tracking progress, and resolving issues in a timely manner

    • Example: WCC software like Asana or Trello can be used to streamline project coordination

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Dec 2023. There were 4 interview rounds.

Round 1 - Aptitude Test 

Easy to Moderate Level Questions

Round 2 - Technical 

(1 Question)

  • Q1. Medium to Difficult and Numerical Question
Round 3 - One-on-one 

(1 Question)

  • Q1. Technical Question From Qualification and Resume Based
Round 4 - HR 

(1 Question)

  • Q1. Introduction, Some General Knowledge
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Jan 2024.

Round 1 - Technical 

(2 Questions)

  • Q1. What is the pressure rating for steam pipes?
  • Q2. What did you do in your project? And asked in depth questions including construction and mechanical engineering
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Feb 2019. There were 2 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Technical questions related to work
  • Q2. Previous job experiences
Round 1 - Technical 

(14 Questions)

  • Q1. Two types road 1 Flexible pavement 2 Rigid pavement Before new project start Surveying, NGL,Encroachment , OGL
  • Q2. Flexible pavement:- 1:- EMBANKMENT:- Take thicknesses 3m approximately as per site conditions 95% compaction 1:- large size soil particles 75mm lumps and cloud. Liquid limit <50%, plastic limit<25% Swel...
  • Ans. 

    The question is about the specifications of different layers in a flexible pavement.

    • The embankment layer has a thickness of 3m and is compacted at 95% with large size soil particles and effective CBR as per design.

    • The subgrade layer has a total thickness of 500mm and is compacted at 97% with large size soil particles and effective CBR as per design.

    • The GSB layer has a total thickness of 300mm and is a mixture of aggreg...

  • Answered by AI
  • Q3. Emulsion:- Prime coat:- low viscous cut back bitumen on wmm surfaces area and filling pores and void. Tackcoat:- Light application bitumen , asphalt, emulsion and diluted water on wmm surfaces area.
  • Q4. DBM:- it total thickness of 150mm compacted two layer 75mm and 75mm It mix with aggregate 20mm to 28mm and bitumen VG30 GRADE.apply on si
  • Q5. Tackcoat;- light application bitumen, asphalt,emulsion and dilute water on DBM Surfaces area. BC:- It is total thickness of 50mm compacted ,aggregate size 13.1mm and bitumen VG30 grade on DBM. Seal co...
  • Q6. Laying of bitumen concete. :-130 degree celceious to 150 degree celceious. Rolling on bitumen concete :-80 degree celceious 100 degree celceious
  • Q7. Rigid pavements:- 1 :- DLC= 150MM 2:-PQC = 300MM
  • Q8. DLC:-Material sutabilitey 1:- Aggregate size 26.5 mm 2:- water absorption max2% 3:- Soundness test Naso4 - 12% Mgso4-18% 4:- Angle of abr...
  • Q9. DESINGN PROCEDURE :- 1:- Use M15 grade concrete. Aggregate and cement ratio 1:2 2:- The minimum cement content 150kg percum. If flayash is more than 20% the minimum cement contents 120 kg percum. 3:- T...
  • Ans. 

    Design procedure for laying M15 grade concrete with specific requirements for cement content, compressive strength, and compaction.

    • Use M15 grade concrete with aggregate and cement ratio of 1:2

    • Minimum cement content of 150kg per cum, or 120kg per cum if flyash is more than 20%

    • Ensure compressive strength of 10MPA after 7 days curing, with no sample below 7.5MPA

    • Ensure DLC premix batching plant material is homogeneous and ...

  • Answered by AI
  • Q10. PQC:- Material sutabilitey 1:- Aggregate size 31.5mm Material sutabilitey of pqc from Soundness test to sand equivalent
  • Q11. Design procedure of PQC:- Use M40 grade concrete. 1:- The minimum cement content 360kg percum. If flyash more than 20% the minimum cement contents 310 kg percum. 2:-The flexuar strength of cement ...
  • Ans. 

    Design procedure for PQC using M40 grade concrete

    • Minimum cement content of 360kg per cum

    • Flexural strength of 4.5MPA and compressive strength of 40MPA after 28-day curing

    • Dowel bars and tie bars provided for load transfer and prevention of cracking and deflection

    • PQC mix prepared in pre-mix batching plant and transported to site

    • Separation membrane and texturing and sawing operations performed for proper finishing

    • 28-day cu...

  • Answered by AI
  • Q12. DIFFERENT TYPES OF CARRIAGE WAY 1 :- Single lane- 3.75 m 2:- Multlane;- 3.50m 3:- Inter mediate lane:- 5.5m 4 Two lane :- 7.5 m 5:- Thee lane:- 10.50m 6:- Four lane:- 7.5m+ 7.5m
  • Ans. 

    Different types of carriage way include single lane, multilane, intermediate lane, two lane, three lane, and four lane.

    • Single lane has a width of 3.75m

    • Multilane has a width of 3.50m

    • Intermediate lane has a width of 5.5m

    • Two lane has a width of 7.5m

    • Three lane has a width of 10.50m

    • Four lane has a width of 7.5m + 7.5m

  • Answered by AI
  • Q13. TYPES CAMBER 1 :- STRIGTH CAMBER 2:- PAROBOLIC CABER 3 STRAIGHT AND PARABOLIC CAMBER cc amber 1 in 50 to 1in60 Bitumen CAMBER 1in40 to 1in 50 camber Wmm camber 1in30 to 1in40
  • Q14. CBR;- Developed by the California division State of high way to classify and evaluting 1: soil subgrade 2:-GSB CBR-=3% TO 15% Clay=<8% Sand 15% to 35% Gravel >25% THICKNESSES OF PAVEMENT T= (1.75P/...

Interview Preparation Tips

Interview preparation tips for other job seekers - National high way 2 to 4 lane
Expressway way 6 to 8 lane
Minimum right of way 4 lane 6 lane =60M
EXPRESS WAY HAVE MANY SMART AND
INTEILIGENT FEATURS
HTMS = high traffic management system
VIDS=visual incident deduction system0
Expressway advance features to lays
1;- Excess ramp
2:-Line divder
3:- Grade separation
4;- Elevated section
Expressway is no multiple lane
4 lane cast = 8 to 10 core rupees/ km
6 lane coast = 14 core rs / km
Round 1 - Technical 

(15 Questions)

  • Q1. Two types of pavent 1:- Flexible pavement 2:-rigid pavement Types of progect 1:- New progect 2:- Realigment of road
  • Ans. 

    Flexible pavement and rigid pavement are two types of pavements used in different types of road projects.

    • Flexible pavement is made of multiple layers of materials that can flex under traffic loads.

    • Rigid pavement is made of a single layer of concrete or asphalt that is rigid and does not flex.

    • New projects involve constructing roads from scratch, while realignment projects involve changing the alignment of existing roads...

  • Answered by AI
  • Q2. Constrution process:- surveying, enchrochment ,NGL, OGL
  • Q3. Flexibile road :- 1:- Embankment as per site now taken thickness 3M , Large size of soil particles75mm lumps& cloud , liquid index<50% , plastic limit <25% , Swelling &shrinkage <50% , effective cbr as per...
  • Q4. 3:- confinement layer or new blanket
  • Q5. 4:- WMM:- It is mixture of aggregate and binding material, aggregate size4.75mm to 20mm. Binding material used stone dust ,morum,flyash, total compacted 300mm. Two layer 150mm &150mm. It is mix in pre mix...
  • Q6. (a) Prime coat:- low viscous cut back bitumen on wmm surface area fil up pores and void. (b) Tack coat:- Light application bitumen, ashphalt,emulsion,and dilute water applied on the prim coat.
  • Ans. 

    The question describes the application of prime coat and tack coat on a WMM surface.

    • Prime coat is a low viscous cut back bitumen used to fill up pores and voids on a WMM surface.

    • Tack coat is a light application of bitumen, asphalt, emulsion, or dilute water applied on the prime coat.

    • The purpose of the prime coat is to bond the WMM surface with the subsequent layers of asphalt.

    • The tack coat helps in providing a strong b...

  • Answered by AI
  • Q7. 5 :- DBM:- It is total thickness 150mm. Compacted in two layer 100mm & 50mm Aggregate size 20mm to 28mm ,bitumen viscous grade VG30 grade bitumen mixture.
  • Q8. Tack coat :- light application bitumen ,Asphalt, emulsion,and diluted water on the surface area of DBM.
  • Q9. 6:- BC :- It is total thicness 50 mm compacted. It is mixture of aggregate size 13.1mm bitumen VG30 grade viscous.
  • Q10. 7:- Seal :- 6mm to 8mm thickness grvel or coarse sand mix with bitumen on BC course .provided camber on flexble pavement 1in 40 to 1in 40.
  • Q11. RIGID PAVEMENT :- All the process of embankment to GSB is same. DLC:- Specification 1 :- Aggregate size 26.5 mm 2:-water absorption<2% 3 :- soundness test :- Naso4 12% ...
  • Q12. DESIGIN PROCEDURE :- DLC thickness 150mm. 1:- use M15 grade concrete,max aggregate cement ratio 12:1 2:-The minimum cement content 150kg per cum. If flayash is more than >20% the mini.mum cement content. ...
  • Ans. 

    Design procedure for 150mm DLC thickness using M15 grade concrete with specific requirements for cement content, testing, mixing, transportation, compaction, and curing.

    • Use M15 grade concrete with maximum aggregate cement ratio of 12:1

    • Minimum cement content of 150kg per cum, or 120kg per cum if flyash is more than 20%

    • Perform 5 sample cube test after 7 day curing with strength of 10 MPA, and 1 sample cube test after 7 d...

  • Answered by AI
  • Q13. PQC:- TOTAL THICKNESS 300MM Aggregate size 31.5mm. All specificition is same as DLC.
  • Q14. Design procedure :- 1 :- The minimum cement content 360 kg per cum.if the fly ash is more than 20% the minimum cement content 310 kg per cum. 2 :-The flexure strength of cement concrete after 28 days cur...
  • Ans. 

    Design procedure for Senior Project Manager role including cement content, strength, joint design, and surface finishing.

    • Minimum cement content of 360 kg per cum, or 310 kg per cum if fly ash is more than 20%

    • Flexure strength of cement concrete after 28 days curing is 4.5 MPA

    • Compressive strength of cement concrete after 28 days curing is 40 MPA

    • Dowel bar provided for expansion joint vehicle load transfer between slabs

    • Tie...

  • Answered by AI
  • Q15. CBR:- Developed by calforina division state highway to classiy soil sub grade &GSB CBR=3%-25% CLAY<8% SAND 15% -35% GRAVEL>25% THICKNESS OF PAVEMENT T=( 1.75P/CBR - A/3.14)

Interview Preparation Tips

Interview preparation tips for other job seekers - Other type as per location of the site.
Type of material used in high way.
highway -2 to 4 lane
Expressway- 6 to 8 lane
VUP =5.5 M
LVUP=3.5M
CUP=3M

I applied via Job Portal and was interviewed in Nov 2021. There were 3 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. Structure related pile foundation
  • Q2. Pile testing ,girder stressing
  • Q3. How much miller required for 500 cum concrete transporting
  • Ans. 

    The amount of miller required for transporting 500 cum concrete depends on various factors.

    • The type of miller being used

    • The distance the concrete needs to be transported

    • The size of the project

    • The time frame for completing the project

    • The availability of resources

    • The budget allocated for the project

  • Answered by AI
  • Q4. Girder launching
  • Q5. Box underpasses

Interview Preparation Tips

Interview preparation tips for other job seekers - Give only answer to the point which is no you
Round 1 - Group Discussion 

How to ensure team.efficiency

Round 2 - Case Study 

A case study on conflict management

Round 3 - One-on-one 

(1 Question)

  • Q1. Why do you want this job

Interview Preparation Tips

Interview preparation tips for other job seekers - Candidates should be lubricated before the final round with the domain head

L&T Construction Interview FAQs

How many rounds are there in L&T Construction Project Trainee interview?
L&T Construction interview process usually has 2 rounds. The most common rounds in the L&T Construction interview process are Aptitude Test and Coding Test.

Tell us how to improve this page.

L&T Construction Project Trainee Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Tata Projects Interview Questions
4.2
 • 420 Interviews
Dilip Buildcon Interview Questions
4.0
 • 140 Interviews
G R Infraprojects Interview Questions
4.1
 • 131 Interviews
AtkinsRealis Interview Questions
4.0
 • 84 Interviews
GMR Group Interview Questions
4.1
 • 80 Interviews
View all

L&T Construction Project Trainee Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

5.0

Salary

5.0

Job security

5.0

Company culture

5.0

Promotions

5.0

Work satisfaction

Explore 1 Review and Rating
Assistant Manager
1.1k salaries
unlock blur

₹6 L/yr - ₹18.2 L/yr

Senior Engineer
714 salaries
unlock blur

₹3 L/yr - ₹12 L/yr

Assistant Construction Manager
499 salaries
unlock blur

₹5.4 L/yr - ₹17.5 L/yr

Civil Site Engineer
368 salaries
unlock blur

₹1.2 L/yr - ₹8.3 L/yr

Construction Management
328 salaries
unlock blur

₹7.8 L/yr - ₹28.5 L/yr

Explore more salaries
Compare L&T Construction with

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare

GAMMON INDIA

3.8
Compare
Did you find this page helpful?
Yes No
write
Share an Interview